REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE
'EAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4. 3. 1 At least the following reactor coolant system leakage detection systems shall be OPERABLE:
a.
One primary containment atmosphere particulate radioactivity monitoring system channel> ali~q~
qo ~~ g<<~iL b.
Two drywell floor drain sump level monitoring system channels, and c.
One primary containment atmosphere gaseous radioactivity monitoring system channels al'~~ ~, ~~ g+~~i APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION:
With only two of the above required leakage detection systems
- OPERABLE, operation may continue for up to 30 days provided grab samples of the contain-ment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gaseous and/or particulate radioactive monitoring system is inoperable; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.4.3.1 The re'actor coolant system leakage detection systems shall be demonstrated OPERABLE by:
a.
Primary containment atmosphere particulate and gaseous monitoring systems-performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a
CHANNEL FUNCTIONAL TEST at least once per 31 days and a
CHANNEL "
CALIBRATION at least once per 18 months.
b.
Drywell floor drain sump level monitoring system-performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.