ML17139B331

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3.4.3 & 4.4.3 Re RCS Leakage Detection Sys
ML17139B331
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 02/03/1983
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17139B328 List:
References
NUDOCS 8302090332
Download: ML17139B331 (2)


Text

~

+ w

~

~

(

~

g~~e~v Q

REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE

'EAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4. 3. 1 At least the following reactor coolant system leakage detection systems shall be OPERABLE:

a.

One primary containment atmosphere particulate radioactivity monitoring system channel> ali~q~

qo ~~ g<<~iL b.

Two drywell floor drain sump level monitoring system channels, and c.

One primary containment atmosphere gaseous radioactivity monitoring system channels al'~~ ~, ~~ g+~~i APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2 and 3.

ACTION:

With only two of the above required leakage detection systems

OPERABLE, operation may continue for up to 30 days provided grab samples of the contain-ment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gaseous and/or particulate radioactive monitoring system is inoperable; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.4.3.1 The re'actor coolant system leakage detection systems shall be demonstrated OPERABLE by:

a.

Primary containment atmosphere particulate and gaseous monitoring systems-performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a

CHANNEL FUNCTIONAL TEST at least once per 31 days and a

CHANNEL "

CALIBRATION at least once per 18 months.

b.

Drywell floor drain sump level monitoring system-performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.

PDR ADOCK 05000387 P

PDR SUS(UEHANNA - UNIT 1 3/4 4-6 G

O.

i h

Ql

\\

>l y

I II

)l i~ "

l &

g g

y I

5'E IYk r

1 y

f, 1

'L C

p,t S.

P I

Y t *