Category:INSPECTION REPORT
MONTHYEARIR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment ML20198Q9091998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support ML20199D4621997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 ML20199D4881997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation ML20136B4471997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls ML20129F4701996-10-23023 October 1996 Insp Rept 50/213-96-07 on 960813-16.No Violations Noted. Major Areas Inspected:Licensee Performance During Biennial Emergency Preparedness Exercise,Emergency Facility Staffing, Procedure Emplementation & Effectiveness of Mitigation IR 05000213/19940011994-01-24024 January 1994 Insp Rept 50-213/94-01 on 940110-14.No Violations Noted. Major Areas Inspected:Projected Dose Calculation Capability from Radioactive Liquid & Gaseous Effluent Releases IR 05000213/19930211993-12-30030 December 1993 Insp Rept 50-213/93-21 on 931107-1211.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930231993-12-17017 December 1993 Insp Repts 50-213/93-23,50-245/93-30,50-336/93-25 & 50-423/93-27 on Stated Date.Violation Noted.Major Areas Inspected:Ffd Program,Policies & Procedures,Ffd Organization & Mgt Control,Training,Chemical Testing & FFD Audit IR 05000213/19930191993-11-23023 November 1993 Insp Rept 50-213/93-19 on 931003-1106.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930161993-11-0404 November 1993 Insp Rept 50-213/93-16 on 930829-1002.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930181993-10-0707 October 1993 Insp Rept 50-213/93-18 on 930927-30.No Safety Concerns or Violations Noted.Major Areas Inspected:Remp,Including Mgt Controls,Qa Audits,Meteorological Monitoring Program & QC Program for Analytical Measurements IR 05000213/19930151993-10-0101 October 1993 Insp Rept 50-213/93-15 on Stated Dates.No Violations Noted.Major Areas Inspected:Generic Ltr 89-10 Program & Related Activities ML20057E6661993-09-29029 September 1993 Insp Rept 50-213/93-16 on 930725-0828.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Technical Support,Plant Support Activities,Outage Assessment & Emergency Planning Drill IR 05000213/19930121993-08-18018 August 1993 Safety Insp Rept 50-213/93-12 on 930620-0724.Violations Noted.Major Areas Inspected:Plant Operations,Outage Activities,Event Response,Maint,Engineering & Technical Support & Plant Support Activities IR 05000213/19920231993-02-0101 February 1993 Insp Rept 50-213/92-23 on 921214-18.Violations Noted.Major Areas Inspected:Ep Program Changes,Emergency Facilities, Equipment,Instrumentation & Supplies,Ep Organization & Management Control,Training & Independent Reviews/Audits IR 05000213/19920221993-01-21021 January 1993 Insp Rept 50-213/92-22 on 921116-20.Violations Noted.Major Areas Inspected:Corrective Actions of Previously Identified Insp Items IR 05000213/19920211993-01-15015 January 1993 Insp Rept 50-213/92-21 on 921115-1212.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Lers & Periodic Repts & Manual Operator Actions During Postulated Station Blackout IR 05000213/19920811993-01-0808 January 1993 Insp Rept 50-213/92-81 on 921005-09 & 29,1112,1210 & 930105 in Region I Ofc.Major Areas Inspected:Licensee Generic Ltr 89-10 Program,Including Scope & Administration of Program, Design Basis Reviews & MOV Training IR 05000213/19920241992-12-30030 December 1992 Insp Rept 50-213/92-24 on 921130-1204.No Violations Noted. Major Areas Inspected:Function of Engineering & Technical Support Reviewed to Evaluate Staffing of Engineering Dept IR 05000213/19920251992-12-22022 December 1992 Insp Rept 50-213/92-25 on 921214-17.No Violations Noted. Major Areas Inspected:Mgt Organization,Training & Assurance of Quality IR 05000213/19920201992-12-15015 December 1992 Insp Rept 50-213/92-20 on 921005-1114.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Licensee self-assessment & Periodic Repts IR 05000213/19900831990-11-0505 November 1990 Insp Repts 50-213/90-83,50-245/90-82,50-336/90-82 & 50-423/90-83 on 900924-28.No Violations Noted.Major Areas Inspected:Licensee Timeliness for Reporting/Operability Determinations IR 05000213/19900821990-10-23023 October 1990 Insp Repts 50-213/90-82,50-245/90-81,50-336/90-81 & 50-423/90-82,on 901001-12.No Violations Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Activities During Unit 1 Refueling Outage IR 05000213/19900131990-10-19019 October 1990 Safety Insp Rept 50-213/90-13 on 900801-0911.Good Radiological Controls Performance Noted.Major Areas Inspected:Plant Startup Following 1989/1990 Refueling Outage,Reactor Trips on 900813 & 0903 & Safeguards Problems IR 05000213/19900181990-10-10010 October 1990 Insp Rept 50-213/90-18 on 900926.No Violations Noted 1999-08-20
