|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18040B2891999-03-12012 March 1999 Proposed Tech Specs Including Rev 0 to EMF-1997(P)(A) Into TS Section 5.6.5 & Including Revised MCPR Safety Limits in TS Section 2.1.1.2 ML18040B2881999-01-12012 January 1999 Proposed Tech Specs Re ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A6711998-07-0808 July 1998 Proposed Tech Specs,Implementing Improved Tech Specs of NUREG-1433.Page B3.8-1 of Incoming Submittal Not Included ML17159A3261998-05-12012 May 1998 Proposed Tech Specs Re Removal of Fire Protection Program ML18026A4711997-02-11011 February 1997 Proposed Tech Specs Requesting Improved TSs LCO 3.10.3 & LCO 3.10.4 Be Approved for Use During Susquehanna Ses Unit 2 Eighth Refueling & Insp Outage Scheduled for 970315 ML20129D7851996-09-23023 September 1996 Proposed Tech Specs Re MSIVs Leakage Testing ML20116K3491996-08-0909 August 1996 Proposed Tech Specs Re Battery Load Profiles ML17158B5581996-03-20020 March 1996 Proposed Tech Specs,Changing Open Logic for HPCI Suction Valve HV-155/255-F042 in Order to Eliminate HPCI Pump auto- Transfer on High Suppression Pool Level ML20115A8171996-02-29029 February 1996 Proposed Tech Specs,Relocating Spec 3/4.9.6, Refueling Platform to Document Which Is Controlled Under Requirements of 10CFR50.59 ML20115A8211996-02-29029 February 1996 Proposed Tech Specs,Removing Rod Block Monitor Requirements from TS by Reducing Number of Rod Movements During Power Maneuvers ML17158B1071996-02-12012 February 1996 Proposed Tech Specs to Implement 10CFR50,App J,Option B & Establish New Spec 6.8.5, Primary Containment Leakage Rate Testing Program. ML17164A5801995-02-10010 February 1995 Proposed Tech Specs for Aot/Sti Extensions ML17164A4351994-11-21021 November 1994 Proposed Tech Specs Increasing MSIV Leakage Rate & Deleting MSIV-LCS ML17158A5441994-10-28028 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML20058F8281993-11-24024 November 1993 Proposed Tech Specs Re Power Uprate W/Increased Flow ML17157C2741993-04-0202 April 1993 Proposed TS 3.4.1.1.2 Re LCO for Recirculation Loops,Single Loop Operation ML20082P1871991-09-0404 September 1991 Proposed Tech Specs for HPCI Sys Low Pressure Surveillance Test Acceptance Criteria ML17157A3371990-09-24024 September 1990 Proposed Tech Specs in Support of Facility Cycle 5 Reload ML17157A2441990-07-0202 July 1990 Proposed Tech Specs to Support Cycle 6 Reload ML19325D7491989-10-19019 October 1989 Proposed Tech Specs 3.2.2 Eliminating Certain Requirements on One Time Basis for 3 Months ML17156B1101989-04-14014 April 1989 Proposed Tech Specs,Making Changes to Emergency Svc Water Sys,Per 10CFR50,App R ML17156A7291988-08-10010 August 1988 Proposed Tech Specs,Extending Operation During Cycle 4 W/ One Recirculation Loop Out of Svc ML18040A8741988-04-0606 April 1988 Proposed Tech Specs Re Radiation Monitoring Instrumentation ML17146B0891987-12-23023 December 1987 Proposed Tech Specs Index & Sections 3/4.2.1,3/4.2.2, 3/4.2.3,3/4.2.4,3/4.3.6,3/4.4.1,B 2.1,B 3/4.2.1,B 3/4.2.2, B 3/4.2.3 & B 3/4.4.1,to Support Cycle 3 Reload ML18040A8421987-06-10010 June 1987 Proposed Tech Specs,Increasing Load Profile for Batteries 1D612 & 1D622 ML18040A8341987-04-16016 April 1987 Proposed Tech Spec 4.1.3.1.4(a) Changing Requirements for Surveillance of Scram Discharge Vol Vent & Drain Valves ML18040A8261987-02-0909 February 1987 Proposed Tech Specs,Allowing Alternate Method of post-accident Drywell Gaseous Sampling & Providing Relief for Unnecessarily Restrictive Action Statement on Drywell Oxygen Analyzer ML20215C1291986-12-0909 December 1986 Proposed Tech Spec Tables 3.6.3-1 & 3.8.4.2-1,supporting