ML20148D929

From kanterella
Revision as of 00:40, 24 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Listed EPIP & RERP Changes for Plant.Epip FC-EPF-21 Revised to Change Map Indicating Replacement of Lagoon W/ Parking Lot & Also to Indicate Placement of 161kV & 345kV Towers
ML20148D929
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/22/1997
From: Gambhir S
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148D935 List:
References
LIC-97-0090, LIC-97-90, NUDOCS 9706020198
Download: ML20148D929 (2)


Text

'- *

%Empn OEP7blicPowerDE 444 South 16th Street Mall Omaha NE 68102-2247 May 22, 1997 LIC-97-0090 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555

Reference:

Docket Nc. 50-285

SUBJECT:

Transmittal of Changes to Fort Calhoun Station Emergency Plan Implementing Procedures (EPIP) and Radiological Emergency Response Plan (RERP)

In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)(5)(iii), please find the following EPIP and RERP changes enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Administrator (holoer of copies 154, 155 and 156).

Please return the attached receipt confirmation forms using the enclosed pre-addressed envelopes by July 13, 1997.

REMOVE SECTION INSERT Si.CIl0B FC-EPF Forms Index, issued 10/1/96 FC-EPF Foras Index, issued 5/15/97 FC-EPF-21 R1, issued 12/2/94 FC-EPF-21 R2, issued 5/15/97

, RERP Section J. Pg. 25/26. R15. RERP Section J. Pg. 25/26, R15, issued 4/22/97 issued 4/22/97 Summary of Chanaes EPIP FC-EPF-21 was revised to change a map indicating replacement of a lagoon with a parking lot. The map was also revised to indicate the placement of 161kV and 345kV towers.

RERP Section J Page 25/26 was reissued to provide information that was inadvertently omitted from Page 25 during its original issue.

g(

\

\

9706020198 970522 PDR ADOCK 05000285 l!,!

45.5124 Employment with EqualOpportunity j

V. S. Nuclear Regulatory Commission LIC-97-0090 Page 2 Please contact me if you have any questions regarding the enclosed changes.

Sincerely.

1

,f W S. . Gambhir Division Manager Engineering & Operations Support SKG/mah Enclosures I

c: Winston & Strawn (w/o Enclosures)

E. W. Merschoff. NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager (w/o Enclosures)

W. C. Walker. NRC Senior Resident Inspector (w/o Enclosures) l l

l 4

4

<v-wv,--