ML20129D785

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re MSIVs Leakage Testing
ML20129D785
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/23/1996
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17158B802 List:
References
NUDOCS 9609300189
Download: ML20129D785 (2)


Text

_ _ _ . _ __ _ _ __-. ___ _ . . . _ - _ . ~

l l l

." CONTAINMENT SYSTEMS ,

l PfilMARY CONTAINMENT LEAKAGE l LIMITING CONDITION FOR OPERATION .

! 3.6.1.2 Primary containment leakage rates shall be limited to: , l l* a. An overall integrated leakage rete iType A test) in accordance with Specification 6.8.6, Primary Containment Leakage Rate Testmg Program.

l ~

b. A combined leakage rate in accordance with Specification 6.8.5, Primary j Containment Leakage Rate Testmg Program, for all penettstione and all valves i

listed in Table 3.6.31, except for main steam line leoletion valves', main steam line drain volves' and valves which are hydrostatically leak tested per Table 3.6.31, subject to Type 8 and C tests.

  1. c.
  • Loss than or equal,to 100 sof por hour for any main steam isolation y s I and a combined maximum pathway leakage rate , s gscf per hour for all four mein steam lines throcgh the isolation velves who tesked stP , 22.5 psig, or Pa. .

I li

, d. 'Less than or equal to 1.2 scf per hour for any one j when tested in accordance with Specification 6.8.6, Primary Containment j Leakage Rate Testing Program. -

e. A combined leakage rate of less than or equal to 3.3 gpm for all containment isolation valves in hydrostatically tested lines which penetrate the primary containment, when tested at 1.10 P,. l

! APPLICABILITY: When PRIMARY CONTAINMENT INTEGRITY is required per Specification i 3.6.1.1.

ACTION, i

With: .

c

a. The measured overall integrated primary conteinmefit'leskoge rate (Type A test)

{

not in accordance with Specification 6.8.5, Primary Containment Leekage Rate Testing Program, or

b. The measured combined leakege rate for all penetrations and all valves listed in i

Table 3.6.31, except for main steam line isolation volves', main steam line drain i

valves' and valves which are hydrostatically leak tested per Table 3.6.3-1, j subject to Type 8 and C tests not in accordance with Specification 6.8.5,. Primary '

Containment Leekage Rate Testing Program, or l l

  1. c.The measured leekoge rate exceeding 100 scf per hout for any one main steam l Iso!ation valve or a total maximum pathway leakege rate of > 300 scf per hour for I all four main steam lines through the isolation volves, or
d. The measured leek rate exceeding 1.2 scf per hour for any one main steam line
drain velve, or

' e. The measured combined leakege rate for all containment isolation valves in hydrostatically tested lines which penetrate the primary containment exceeding

. 3.3 gpm,

's Deletion of the MSIV Leakege Control System wes approved in Amendment No.151 and implemented during the U1 gRIO. ,

I l

SUSOUEHANNA - UNIT 1 3/4 6 2 Amendment No. 29, 15/ 158l I

9609300189 960923 - i PDR ADOCK 05000387 '

e PDR

_ _ _ - . . = _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _. _ _ _ _ _ _ _ _ _

i o l l

  • l CONTAINastarr sYSTERAs .

l pfmEARY COMTARRAERfr tRAKAGE l

LEAfTING CONDm0N POR OptRATION ,

3.6.1.2 Pnmary containment leakage rates sheE be Emited to
,

e l

e. An overed integrated leakage reto (Type A toets in accordance wfth Specification 0.0.5, Primary Containment Leakege Rate Testing Program.

j 1 b. A combined leakage rete in accordanos with Spesincetion 9.8.5, Primary Containment Leekage Rate Teeting Program, for su penetratione and su valves Ested in Table 3.8.3-c .

1, except for main steam Ene leoistion valves *, main steem Ene drein vehme* and

volves which are hydrostaticaly leak tested per Table 3.6.31, subject to Type B and C tests. l
c.
  • Laos then er aquel to 100 ocf per hour f one stee m '

and a

' corr.bined maximum pathway leakage r of 5 300 ocf per hour for as four ' steem lines through the isolation valves when at 2.5 peig) p ,.- 4, i d. ' Lees then or equel to 1.2 scf por fcr any one main steam Ene drain when tested in accordance with .E.5, Primary Contammes Mate Teetmg Program.

! e. A combined leakage rate of less than or equal to 3.3 gpm for au centainment isoistion

! velves in hydrostatically tested lines which penetrete the primary containment, when tested at 1.10 P.. l l

APPLICABILITY: When PRIMARY CONTAINMENT INTEGRITY is required per Specification 3.6.1.1.

ACTION:

l l

! winu i

s. The measured overall integrated pnmary contenment lerAege rate (Type A testi not in i accordance with Specification 6.8.5, Primary contrenment Laakege Bete Testing i Program, or _, ,
b. The measured combined leakage rate for all penetratione and all velves listed in Table i

. 3.6.31, except for main steam line isolation veives', main steam line drain valves

  • and velves which are hydrostatically leek tester.1 per Tab's 3.6.31, subject to Type 5 j and C tests not in accordance with Specifimeon S.8.6, Primary Containment Laakage i Rate Testing Program, or j
c. The measured leakage rate exceeding 100 scf per hour for any one main otsam

! leolation valve or a total maximum pathway leakage rate of > 300 scf per hour for all i four main steem lines through the leolation valves, er j i

d. The measured leak rate exceedeg 1.2 sci per hour for any one main steam Ene drein velve, or  ;

i s. The measured combined '4akage rate for aI containment isolation velves in I hydrostaticady tested. lines which penetrate the primary containment exceeding 3.3 spm, t

j

  • Exemption to Appendix 'J* of 10 CFM 50.

) SUSOUEHANNA - UNIT 2 3/4 6-2 Anendment No. 727, 129 l n.

4 a

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of  :

Docket No. 50-388 PENNSYLVANIA POWER &  :

LIGHT COMPANY I

REVISION TO PROPOSED AMENDMENT NO.153 FACILITY OPERATING LICENSE NO. NPF-22 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO. 2 Licensee, Pennsylvania Power & Light Company, hereby files revised proposed Amendment No.153 to its Facility Operating License No. NPF-22 dated March 23,1984.

. This amendment contains a revision to the Susquehanna SES Unit 2 Technical Specifications.

PENNSYLVANIA POWER & LIGHT COMPANY BY

i /

3 R. Gl Byr __

Sr. Vict Presid nt- Nuclear Sworn 1 ed before me thi 996.

b kI- a b]h

.-D..Lli,.

C. a, otary Public ARentown, t.ehigh County My Commission Expres Jan.15,1998 MeTcer,Pennsyhens Amuvh4 Nuldes l

l j