MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20199L2071997-11-24024 November 1997 Trip Rept of 971006 Visit to Perry Site to Gather Info on New & Unique Strainer Design Installed at Perry During Most Recent Outage ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20204A1371986-05-0505 May 1986 Summary of 860418 Meetings W/Usgs & Util Re Progress on Geology/Seismology Confirmatory Issues for Plants.Attendance List Encl 1999-08-04
[Table view] |
Text
. .
.p ur. '
, UNITED STATES
- g NUCLEAR REGULATORY COMMISSION g, j WASHINGTON, D. C. 20555
.....* FEB 2 51986 Docket No.: 50-440 50-441 l
1 MEPORANDUM FOR: Walter R. Butler, Director Project Directorate No. 4 ;
Division of BWR Licensing FROM: John J. Stefano, Project Manager l Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
SUMMARY
RE?0RT OF THE EARTHQUAKE MEETING AT THE PERRY PLANT SITE ON FEBRUARY 11, 1986 -
The meeting was held to discuss CEI's preliminary findings from its
' assessment of the impact of the January 31, 1986 earthquake on the as-built Perry plant design, and to discuss the operational readines.5 of Perry Unit 1 i
for licensing. This report briefly summarizes discussions held in the morning of February 11, 1986, which were limited solely to the earthquake event and its aftermath. The NRC regional staff will report separately on discussions held in the afternoon of February 11, 1986, relative to the Perry Unit I readiness for licensing.
Enclosure (1) lists the NRC, USGS and principal CEI representatives who par-ticipated in the meeting. Other CEI personnel and members from the press, U.S.
Congressional staff, the intervenors and other interested parties were also in attendance, but are not listed in Enclosure (1). Enclosure (2) contains the meeting notice (issued by the NRC Region III Office) and the slide presentation handout prepared by CEI and distributed to the meeting attendees.
In summary, CEI presented its independent investigative findings of plant status prior to, during, and after the earthquake event, including a listing of the safety and non-safety systems that were undergoing operational readiness tests when the event occurred; characterized the earthquake event and its geographical location relative to the plant site; described the geologic structure upon which the plant was built; and discussed the analytical results obtained from the seismic data recorded by instruments positioned at various
' locations within the Perry plant buildings. On the basis of CEI's analysis _i of the data recorded, CEI and its consultants have concluded that: (1)the tectonic province considered in defining soil-structure interactions for the l Perry site-specific safe shutdown earthquake (SSE) intensity remains valid a as described in the FSAR and as evaluated by the NRC staff in the Perry SER; and (2) that the exceedance of SSE limits recorded at the higher frequencies (greater than 16 Hz) was of such a short duration (less than 1 second), low velocity and small displacement as to not have imparted any significant energy to the plant structure and the components, systems, and equipment installed therein; although a spore detailed assessment of the impact, if any, on the qualification of safety-related equipment in the plant has not yet been fully G603060118 860225 PDR A
ADOCK 05000440 PDR '
k __ __ _ _ __.-- _ -~
I completed. In view of these conclusions, CEI maintained that the SSE design basis for the Perry plant remains valid. These conclusions appear to be borne out by the fact that little or no damage had been observed during an intense ,
walkdown of the plant conducted by the CEI staff. l The NRC staff advised CEI that it still needed to conduct its own independent i evaluation of the earthquake and that this effort would consider CEI's findings ;
(a detailed report was filed by CEI with the Commission on February 12,1986). '
The NRC staff also informed CEI that the issue would be discussed with the ACRS, and that meetings with the ACRS Subcommittee and the ACRS Full Consnittee were scheduled for February 12 and 13,1986, respectively. (NRC and CEI briefed the ACRS on those dates). Lastly, the NRC staff advised CEI that its independent
' evaluation would not be completed before March 1,1986, and that completion of its evaluation by that date assumed receipt of all outstanding data promised by CEI before February 17, 1986.
The morning session of the February 11, 1986 meeting was completed at 11:30 am after which time the NRC staff answered questions posed by the press and public representatives in attendance. The NRC staff also met with its respective CEI technical counterparts to go over in more detail the information presented by CEI during the formal meeting.
