Proposed Tech Specs,Revising Section 3.8.1.1 Action Statements Re Diesel Generator Surveillance Testing
ML20128M321
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/28/1985
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20128M312 List:
References
NUDOCS 8507110662
Download: ML20128M321 (14)


Text

- .

ENCLOSURE I TO NLS-85-516 PROPOSED TECilNICAL SPECIFICATION PAGES BRUNSWICK-1 DIESEL GENERATOR OPERABILITY (35TSB01) t J

I i

i

)

1

SUMMARY

LIST OF REVISIONS PAGE NO. DESCRIPTION 3/43-1 Section 3/4 8.1 has been reformatted to more closely resemble those pages provided in Generic Letter 84-15.

Former Action a has been divided into Action a. for an of fsite circuit inoperable, and Action b, for a diesel generator inoperable.

Action at

1) Extended time requirement for performing Surveillance Requirement 4.3.1.i.2.a.4 (Diesel Quick-Start) from within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> '

to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2) Surveillance Requirement 4.3.1.1.2.a.5 (Diesel Loading) added.
3) Surveillance Requirement 4.3.1.1.2.a.4 (Diesel Quick Star t) interval lengthened from 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
4) Extended the allowed outage time for an inoperable of fsite circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days.

Action b

1) Note added to clarify the definition of an inoperable diesel generator.
2) E stended time requirement for performing Surveillance Requirement 4.3.1.l.7.a.4 (Diesel Quick Start) from within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3) Surveillanc.e Requirement 4.3 l.l.2.a.5 (Diesel Loading) added.
4) Surseillance Requirement 4.3.1.1.2.a.4 (Diesel Quick Start) intersal lengthened from 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
3) Extended the allowed outage time for an inoperable diesc!

generator from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days.

3/48-2 Former Action b has been changed to Action c.

Action ca

1) Surveillance Requirement 4.3.1.1.2.a.S (Diesel Loading) added.
2) Restoration of both of frite circuits and four diesel generators to operable status required within 7 days from time of critical loss (consistent with Action a/b), previously limited to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(96' MAT /mf)

Former Action c has been changed to Action d.

Action di

1) Surveillance Requirement 4.3.1.1.a.)(Diesel Loading) added.
2) Restoration of second of fsite circuits to operable status lengthened '

from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to / days (consistent with Action a).

3) Addition of " Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />"if at least one of inoperable of fsite sources is not operable af ter going to Hot Shutdown.

I Former Action d has been changed to Action e.

Action et ,

1) Surveillance Requirement 4.3.1.1.a.)(Diesel Loading) added.
2) Addition of restoration of one diesel generator as required by l Action b.

3)

Restoration 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 of daysfourth diesel generator (consistent with Actionto b .op)erable lengthened from I 3/43-3 Note involving one time only exemption to Surveillance Requirement 4.3.1.1.2.d.3.5 deleted.

Note regarding start tin.e added (pertaining to Surveillance Requirement 4.3.1.1.2.u).

Mathematical symbols 5 and > changed to phrases.

3/43-4 Note involving one time only exemption to Surveillance Requirement 4.8.1.1.2.d.7 deleted. ,

l Mathematical symbol 2 changed to " greater than or equal to".

I l >

l (945 MAT /st) i

(BSEP-1-43) 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATION OF ONE OR BOTil UNITS LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the of f site transmission network and the onsite Class IE distribution system, and
b. Four separate and independent diesel generators, each with:
1. A separato engine-mounted fuel tank containing a minimum of 100 gallons of fuel,
2. A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and
3. A separate fuel transfer pump.
c. A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

of f site sources by performing Surveillance Roquiremont 4.8.1.1. l.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once por 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaf ter; and demonstrate the OPERABILITY of the diesel generators by performing l

l Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least onco por 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; restora tho l

inoperable offsite circuit to OPERABLE status within 7 days or be in i at least Il0T SilUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SilUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With a diesol generator of the above required A.C. electrient power sources inoperable,* demonstrate the OPERABILITY of the A.C. offsito l

sources by performing Surveillance Requiremont 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least onco per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thoroaf ter; and demonstrato the OPERABILITY of the remaining diosol generators by performing Survettlanco Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least onco per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; rostoro the j

inoperable diesel generator to OPERABLE status within 7 days or ho in at least il0T SilVTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SilUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

  • A diesol generator shall be considered to ha inoperable f rom the timo of failure until it satisfies the requirements of Surveillanco Roquiremont 4.8.1.1.2.

3/4 8-1 Amendmont No.

