Response to ASLB 850503 Order to Provide Current Const Status Rept,Consisting of Const Completion Table & Estimate for Resolution of Remaining Issues.Certificate of Svc Encl
ML20129H798
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/04/1985
From: Dignan T, Gad R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, ROPES & GRAY
To:
References
CON-#285-328 OL, NUDOCS 8506070662
Download: ML20129H798 (6)


Text

35)kk

.s Filed: Juna 4, 1985

-y UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00 KETED 0 Np before the ATOMIC SAFETY AND LICENSING BOA CFFICE 00CKEllNG OF SECRETie'.

& SEFVICf BRANCH

)

In the Matter of )

)

PUBLIC SERVICE COMPANY OF ) Docket Nos. 50-443-OL NEW HAMPSHIRE et al. ) 50-444-OL

)

(Seabrook Station, )

Units 1 and 2) )

)

APPLICANTS' RESPONSE TO

.'vARD ORDER OF May 3, 1985 By its order dated May 3, 1985 and served May 6, 1985 (the Order) this Board ordered Applicants to give a current construction status report. In response to this order the' Applicants provide the following information as to the status of construction on May 31, 1985:

8506070662 850604

  • # O o -

S

9 Unit No. 1 Current estimated construction complete is 86%. With respect to various parts of the project:

Activity  % Complete Mobilize and Prepare Site 100 Place Structural Concrete 98 Install Reactor Pressure Vessel 100 Install-Large Bore Process Pipe 96 Install Large Bore Pipe Hangers, Restraints and Snubbers 86 Install Small Bore Pipe- 82 Install Cable Trays 98 Install Exposed Metal Conduit 96 Install Power, Control, Instrumentation and Security Cable .

87 Install Electrical Terminations 80 Conduct Cold Hydro Test 100 Conduct Hot Functional Test O Conduct Preop and Acceptance Tests Necessary for Fuel Load 15 Unit No. 2 Current estimated construction complete is 25%. With respect to various parts of the project:

Activity  % Complete Mobilize and Prepare Site 100 Place Structural Concrete 69 Install Reactor Pressure Vessel 100 Install Large Bore Process Pipe 4 Install Large Bore Pipe Hangers, Restraints and Snubbers 3 Install Small Bore Pipe O Install Cable Trays O Install Exposed Metal Conduit O Install Power, Control, Instrumentation and Security Cable O Install Electrical Terminations O Conduct Cold Hydro Test O Conduct Hot Functional Test O Conduct Preop and Acceptance Tests Necessary for Fuel Load 0 7.

In the Order the Board also ordered that the Applicants prepare-an " estimate for resolution of the remaining issues." All contentions other than those which may arise out of offsite emergency planning matters have now either been withdrawn, resolved by summary

-disposition, or are sub judice this Board, save one.

That one issue is the so-called DCRDR issue which is raised by Contention No. 10 of the New Hampshire Attorney General. The Applicants continue to believe that this contention will be resolved without the need for evidentiary hearings.

Contentions with respect to state and municipal emergency plans presumably will be in order for filing as soon as the plans are submitted by the Governors of Massachusetts and New Hampshire to FEMA. The best estimate we have at this time is that these submissions will occur in the Fall of 1985. On May 23, 1983 this Board issued a tentative hearing schedule for resolution of offsite energy planning issues. This schedule, if adhered to contemplates the commencement of hearings six months after the filing of the emergency plans. We believe that scheaule could be shortened by one month by reducing the time allowed for statutory contentions and discovery each by 50%. Given the wide exposure the plans 4

7 will have prior to filing it would seem that such reductions in time would be appropriate.

In addition there will have to be a resoltion of the contentions which arise, if any, out of the emergency exercise conducted for Seabrook as required by 10 CFR 50 App. E in light of the decision in UCS v. NRC __ F.2d __,

2 CCH Nuclear Reg. Rptr. 1 20,303 (D.C. Cir. 1984). That decision makes clear that the Commission has wide latitude to structure proceedings required thereby to assure resolution of contentions in an expeditious manner. The Seabrook exercise is currently scheduled for February of 1986. Allowing five months for resolution of any contentions made as a result of this exercise would result in completion of the Seabrook Operating License proceedings before this Board in or about July of 1986.