Mods to Improve Containment Isolation Function & Testability of Feedwater Sys ML17146A4811986-08-0505 August 1986 Proposed Administrative Changes to Tech Specs ML20206J9471986-06-23023 June 1986 Proposed Tech Specs Changing Main Steam Line Radiation High Setpoint from Three Times Background to Seven Times Background ML17146A4161986-06-19019 June 1986 Proposed Tech Specs Re Cycle 2 Reload.Nshc Encl ML17146A3111986-03-27027 March 1986 Proposed Tech Spec Changes Providing Editorial Correction to Previously Approved Change for Unit 1 & Supporting Mods Which Enhance Capability of Drywell Cooling Sys for Unit 2 ML20141C9281986-03-27027 March 1986 Proposed Tech Specs Re Recirculation Sys W/One & Two Loop Operation,Supporting Operation W/One Recirculation Loop Out of Svc ML17146A2681986-02-10010 February 1986 Proposed Tech Specs,Reflecting Incorporation of Fifth Diesel Generator Into Plant Design ML20137G5781985-11-26026 November 1985 Proposed Tech Specs,Deleting Requirement for Operability of Refueling Floor Wall & High Exhaust Ducts & Railroad Access Exhaust Duct Radiation Monitoring Sys for Conditions 1,2 & 3 ML17156A1261985-04-11011 April 1985 Proposed Tech Spec Changes Re Single Loop Operation Requirement ML18040A7701985-02-11011 February 1985 Proposed Tech Specs Re Util Review Committee Membership ML17139C7431984-12-0606 December 1984 Proposed Tech Specs Separating Unit 1 from Unit 2 Battery Loads to Avoid Forced Shutdown of Unit 2 During Unit 1 Refueling Outage ML18040A7421984-09-24024 September 1984 Proposed Tech Specs,Revising Table 3.3.7.1-1, Radiation Monitoring Instrumentation. ML18040A7411984-09-0707 September 1984 Proposed Tech Specs Re Primary Containment Isolation Valves & Containment Sys Limiting Condition for Operation & Bases ML20078M6531983-10-20020 October 1983 Proposed Changes to Tech Spec Table 4.8.1.1.2-2 Re Settings for Emergency Svc Water Pump Timers ML17139B3301983-02-0303 February 1983 Proposed Tech Specs 2.2.1.1,3.2.2,4.2.2 & 3.3.6-2 Re Reactor Protection Sys Instrumentation,Average Power Range Monitor & Control Rod Block Instrumentation Setpoints ML17139B3311983-02-0303 February 1983 Proposed Tech Specs 3.4.3 & 4.4.3 Re RCS Leakage Detection Sys ML18031A4031982-10-19019 October 1982 Proposed Changes to Tech Spec Table 3.8.4.1-1 to Include More Conservative Type 2 Molded Case Circuit Breakers & to Add Previously Omitted Type 3 Molded Case Circuit Breakers 1999-03-12
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18040B2891999-03-12012 March 1999 Proposed Tech Specs Including Rev 0 to EMF-1997(P)(A) Into TS Section 5.6.5 & Including Revised MCPR Safety Limits in TS Section 2.1.1.2 ML18040B2881999-01-12012 January 1999 Proposed Tech Specs Re ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A6711998-07-0808 July 1998 Proposed Tech Specs,Implementing Improved Tech Specs of NUREG-1433.Page B3.8-1 of Incoming Submittal Not Included ML17159A3261998-05-12012 May 1998 Proposed Tech Specs Re Removal of Fire Protection Program ML20199C8741997-10-22022 October 1997 Rev 0 to NASI-00-507, Corrective Action Process Effectiveness Assessment ML18026A4711997-02-11011 February 1997 Proposed Tech Specs Requesting Improved TSs LCO 3.10.3 & LCO 3.10.4 Be Approved for Use During Susquehanna Ses Unit 2 Eighth Refueling & Insp Outage Scheduled for 970315 ML17158C0321997-01-0808 January 1997 Rev 4, Solid Radwaste Pcp. ML20129D7851996-09-23023 September 1996 Proposed Tech Specs Re MSIVs Leakage Testing ML20116K3491996-08-0909 August 1996 Proposed Tech Specs Re Battery Load Profiles ML17158B5581996-03-20020 March 1996 Proposed Tech Specs,Changing Open Logic for HPCI Suction Valve