ML20078M653
| ML20078M653 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/20/1983 |
| From: | PENNSYLVANIA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17139B924 | List: |
| References | |
| NUDOCS 8310250258 | |
| Download: ML20078M653 (2) | |
Text
TTAGMW k Tb fLA 19(O TABLE 4.8.1.1.2-2 UNIT 1 AND COMMON DIESEL GENERATOR LOADING TIMERS DEVICE TAG TIME NO.
S_YSTEM LOCATION SETTING K116A CS pp 1A 1C626 10.5 sec K116B CS pp 18 1C627 10.5 sec K125A CS pp 1C 1C626 10.5 sec 1
K125B CS pp 1D 1C627 10.5 sec 62X-201C4 Emerg Switchgear Rm OC877A 60 sec cooler A &
RHR SN pp H&V fan A 62X-20204 Emerg Switchgear Rm OC8778 60 sec cooler B &
RHR SN pp H&V fan B 62X1-20304 Control Structure OC877A 3 min Chillwater System 62X1-20404 Control Structure OC8778 3 min Chillwater System 62X2-20304 Cor. trol Structure OC877A 3.5 min Chillwater System l
62X2-20404 Control Structure OC8778 3.5 min l
Chillwater System 62X3-20304 Control Structure OC877A 60 sec Chi 11 water System 62X3-20404 Control Structure OC8778 60 sec l
Chillwater System l
62X2-20310 Control Structure OC876A 3 min l
Chillwater System 62X 2-20410 Control Structure OC876B 3 min Chillwater System l
62AX2-20108 Emerg SW 1A201 40 sac y
62AX2-20208 Emerg SW 1A202 40 sec 3
l ggo.
62AX2-20303 Emerg SW 1A203 44 f3" sec 62AX2-20403 Emerg SW 1A204 4g y sec 62X-516 OG Rm Exh Fan A 08516 2 min m
62X-626 OG Rm Exn Fan B 08526 2 min oc gQ 62X-536 DG Rm Exh Fan C 08536 2 min Sa:
62X-546 DG Rm Exh Fan 0 08546 2 min 62A-20102 RHR Pump 1A 1A201 3 sec 62A-20202 RHR Pump 18 1A202 3 sec 62A-20302 RHR Pump 1C 1A203 3 sec 62A-20402 RHR Pump 1D 1A204 3 sec SUSQUEHANNA - UNIT 1 3/4 8-8 Amendment No.16
s 4
TABLE 4.8.1.1.2-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 100 Valid Tests
- Test Frequency 11 At least once per 31 days 2
At least once per 14 days 3
At least once per 7 days-
>4 At least once per 3 days
- Criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, Revision 1, August 1977, where the last 100 tests are determined on a per nuclear unit basis.
For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 100 valid tests." Entry into this test schedule shall be made at the 31 day test frequency.
SUSQUEHANNA - UNIT 1 3/4 8-7