BRUNSWICK - UNIT 1 i

r

(BSEP-1-43)

ELECTRICAL POWER SYSTEMS LIMITINC CONDITION FOR OPERATION (Continued)

ACTION (Continued)

c. With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source and diesel generators by performing Surveillance Requirements 4.8.1.'1.1.a, 4.8.1.1.2.a.4, and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafters restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one A.C. power source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required in ACTION a or ACTION b as applicablel restore two offsite circuits and four diesel generators to OPERABLE status within 7 days from the time of initial loss or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of four diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter unless the diesel l

generators are already operatingt restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one offsite source rescored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION al restore two offsite circuits to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of the offsite A.C. circuits and the remaining diesel generators by performing Surveillance Requirements , 4.8.1.1.1.a. 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at I least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafters restore at least three diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION bl restore four diesel generators to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BRUNSW1CK - UNIT 1 3/4 8-2 Amendment No.

m

(BSEP-1-43)

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall bet

a. Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and
b. Demonstrated OPERABLE at least once per 18 months during shutdown by manually transferring unit power supply from the normal circuit to the alternate circuit.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: ,

a. At least once per 31 days on a STACCERED TEST BASIS by:
1. Verifying the fuel level In the engine-mounted fuel tank,
2. Verifying the fuel level in the day fuel tank, i 1
3. Verifying the fuel transfer pump can be started and transfers {

fuel from the day tank to the engine mounted tank, )

4. Verifying the liesel starts and accelerates to at least 514 rpm in less than or equal to 10 seconds,*
5. Verifying the generator is synchronized, loaded to greater than or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
b. At least once per 31 days by verifying the fuel level in the plant fuel storage tank.
c. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTH-D270-65, is within the acceptable limits specified in Table 1 of ASTM-D975-74 when checked for viscosity, water and sediment, 1
  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures reconinended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.

BRUNSWICK - UNIT 1 3/4 8-3 Amendment No.

l L

( BSEP-1-43) i m

ELECTRICAL POWER SYSTEMS

. SURVEILLANCE REQUIREMENTS (Continued) d.' At least once per 18 months during shutdown by:

1. Subj$cting the diesel to an l'nspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load equal to one core spray pump without tripping, ,

i i

.3.- Simulating a loss of offsite power in conjunction with an emergency core cooling system test signal, and: .

a) Verifying de-energization of the emergency buses and load shedding from the emergency buses.

b) i Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses with permanently connectad loads, energizes the auto-connected

^

loads through the load sequence relays and operates for greater than or equal to 5 minutes while its generator is loaded.with the emergency loads.

i 4. Verifying,that on the emergency core cooling system test signal, I all dieJeL; generator trips except engine overspeed, generator

, differensial, low lube oil pressure, reverse power, loss of field and phase overcurrent with voltage restraint, are automatically bypassed.'l / '

s, 4 s ,

' bI , 5. Verifying the diesel generator operates for greater than or

p. equal to 60 minutes while loa (ed to greater than or equal to 3500 kw.
6. Verifying that the auto-connected loads to each diesel generator

.. do/not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 3850 kw.

L , 7. Verifying that the automatic load sequence relays are OPERABLE l with each load sequence timaiwithin 10% of the required value.

.e 1' 1 ,

s j p .' .)

1 ,

. . I r

' V) 4 l

1, . ,

.i (

BRUNSWICK - UNIT 1 3I48-4 Amendment No.

'\

L- p \ -

ENCLOSURE 2 TO NLS-85-316 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-2 DIESEL GENERATOR OPERABILITY (85TSB01)

I (965 MAT /mf)

A

1

SUMMARY

LIST OF REVISIONS PAGE NO. DESCRIPTION 3/48-1 Section 3/4 3.1 has been reformatted to more closely resemble those pages provided in Generic Letter 34-15.

Former Action a has been divided into Action a, for an offsite circuit inoperable, and Action b, for a diesel generator inoperable.

Action a:

1) Extended time requirement for performing Surveillance Requirement 4.3.1.1.2.a.4 (Diesel Quick-Start) from within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2) Surveillance Requirement 4.3.1.1.2.a.5 (Diesel Loading) added.
3) Surveillance Requirement 4.3.1.1.2.a.4 (Diesel Quick Start) interval lengthened from 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
4) Extended the allowed outage time for an inoperabic offsite circuit from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 dap.

Action b:

1) Note added to clarify the definition of an inoperable diesel generator.
2) Extended time requirenient for performing Surveillance Requirement 4.8.1.1.2.a.4 (Diesel Quick Start) from within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3) Surveillance Requirement 4.3.1.1.2.a.5 (Diesel Loading) added.
4) Surveillance Requirement 4.8.1.1.2.a.4 (Diesel Quick Start) interval lengthened from 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
5) Extended the allowed outage time for an inoperable diesel generator from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days.

3/48-2 Former Action b has been changed to Action c.

Action c:

1) Surveillance Requirement 4.8.1.1.2.a.5 (Diesel Loading) added.
2) Restoration of both of fsite circuits and four diesel generators to operable status required within 7 days from time of critical loss (consistent with Action a/b), previously limited to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(965MAThf )

i Former-Action c has been changed to Action d.