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment ML20198Q9091998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support ML20199D4621997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 ML20199D4881997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation ML20136B4471997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls ML20129F4701996-10-23023 October 1996 Insp Rept 50/213-96-07 on 960813-16.No Violations Noted. Major Areas Inspected:Licensee Performance During Biennial Emergency Preparedness Exercise,Emergency Facility Staffing, Procedure Emplementation & Effectiveness of Mitigation IR 05000213/19940011994-01-24024 January 1994 Insp Rept 50-213/94-01 on 940110-14.No Violations Noted. Major Areas Inspected:Projected Dose Calculation Capability from Radioactive Liquid & Gaseous Effluent Releases IR 05000213/19930211993-12-30030 December 1993 Insp Rept 50-213/93-21 on 931107-1211.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930231993-12-17017 December 1993 Insp Repts 50-213/93-23,50-245/93-30,50-336/93-25 & 50-423/93-27 on Stated Date.Violation Noted.Major Areas Inspected:Ffd Program,Policies & Procedures,Ffd Organization & Mgt Control,Training,Chemical Testing & FFD Audit IR 05000213/19930191993-11-23023 November 1993 Insp Rept 50-213/93-19 on 931003-1106.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930161993-11-0404 November 1993 Insp Rept 50-213/93-16 on 930829-1002.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930181993-10-0707 October 1993 Insp Rept 50-213/93-18 on 930927-30.No Safety Concerns or Violations Noted.Major Areas Inspected:Remp,Including Mgt Controls,Qa Audits,Meteorological Monitoring Program & QC Program for Analytical Measurements IR 05000213/19930151993-10-0101 October 1993 Insp Rept 50-213/93-15 on Stated Dates.No Violations Noted.Major Areas Inspected:Generic Ltr 89-10 Program & Related Activities ML20057E6661993-09-29029 September 1993 Insp Rept 50-213/93-16 on 930725-0828.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Technical Support,Plant Support Activities,Outage Assessment & Emergency Planning Drill IR 05000213/19930121993-08-18018 August 1993 Safety Insp Rept 50-213/93-12 on 930620-0724.Violations Noted.Major Areas Inspected:Plant Operations,Outage Activities,Event Response,Maint,Engineering & Technical Support & Plant Support Activities IR 05000213/19920231993-02-0101 February 1993 Insp Rept 50-213/92-23 on 921214-18.Violations Noted.Major Areas Inspected:Ep Program Changes,Emergency Facilities, Equipment,Instrumentation & Supplies,Ep Organization & Management Control,Training & Independent Reviews/Audits IR 05000213/19920221993-01-21021 January 1993 Insp Rept 50-213/92-22 on 921116-20.Violations Noted.Major Areas Inspected:Corrective Actions of Previously Identified Insp Items IR 05000213/19920211993-01-15015 January 1993 Insp Rept 50-213/92-21 on 921115-1212.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Lers & Periodic Repts & Manual Operator Actions During Postulated Station Blackout IR 05000213/19920811993-01-0808 January 1993 Insp Rept 50-213/92-81 on 921005-09 & 29,1112,1210 & 930105 in Region I Ofc.Major Areas Inspected:Licensee Generic Ltr 89-10 Program,Including Scope & Administration of Program, Design Basis Reviews & MOV Training IR 05000213/19920241992-12-30030 December 1992 Insp Rept 50-213/92-24 on 921130-1204.No Violations Noted. Major Areas Inspected:Function of Engineering & Technical Support Reviewed to Evaluate Staffing of Engineering Dept IR 05000213/19920251992-12-22022 December 1992 Insp Rept 50-213/92-25 on 921214-17.No Violations Noted. Major Areas Inspected:Mgt Organization,Training & Assurance of Quality IR 05000213/19920201992-12-15015 December 1992 Insp Rept 50-213/92-20 on 921005-1114.