W /m hn J. no, S 4r)r ect Manager WR Pro .ct Director ate N . 4 Division io- BWR Lic nsing
Enclosure:
As stated ,
cc w/ enclosure: See next page l
E comple ted. In view of these conclusions, CEI maintained that the SSE design basis for the Perry plant remains valid. These conclusions appear to be borne out by the fact that little or no damage had been observed during an intense walkdown of the plant conducted by the CEI staff.
The NRC staff advised CEI that it still needed to conduct its own independent evaluation of the earthquake and that this effort would consider CEI's findings (a detailed report was filed by CEI with the Commission on February 12,1986).
The NRC staff also informed CEI that the issue would be discussed with the ACRS, and that meetings with the ACRS Subcommittee and the ACRS Full Committee were scheduled for February 12 and 13, 1986, respectively. (NRC and CEI briefed the ACRS oa those dates). Lastly, the NRC staff advised CEI that its independent evaluation would not be completed before March 1,1986, and that completion of its evaluation by that date assumed receipt of all outstanding data promised by CEI before February 17, 1986.
The morning session of the February 11, 1986 meeting was completed at 11:30 am after which time the NRC staff answered questions posed by the press and public representatives in attendance. The NRC staff also met with its respective CEI technical counterparts to go over in more detail the infomation presented by CEI during the formal meeting.
John J. Stefano, Senior Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc w/ enclosure: See next page l
DISTRIBUTION See Attached l
PD#4 i Stefano
/yl/86 W---
l completed. In view of these conclusions, CEI maintained that the SSE design basis for the Perry plant remains valid. These conclusions appear to be borne out by the fact that little or no damage had been observed during an intense walkdown of the plant conducted by the CEI staff.
The NRC staff advised CEI that it still needed to conduct its own independent evaluation of the earthquake and that this effort would consider CEI's findings (a detailed report was filed by CEI with the Commission on February 12,1986).
The NRC staff also informed CEI that the issue would be discussed with the ACRS, and that meetings with the ACRS Subcommittee and the ACRS Full Committee were scheduled for February 12 and 13, 1986, respectively. (NRC and CEI briefed the ACRS on those dates). Lastly, the NRC staff advised CEI that its independent evaluation would not be completed before March 1,1986, and that completion of its evaluation by that date assumed receipt of all outstanding data promised by CEI before February 17, 1986.
The morning session of the February 11, 1986 meeting was completed at 11:30 am after which time the NRC staff answered questions posed by the press and public representatives in attendance. The NRC staff also met with its respective CEI technical counterparts to go over in more detail the information presented by CEI during the formal meeting.
John J. Stefano, Senior Project Manager l BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc w/ enclosure: See next page DISTRIBUTION See Attached l
i 4
Stefano
/yl/86
i DISTRIBUTION '
Docket File !
NRC PDR Local PDR PRC System NSIC 4 PD#4 Reading CWoodhead WButler JStefano MRushbrook HDenton/DEisenhut RBernero/RHouston
. Glainas RHermann Alee PSobel FCongel HPolk LReiter DGuzy JRidhardson JKeepler, RIII C. Paperiello, RIII -
RKnop, RIII SStern i
)
1 4
i l
4 I
i l
1 f
o I
l l
t a Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company cc:
Jay Silberg, Esq. Mr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W. Illuminating Company Washington, D. C. 20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Commission Parmly at Center Road Perry, Ohio 44081 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt DCRE Interim Representative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.
618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal. Esq.
Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047
Enclosure 1 CEI/NRC MEETING AT PERRY SITE FEBRUARY 11, 1986 (MORNING SESSION ONLY)
EARTHQUAKE EVENT CEI NRC M. R. Edelman R. M. Bernero, NRR/ DBL A. Kaplan J. G. Keppler, RIII E. Buzzelli C. J. Paperiello, RIII F. Stead R. C. Knop, RIII M. Lister J. A. Grobe, RIII R. Stratman J. J. Stefano, NRR/ DBL Others . W. R. Butler, NRR/ DBL R. Hernon, NRR/ DBL H. Polk, NRR/ DBL J. Johnson,Consulant(SMA)
J. Singh, Consultant (EG&G)
D. Guzy, RES G. Cumming, Consultant j Gilbert Associates .
C. Chen i
R. Ailey CEI Consultants USGS R. Holt L. Langer ,