Action d:

1) Surveillance Requirement 4.8.1.1.a.5 (Diesel Loading) added.
2) Restoration of second offsite circuits to operable status lengthened from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days (consistent with Action a).
3) Addition of " Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />"if at least one of inoperable offsite sources is not operable af ter going to Hot Shutdown.

Former Action d has been changed to Action e.

Action e:

1) Surveillance Requirement 4.8.1.1.a.5 (Diesel Loading) added.
2) Addition of restoration of one diesel generator as required by Action b.
3) Restoration of fourth diesel generator to operable lengthened from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days (consistent with Action b).

3/48-3 Note involving one time only exemption to Surveillance Requirement 4.8.1.1.2.d.3.b deleted.

Note regarding start time added (pertaining to Surveillance Requirement 4.8.1.1.2.a.4).

Mathematical symbols < and 2 changed to phrases.

3/43-4 Note involving one time only exemption to Surveillance Requirement 4.3.1.1.2.d.7 deleted.

Mathematical symbol 2 changed to " greater than or equal to".

(965 MAT /mf )

L

(BSEP-2-41) 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATION OF ONE OR BOTH UNITS LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE: ,

a. Two physically independent circuits between the of fsite transmission network and the onsite Class 1E distribution system, and
b. Four separate and independent diesel generators, each with:
1. A separate engine-mounted fuel tank containing a minimum of 100 gallons of fuel,
2. A separate day fuel tank containing a minimum of 22,650 gallons of fuel, and
3. A separate fuel transfer pump.
c. A plant fuel storage tank containing a minimum of 74,000 gallons of fuel.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaf ter; and demonstrate the OPERABILITY of the diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereaf ter; restore the inoperable offsite circuit to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,

b. With a diesel generator of the above required A.C. electrical power sources inoperable,* demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaf ter; and demonstrate the OPERABILITY of the remaining diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereaf ter; restore the  !

inoperable diesel generator to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BRUNSWICK - UNIT 2 3/4 8-1 Amendment No.

E ___

(BSEP-2-41)

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued)

c. With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. offsite source and diesel generators by performing Surveillance Requirements 4.8.1.'1.1.a.

4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one A.C. power source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required in ACTION a or ACTION b as applicable; restore two offsite circuits and four diesel generators to OPERABLE status within 7 days from the time of initial loss or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. With two of the above required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of four diesel generators by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter unless the diesel generators are already operating; restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one offsite source restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION at restore two offsite circuits to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of the offsite A.C. circuits and the i remaining diesel generators by performing Surveillance Requirements 4.8.1.1.1.a, 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least three diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one diesel generator restored, demonstrate the OPERABILITY of the remaining A.C. power sources as required by ACTION bl restore four diesel generators to OPERABLE status within 7 days from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BRUNSWICK - UNIT 2 3/4 8-2 Amendment No.

(BSEP-2-41)

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall bet

a. Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and
b. Demonstrated OPERABLE at least once per 18 months during shutdown by manually transferring unit power supply from the normal circuit to the alternate circuit.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. At least once per 31 days on a STACCERED TEST BASIS by:
1. Verifying the fuel level in the engine-mounted fuel tank,
2. Verifying the fuel level in the day fuel tank,
3. Verifying the fuel transfer pump can be started and transfers fuel from the day tank to the engine mounted tank,
4. Verifying the diesel starts and accelerates to at least 514 rpm in less than or equal to 10 seconds,*
5. Verifying the generator is synchronized, loaded to grea*.er than or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
b. At least once per 31 days by verifying the fuel level in the plant fuel storage tank.
c. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTH-D975-74 when checked for viscosity, water and sediment,
  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.

BRUNSWICK - UNIT 2 3/4 8-3 Amendment No.

( BSEP-2-41)

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

d. At least once per 18 months during shutdown by:
1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load equal to one core spray pump without tripping,
3. Simulating a loss of offsite power in conjunction with an emergency core cooling system test signal, and:

a) Verifying de-energization of the emergency buses and load shedding from the emergency buses.

b) Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency buses with permanently connected loads, energizes the auto-connected loads through the load sequence relays and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads.

4. Verifying that on the emergency core cooling system test signal, all diesel generator trips except engine overspeed, generator differential, low lube oil pressure, reverse power, loss of field and phase overcurrent with voltage restraint, are automatically bypassed.
5. Verifying the diesci generator operates for greater than or equal to 60 minutes while loaded to greater than or equal to 3500 kw.
6. Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 3850 kw.
7. Verifying that the automatic load sequence relays are OPERABLE with each load sequence time within 10% of the required value.

BRUNSWICK - UNIT 2 3/48-4 Amendment No.

~