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Licensee self-assessment & Periodic Repts IR 05000213/19900831990-11-0505 November 1990 Insp Repts 50-213/90-83,50-245/90-82,50-336/90-82 & 50-423/90-83 on 900924-28.No Violations Noted.Major Areas Inspected:Licensee Timeliness for Reporting/Operability Determinations IR 05000213/19900821990-10-23023 October 1990 Insp Repts 50-213/90-82,50-245/90-81,50-336/90-81 & 50-423/90-82,on 901001-12.No Violations Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Activities During Unit 1 Refueling Outage IR 05000213/19900131990-10-19019 October 1990 Safety Insp Rept 50-213/90-13 on 900801-0911.Good Radiological Controls Performance Noted.Major Areas Inspected:Plant Startup Following 1989/1990 Refueling Outage,Reactor Trips on 900813 & 0903 & Safeguards Problems IR 05000213/19900181990-10-10010 October 1990 Insp Rept 50-213/90-18 on 900926.No Violations Noted 1999-08-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999 PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility ML20206R7391999-05-12012 May 1999 Notice of Violation from Investigation on 970616-0718. Violations Noted:On 961209 & 10,J Foley Deliberately Caused Util to Be in Violation of 10CFR50.9 & TS 6.11 & in June 1997 Provided Inaccurate Info to NRC Inspector ML20206R7141999-05-12012 May 1999 Notice of Violation from Investigation on 970314-0722. Violation Noted:M Thomas Engaged in Deliberate Misconduct on 970227,that But for Detection,Would Have Caused Licensee to Be in Violation of 10CFR20.1802 ML20205J8031999-04-0505 April 1999 Notice of Violation from Insp on 961102-27.Violation Noted:Licensee Failed to Adequately Instruct Workers & Failed to Perform Adequate Radiological Surveys in Reactor Cavity & Fuel Transfer Cavity ML20206B3801999-03-29029 March 1999 EN-99-015:informs Commission That Staff Intends to Exercise Discretion Pursuant to Section VII.B.6 of Enforcement Policy & Not Propose Civil Penalty for Severity Level III Problem That Occurred in Nov 1996,prior to Licensee Decision IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected ML20207B7041999-02-26026 February 1999 Notice of Violation from Insp on 981103-990118.Violations Noted:Two Different Locked High Radiation Area Doors in Containment Builiding Found Unlocked & Unattended IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls ML20237D4071998-08-21021 August 1998 Notice of Violations from Insp on 980414-0803 & 13. Violations Noted:Licensee Failed to Declare Unusual Event Re 980620 Release of About 800 Gallons of Water Containing Approx 2200 Uci Radioactivity from a Waste Test Tank PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee1998-07-28028 July 1998 PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support ML20203E6771998-02-17017 February 1998 Notice of Violation from Insp on 971012-980112.Violation Noted:Licensee Did Not Provide for Verifying or Checking Adequacy of Design for Listed Sys & Components IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment ML20198Q9091998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites1997-12-11011 December 1997 PNO-I-97-073A:on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations1997-12-0404 December 1997 PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 9711301997-12-0101 December 1997 PNO-I-97-073:survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support ML20199D4881997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20199D4621997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 ML20198N2761997-10-29029 October 1997 Notice of Violation from Insp on 970703,0811-0919.Violation Noted:On 950222,individual Working on Radiation Work Permit (RWP) 1950603,received Facial Contamination & Not Sent to Be whole-body-counted ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20217J3981997-10-0909 October 1997 Notice of Violation from Insp on 970408-0805.Violations Noted:From 960814-970311,licensee Did Not Assure That Significant Condition Adverse to Quality Was Promptly Corrected ML20199B5731997-10-0202 October 1997 EN-97-095:on 971009,staff Intends to Issue Notice of Violation for Two Severity Level III Violations of App B, Criterion Xvi, Corrective Actions. Violations Involved Discovery of Old Plant Design Discrepancy in SWS IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area ML20210P0101997-08-12012 August 1997 Notice of Violation from Insp on 970616-0718.Violation noted:post-dive Diver Tritium Bioassay Sample for 961108 Dive Was Not Shipped