HV-155/255-F042 in Order to Eliminate HPCI Pump auto- Transfer on High Suppression Pool Level ML20115A8211996-02-29029 February 1996 Proposed Tech Specs,Removing Rod Block Monitor Requirements from TS by Reducing Number of Rod Movements During Power Maneuvers ML20115A8171996-02-29029 February 1996 Proposed Tech Specs,Relocating Spec 3/4.9.6, Refueling Platform to Document Which Is Controlled Under Requirements of 10CFR50.59 ML17158B1071996-02-12012 February 1996 Proposed Tech Specs to Implement 10CFR50,App J,Option B & Establish New Spec 6.8.5, Primary Containment Leakage Rate Testing Program. ML17158A6821995-04-26026 April 1995 Rev 3 to Nuclear Dept Procedure ON-100-009, Control Room Evacuation. ML17158A6841995-04-13013 April 1995 Rev 3 to Nuclear Dept Procedure ON-200-009, Control Room Evacuation. ML20081L9151995-03-14014 March 1995 Rev 1 to NS-ST-002, Security Training & Crucial Security Task Certification ML17164A5801995-02-10010 February 1995 Proposed Tech Specs for Aot/Sti Extensions ML17164A5891995-01-20020 January 1995 Rev 2 to PP&L SSES Odcm. ML17164A4351994-11-21021 November 1994 Proposed Tech Specs Increasing MSIV Leakage Rate & Deleting MSIV-LCS ML17158A5441994-10-28028 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML20058F8281993-11-24024 November 1993 Proposed Tech Specs Re Power Uprate W/Increased Flow ML17157C3881993-05-31031 May 1993 Rev 8 to ISI-T-100.0, ISI Program Plan for Pump & Valve Operational Testing. ML17157C3901993-05-31031 May 1993 Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing. ML18017A2671993-04-20020 April 1993 Exercise Manual. ML17157C2741993-04-0202 April 1993 Proposed TS 3.4.1.1.2 Re LCO for Recirculation Loops,Single Loop Operation ML18017A2631992-05-0606 May 1992 Emergency Exercise Std for Conduct in Performance of 920219 NRC Graded Exercise ML20113G9881992-02-19019 February 1992 Package Providing Basis for Conduct of Simulated Radiological Accident at Plant ML17157B0101991-12-31031 December 1991 Rev 4 to ISI-T-200.0, Sses,Unit 2,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML17157B0081991-12-31031 December 1991 Rev 7 to ISI-T-100.0, Sses,Unit 1,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML18017A2591991-10-16016 October 1991 Exercise Manual, Approved by Util as Std for Conduct in Performance of 911016 NRC Graded Exercise ML20082P1871991-09-0404 September 1991 Proposed Tech Specs for HPCI Sys Low Pressure Surveillance Test Acceptance Criteria ML17157A3381990-09-30030 September 1990 Cycle 5 Reload Summary Rept. ML17157A3371990-09-24024 September 1990 Proposed Tech Specs in Support of Facility Cycle 5 Reload ML17157A2441990-07-0202 July 1990 Proposed Tech Specs to Support Cycle 6 Reload ML17157A0891990-03-19019 March 1990 Rev 0 to Procedure MT-024-024, Diesel Engine Analysis & Load Balancing. ML17157A0871990-03-19019 March 1990 Rev 0 to Procedure TP-024-087, Data Collection for E Diesel Generator Combustion Intake Air Temp Test. ML20127B4271990-01-19019 January 1990 Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing ML19325D7491989-10-19019 October 1989 Proposed Tech Specs 3.2.2 Eliminating Certain Requirements on One Time Basis for 3 Months ML20082C4101989-08-16016 August 1989 Spec Change Notice 7 to Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1101989-04-14014 April 1989 Proposed Tech Specs,Making Changes to Emergency Svc Water Sys,Per 10CFR50,App R ML17156B0651989-03-31031 March 1989 Rev 6 to ISI-T-100.0, Pump & Valve Inservice Insp Testing Program. ML17156B0671989-03-31031 March 1989 Rev 3 to ISI-T-200.0, Pump & Valve Inservice Insp Testing Program. ML20082C4071989-03-23023 March 1989 Spec Change Notice 6 to Rev 4 