Application for Amends to Licenses DPR-77 & DPR-79,revising Allowed Enrichment of Fuel in TS Section 5.6.1.2 for New Fuel Pit Storage Racks from 4.5 to 5.0 Weight % U-235
ML20136J025
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/13/1997
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20136J029 List:
References
TVA-SQN-TS-97, TVA-SQN-TS-97-0, NUDOCS 9703190396
Download: ML20136J025 (4)


Text

- _

t $

Temessee Valley Authortty, Post Office Box 2000, Soddy-Daisy. Tennessee 37379-2000 March 13,1997 TVA-SON-TS-97-01 10 CFR 50.90 l U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON)- TECHNICAL SPECIFICATION (TS)

CHANGE 97-01, " REVISION OF FUEL ENRICHMENT FOR THE NEW FUEL PIT STORAGE RACKS" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change revises the allowed enrichment of fuelin TS Section 5.6.1.2 for the new fuel pit storage racks from 4.5 to 5.0 weight percent U-235. This change also requires specific loading patterns in the storage racks to maintain acceptable reactivity requirements as indicated on proposed Figure 5.6-4.

The proposed TS change is identified in Enclosure 1. The justification for the  !

/

proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. Enclosure 4 provides the revised TS pages as illustrated in Enclosure 1, Enclosure 5 provides the Westinghouse Electric Corporation analysis for the SON [)[3f fresh fuel rack criticality. l TVA requests NRC review anc approval of the proposed TS change by July 1997 to support receipt of new fuel for the Unit 2 Cycle 8 refueling outage. Fuel receipt without the revised provisions in this request would require the use of the spent fuel I storage pit. This option could result in the processing of thousands of gallons of water, additional resources for storing the fuel, and additional manipulation of plant l

equipment.

t 9703190396 970313  ?

!' PDR ADOCK 05000327 P PDR ,

M.E .

~~

L J

. . _- - . - - - . . . - ~ - . _ - _

s  :

4 U.S. Nuclear Regula^ ry Commission Page 2 March 13,1997 Please direct questions concerning this issue to Keith Weller at (423) 843-7527.

Sincerely, R. H. Shell Manager SON Site Licensing i:

Sworn to and subscribed before me this/34 day of W)aml> 1996 ,

bsad>> $. n]

4 Notary Public /#

My Commission Expires J>f. 4/.199P Enclosures cc: See page 3 4

s

.d

, l C

U.S. Nuclear Regulatory Commission Page 3 March 13,1997 (Enclosures):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 I

ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE SEQUOYAH NUCLEAR PLANT (SON) UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 i 1

(TVA-SON-TS-97-01)

LIST OF AFFECTED PAGES Unit 1 5-Sa i

Unit 2 1

5-Sa  ;

i I

!