as Expeditiously as Possible for Analysis & No Preservative Was Added IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated1997-08-0808 August 1997 PNO-I-97-049:on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20140G4491997-05-12012 May 1997 EN-97-035:on 970512,notice of Proposed Imposition of Civil Penalty in Amount of $650,000 Issued to Licensee.Action Based on Three Severity Level II Problems Consisting of Multiple Individual Violations ML20141D2621997-05-12012 May 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $650,000.Violation Noted:Licensee Did Not Assure That Applicable Regulatory Requirements & Design Basis Were Correctly Translated Into Specifications ML20141F8181997-05-0808 May 1997 Notice of Violation from Insp on 970106-0407.Violation Noted:No RCS Chemistry Samples Were Taken from 961115-970206 ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl1997-02-28028 February 1997 PNO-I-97-014:on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl ML20136B4471997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20138J6721997-02-0404 February 1997 Notice of Violation from Insp on 961116-970105.Violation Noted:On 961127,during Preparations to Test EG2B After Jacking Engine,Operator Failed to Remove Crank Over Tool Per Step 6.2.10 Prior to Running Diesel for One Hour Test ML20133A4911996-12-24024 December 1996 Notice of Violation from Insp on 960921-1115.Violation Noted:On 960924,B Residual Heat Removal Pump Failed Due to Inherent Manufacturing Defects & Marginal Design Tolerance ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 1999-09-01
[Table view] |
Text
. - . . . - . - . _ . - - . . . - ~ . . . - _ - . . . . . - . . . . . - - - - . . . . _ - . - . - . - . - - - .
.-l
.
. l l
U.S. NUCLEAR REGULATORY COMMISSION j REGION I <
l l
i
!
Docket No.: 50-213 l
License No.: DPR-61 i
.
l
Report No.: 50-213/97-02
~
1 l l l Licensee: Connecticut Yankee Atomic Power Company Hartford, CT 06141-0270 i
!
l Facility: Haddam Neck Station !
!
i Location: Haddam, Connecticut !
l b Dates: February 3-7 and February 24-26,1997
'
j i
- Inspectors: Dr. Jason Jang, Senior Radiation Specialist !'
Lonny Eckert, Radiation Specialist l
.
!
Approved by: John R. White, Chief, Radiation Safety Branch j L Division of Reactor Safety j i
,
I
I
!
I i
I i
. I
i-i
!
'
9703280122 970321 PDR ADOCK 05000213 G PDR
. - . _
_ . - . _ - -._ _
- ,- . ~ - --- --. . - -. - . _ _ - - . . . . - _-. -
.
.
< Report Details
'
I Summarv of Plant Status l
.
I Haddam Neck remained shutdown in a defueled condition. No major NRC-regulated i
- activities were conducted during the inspection perio IV. Plant Suonort R1 Radiological Protection and Chemistry (RP&C) Controls R Imolementation of the Radioactive Liauid and Gaseous Effluent Control Proarams i
i Inspection Scope (84750-01)
d
- The inspection consisted of
- (1) touring radioactive liquid and gaseous effluent j pathways and process facilities; (2) reviewing of radioactive liquid and gaseous l effluent release permits; and <(3) reviewing of Licensee Event Report (LER) 96-23.
i
' Observations and Findinas
, The inspectors reviewed selected radioactive liquid and gas processing facilities and equipment including effluent radiation monitors and air cleaning systems. All
'
equipment was considered by the licensee to be operable at the time of the review, with the exception of the steam generator blowdown radiation monitors (R-16 A&B). The licensee had installed and calibrated R-16 A&B, but had not placed this
'
! RMS m service.
I l j During the review of selected radioactive liquid and gaseous effluent discharge l permits, the inspectors determined that the discharge permits were complete and
, met the TS requirements for sampling and analyses at the frequencies and lower I
] limits of detection established in the TS.
The inspectors reviewed LER 96-23 (containment air recirculation). This is
<
discussed in greater detail in Section R2.3.
i i The inspectors also noted that the licensee routinely performed trending analyses i for radioactive liquid and gaseous effluent releases in order to manage and monitor the total amount of releases each year.
l
'
, Conclusions l
Based on the above review, the inspectors concluded that the licensee maintained and implemented the radioactive liquid and gaseous effluent control programs effectivel .