to F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1391989-02-22022 February 1989 Rev 12 to EO-100-009, Plant Shutdown from Outside Control Room. ML20082B2771989-01-0404 January 1989 Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3731988-11-0707 November 1988 Spec Change Notice 5 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3711988-11-0101 November 1988 Spec Change Notice 4 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3641988-10-14014 October 1988 Spec Change Notice 3 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156A7291988-08-10010 August 1988 Proposed Tech Specs,Extending Operation During Cycle 4 W/ One Recirculation Loop Out of Svc ML20082B2911988-07-11011 July 1988 Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers 1999-03-12
[Table view] |
Text
_ _ _ . _ __ _ _ __-. ___ _ . . . _ - _ . ~
l l l
." CONTAINMENT SYSTEMS ,
l PfilMARY CONTAINMENT LEAKAGE l LIMITING CONDITION FOR OPERATION .
! 3.6.1.2 Primary containment leakage rates shall be limited to: , l l* a. An overall integrated leakage rete iType A test) in accordance with Specification 6.8.6, Primary Containment Leakage Rate Testmg Program.
l ~
- b. A combined leakage rate in accordance with Specification 6.8.5, Primary j Containment Leakage Rate Testmg Program, for all penettstione and all valves i
listed in Table 3.6.31, except for main steam line leoletion valves', main steam line drain volves' and valves which are hydrostatically leak tested per Table 3.6.31, subject to Type 8 and C tests.
- c.
- Loss than or equal,to 100 sof por hour for any main steam isolation y s I and a combined maximum pathway leakage rate , s gscf per hour for all four mein steam lines throcgh the isolation velves who tesked stP , 22.5 psig, or Pa. .
I li
, d. 'Less than or equal to 1.2 scf per hour for any one j when tested in accordance with Specification 6.8.6, Primary Containment j Leakage Rate Testing Program. -
- e. A combined leakage rate of less than or equal to 3.3 gpm for all containment isolation valves in hydrostatically tested lines which penetrate the primary containment, when tested at 1.10 P,. l
! APPLICABILITY: When PRIMARY CONTAINMENT INTEGRITY is required per Specification i 3.6.1.1.
ACTION, i
With: .
c
- a. The measured overall integrated primary conteinmefit'leskoge rate (Type A test)
{
not in accordance with Specification 6.8.5, Primary Containment Leekage Rate Testing Program, or
- b. The measured combined leakege rate for all penetrations and all valves listed in i
Table 3.6.31, except for main steam line isolation volves', main steam line drain i
valves' and valves which are hydrostatically leak tested per Table 3.6.3-1, j subject to Type 8 and C tests not in accordance with Specification 6.8.5,. Primary '
Containment Leekage Rate Testing Program, or l l
- c.The measured leekoge rate exceeding 100 scf per hout for any one main steam l Iso!ation valve or a total maximum pathway leakege rate of > 300 scf per hour for I all four main steam lines through the isolation volves, or
- d. The measured leek rate exceeding 1.2 scf per hour for any one main steam line
- drain velve, or
' e. The measured combined leakege rate for all containment isolation valves in hydrostatically tested lines which penetrate the primary containment exceeding
. 3.3 gpm,
's Deletion of the MSIV Leakege Control System wes approved in Amendment No.151 and implemented during the U1 gRIO. ,
I l
SUSOUEHANNA - UNIT 1 3/4 6 2 Amendment No. 29, 15/ 158l I
9609300189 960923 - i PDR ADOCK 05000387 '
e PDR
_ _ _ - . . = _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _. _ _ _ _ _ _ _ _ _
i o l l
- l CONTAINastarr sYSTERAs .