Respec_tful subm'tted,

/0/ '

/

/s/ B C +

Thomas G. Dignan, Jr.

R. K. Gad III Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 Telephone: 423-6100 Dated: June 4, 1985

=,.

O CERTIFICATE OF SERVICE ,

i 4:

.I, Thomas G. Dignan, Jr.,.one of'the attorneys'for the Applicants herein, hereby certify that on June 4,

. 1985, I made service of the within Applicants' Respog bETED

, - to Board Order of May 5, 1985 by mailing copies therechNRC.

postage. prepaid, to:

- Helen Hoyt, Chairperson Ms. Diana P. RanddW - JM -7 ; N0 :11

-Atomic Safety'and Licensing

70. Collins Street ->

Board Panel Seabrook, NH 03874 U.S. Nuclear Regulatory 0FFICE OF SECRtTAE Commission .

00CKEigyERVICf.

Washington', DC 20555

, . Dr. Emmeth A. Luebke William S. Jordan, III, Esquire

~ Atomic Safety'and Licensing Harmon, Weiss & Jordan

. Board Panel 20001 S Street, N.W.

U.S. Nuclear Regulatory Suite 430 Commission Washington, D.C. 20009 Washington, DC 20555 Dr. Jerry Harbour G. . Dana Bisbee, Esquire Atomic. Safety and Licensing Assistant Attorney General-Board Panel Office of-the Attorney General U.S. Nuclear Regulatory 208 State'HouseLAnnex Commission Concord, NH 03301-Washington, DC 20555

- Atomic. Safety and Licensing Robert G. Perlis,: Esquire '

i Board Panel Office of the Executive Legal U.S. Nuclear Regulatory Director. .

Commission .

U.S. Nuclear Regulatory Washington, DC 20555 Commission

' Washington, DC 20555 Atomic l Safety and Licensing Robert A. Backus, Esquire

. ~ Appeal Board Panel 116 Lowell Street

.U.S. Nuclear Regulatory P.O. Box 516

Commission Manchester, NH-03105 Washington, DC 20555 Philip Ahrens, Esquire Anne Verge,' Chairperson

. Assistant Attorney General Board of Selectmen

  • Department of the Attorney Town Hall
General- South Hampton, NH 03827 Augusta, ME 04333

~

i-

. , -n.., . _ . , - . - _ . , , - . _ . . _ . . . . _ _ . - _ - _ . . . _ _ . . . _ _ . . _ _ _ _ . . - - - _ _ _ _

e i

Charles Cross, Esquire JoAnn Shotwell, Esquire Shaines, Madrigan & McEachern Assistant Attorney General 25 Maplewood Avenue Department of the Attorney General P. O. Box 366 One Ashburton Place, 19th Floor Portsmouth, NH 03842 Boston, MA 02108 Ms. Roberta C. Pevear Mr. Patrick J. McKeon the Town of Hampton Falls Selectmen's Office-Drinkwater Road 10 Central Road  !

Hampton Falls, NH 03844 Rye, NH 03870 Mrs. Sandra Gavutis Mr. Calvin A. Canney the Town of Kensington City Manager RED'1- City Hall East Kingston, NH 03827 126 Daniel Street Portsmouth, NH 03801 Senator Gordon J. Humphrey Mr. Angie Machiros U.S. Senate Chairman of the Washington, DC 20510 Board of Selectmen (Attn: Tom Burack) Town of Newbury Newbury, MA 01950 Senator Gordon J. Humphrey Mr. Richard E. Sullivan 1 Pillsbury Street Mayor

-Concord, NH 03301 City Hall (Attn: Herb Boynton) Newburyport, MA 01950 Mr. Donald E. Chick Town Manager's office Town Manager Town Hall Town of Exeter Friend Street 10 Front Street Amesbury, MA 01913 Exeter, NH 03833 Brian P. Cassidy, Esquire Brentwood Board of Selectmen-Regional Counsel RFD Dalton Road Federal Emergency Management Brentwood, NH 03833 Agency - Region I 442 POCH Boston, MA 02109 Gary W. Holmes, Esquire Holmes & Ells 47-Winnacunnet Road Hampton, NH 03841 l3fThomas971U2d G. D.fgnan, JM.

/