!
____
. . .. - -- . . . . . - . .-
.
R2 Status of RP&C Facilities and Equipment i
R2.1 Calibration of Effluent / Process Radiation Monitorina Systems (RMS) Inspection Scoce (84750-01)
,
The inspectors reviewed the most recent calibration results for the following j selected effluent / process RMS. The inspectors conducted interviews with licensee chemistry and l&C staff and the system engineer. The inspectors also reviewed the
- licensee's RMS self-assessment and RMS work order * Main Stack Noble Gas Radiation Monitor (R-14A);
.
j * Main Stack Wide Range Noble Gas Radiation Monitor (R-148); i e Steam Generator Blowdown Radiation Monitors (R-16 A&B);
- Radioactive Liquid Effluent Radiation Monitor (R-18);
- * Spent Fuel Pool Radiation Monitor (R-19); and
- Test Tank Effluent Radiation Monitor (R-22).
! The inspectors reviewed the following licensee's I&C calibration procedures:
i e SUR 5.2-8 Radiation Monitoring System Calibration (R-14A 4 Main Stack);
4 * SUR 5.2-69 Calibration and Functional Test of the Stack
Wide Range Noble Gas Monitor; (R-14B),
) * SUR 5.2-8 Radiation Monitoring System Calibration (R-16A l Steam Generator Blowdown);
- SUR 5.2.8 Ra-diation Monitoring System Calibration (R-16B
'
4 Steam Generator Blowdown);
- SUR 5.2-8 Radiation Monitoring System Calibration (R-18 i
River Effluent);
- PMP 9.2-19 Radiation Monitoring System Calibration (R-19
- Spent Fuel Pool); and l * SUR 5.2.8 Radiation Monitoring System Calibration (R-22 Recycle and Waste Test Tank Discharge.
'
The inspectors utilized the following documents as a basis to determine whether the above procedures contained sufficient calibration steps to verify conversion factors (calibration factors):
- in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Effluents from Light Water Cooled Nuclear Power Plants, February 1979";
-
d
.
- Regulatory Guide 4.15, " Quality Assurance for Radiological Monitoring Programs (Normal Operations)- Effluent Streams and the Environment, February 1979";
- ANSI N42.18,1980, " Specification and Performance of On-Site instrumentation for Continuously Monitoring Radioactivity in Effluents"; and 0 EPRI TR-102644, " Calibration of Radiation Monitors at Nuclear Power Plants, March 1994". ;
The above noted standerds consist of the primary and secondary calibration methodologies, and quality control, and monitoring guidance. The recommended manner of calibration of the RMS consists of two parts - an electronic and a radiological calibration. Electronic calibration is performed for all electronic components without a radiation detector. One of the most important steps for the electronic calibration is to verify the linear response between pulses (Hz) and count l rates (cpm). These pulses correspond to signals originated from a radiation detector, i.e., the high pulse will respond to the high count rate. The pulse l generator is usually calibrated by the National Institute of Standards and Technology '
(NIST). On completion of the electronic calibration, the radiation detector is reconnected to perform a radiological calibration. The radiological calibration l consists of: (1) construction of the plateau curve to set the operating high voltage, '
(2) construction of either the primary or the secondary calibration curves using multiple source strengths to determine conversion factors ( Ci/cc/ cpm for the primary calibration and pCi/ cpm for the secondary calibration), and (3) comparison of the calibration factor to the previous factor to determine the precision and accurac Observations and Findinos b-1. Adeauacy of Licensee RMS Calibration Techniaues R-14A, R-16A&B. R-18 The licensee installed the following new RMS, as part of an RMS upgrade project in early 1996. (See inspection Report No. 50-213/95-08 for detail):
- Main Stack Noble Gas Radiation Monitor (R-14A);
- Radioactive Liquid Effluent Radiation Monitor (R-18).