l pfmEARY COMTARRAERfr tRAKAGE l
LEAfTING CONDm0N POR OptRATION ,
- 3.6.1.2 Pnmary containment leakage rates sheE be Emited to
- ,
e l
- e. An overed integrated leakage reto (Type A toets in accordance wfth Specification 0.0.5, Primary Containment Leakege Rate Testing Program.
j 1 b. A combined leakage rete in accordanos with Spesincetion 9.8.5, Primary Containment Leekage Rate Teeting Program, for su penetratione and su valves Ested in Table 3.8.3-c .
1, except for main steam Ene leoistion valves *, main steem Ene drein vehme* and
- volves which are hydrostaticaly leak tested per Table 3.6.31, subject to Type B and C tests. l
- c.
- Laos then er aquel to 100 ocf per hour f one stee m '
and a
' corr.bined maximum pathway leakage r of 5 300 ocf per hour for as four ' steem lines through the isolation valves when at 2.5 peig) p ,.- 4, i d. ' Lees then or equel to 1.2 scf por fcr any one main steam Ene drain when tested in accordance with .E.5, Primary Contammes Mate Teetmg Program.
! e. A combined leakage rate of less than or equal to 3.3 gpm for au centainment isoistion
! velves in hydrostatically tested lines which penetrete the primary containment, when tested at 1.10 P.. l l
APPLICABILITY: When PRIMARY CONTAINMENT INTEGRITY is required per Specification 3.6.1.1.
- ACTION:
l l
! winu i
- s. The measured overall integrated pnmary contenment lerAege rate (Type A testi not in i accordance with Specification 6.8.5, Primary contrenment Laakege Bete Testing i Program, or _, ,
- b. The measured combined leakage rate for all penetratione and all velves listed in Table i
. 3.6.31, except for main steam line isolation veives', main steam line drain valves
- and velves which are hydrostatically leek tester.1 per Tab's 3.6.31, subject to Type 5 j and C tests not in accordance with Specifimeon S.8.6, Primary Containment Laakage i Rate Testing Program, or j
- c. The measured leakage rate exceeding 100 scf per hour for any one main otsam
! leolation valve or a total maximum pathway leakage rate of > 300 scf per hour for all i four main steem lines through the leolation valves, er j i
- d. The measured leak rate exceedeg 1.2 sci per hour for any one main steam Ene drein velve, or ;
i s. The measured combined '4akage rate for aI containment isolation velves in I hydrostaticady tested. lines which penetrate the primary containment exceeding 3.3 spm, t
j
- Exemption to Appendix 'J* of 10 CFM 50.
) SUSOUEHANNA - UNIT 2 3/4 6-2 Anendment No. 727, 129 l n.
4 a
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of :
Docket No. 50-388 PENNSYLVANIA POWER & :
LIGHT COMPANY I
REVISION TO PROPOSED AMENDMENT NO.153 FACILITY OPERATING LICENSE NO. NPF-22 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO. 2 Licensee, Pennsylvania Power & Light Company, hereby files revised proposed Amendment No.153 to its Facility Operating License No. NPF-22 dated March 23,1984.
. This amendment contains a revision to the Susquehanna SES Unit 2 Technical Specifications.
- PENNSYLVANIA POWER & LIGHT COMPANY BY
i /
3 R. Gl Byr __
Sr. Vict Presid nt- Nuclear Sworn 1 ed before me thi 996.
b kI- a b]h
.-D..Lli,.
C. a, otary Public ARentown, t.ehigh County My Commission Expres Jan.15,1998 MeTcer,Pennsyhens Amuvh4 Nuldes l
l j