e i
As these new RMS were installed, the responsibility for conducting radiological calibrations was transferred from the Chemistry Department to the l&C Department, although the I&C Department lacked experience and procedures for performing radiological calibrations. When developing procedural guidance in conducting radiological calibrations, the I&C Department did not use the techniques which had
[
previously been established by Chemistry Department procedures, but rather develop a more cursory calibration process. The inspectors reviewed the most recent calibration results, as determined by the l&C Department, and found the following weaknesses:
- No electronic calibration data was documented:
- No in-situ primary calibrations were performed;
- No plateaus curves were constructed to determine the optimum operating high voltage;
- Secondary calibration methodology was inadequate because during
'
radiological calibration, the licensee changed the high voltage in order to obtain the expected count rate;
- Conversion factors were not calculated; and
- Linearity for the intended monitoring range was not calculate The inspectors discussed radiological calibration methodology with the licensee's l&C and Chemistry personnel. The inspectors determined that the licensee's calibration procedures were not sufficiently comprehensive or detailed to assure adequate and verifiable calibratio The inspectors noted that prior to the installation of the new R-14A, radiological calibration was performed by the Chemistry Department. The inspectors reviewed the last radiological calibration conducted by the Chmistry Department on the previously installed R-14A and found that the Chemistry Department performed an excellent radiological calibratio R-14B The inspectors reviewed the 1996 calibration results for R-148, main stack wide range noble gas radiation monitor, as shown in the following table. The l&C Department had responsibility to perform electronic and radiological calibrations for this RMS. Quarterly calibrations are required by the T . _ _ _ __
.
.
1st Otr 2nd Qtr 3rd Qtr 4th Qtr 2-7-96 5-7-96 8-23-96 11-27-96 (1) High Voltage 950 Vdc 925 Vdc 923 Vdc 922 Vdc L Desired, cpm 78,400 78,400 78,400 78,400 Measured, cpm 80,400 80,490 81,080 75,780 Cl-36, ID 92-1515 92-1515 92-1515 92-1515 (2) Desired, cpm 8,044 7,912 7,783 7,655 M Measured, cpm 7,720 7,332 7,184 10,900/7600 Ba-133, ID 84-122-3 10578-46 84-122-3 10578-46 (3) Desired, cpm 8,044 7,812 7,783 7,655 H Measured, cpm 7,990 7,960 7,248 7,520 Ba-133, ID 84-122-3 10578-46 84-122-3 10578-46 (1) L = Low Range Noble Gas Monitor (2) M = Mid Range Noble Gas Monitor (3) H = High Range Noble C:s Monitor During a review of the above calibration results, the inspectors identified the following weaknesses:
- A 1-point calibration method was used and the high voltage was changed to meet a specified count rate for the radiological calibration;
- Because the licensee had modified the high voltage to meet a specified count rate, the high range noble gas monitor calibration was particularly questionable because the source used was the same as that used for the mid range noble gas monitor; e l&C supervisory oversight of RMS calibration was inadequate. As noted above, there was no apparent count rate difference despite the large detector volume differences between the mid and high noble gas detector This was an indication of the inadequacy of the RMS calibration technique used for R-14B;
- Because the licensee had conducted a one point calibration, it was not possible to calculate conversion factors for low, mid, and high range monitors or establish linearity; and
_
l
.
.
e A plateau curve was not generated to determine the optimum high voltage setpoin R-19 and R-22 The inspectors reviewed the most recent calibration results for RMS-19 and RMS-22. The l&C and Chemistry Departments had the responsibility to perform electronic and radiological calibrations, respectively. The inspectors identified similar weaknesses for the electronic calibre.;on listed above. The inspectors also identified that the previous radiological calibrations performed by the Chemistry Department were very goo b-2. System Enoineerina The inspectors noted a lack of continuity in system engineer oversight regarding the RMS in a critical period (RMS upgrade project). Both the senior NRC resident inspector and the chemistry manager had noted to the inspectors that the control room RMS panel (SCANRAD) did not appear to be reliable. The most recent licensee audit of the effluents control program, licensee audit No. 96-A10-02, noted that "RMS reliability was not easily evaluated. There is a great deal of concern with the amount of time the RMS is out of service. The SCANRAD system has been inoperable for greater than 30 days." When directly questioned by the inspectors, 3 the system engineer was not able to provide insight into overall system reliability, b-3. Enforcement lmolications
!
'
Section 6.8 of the TS requires, in part, that written procedures shall be established, implemented and maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33 (RG 1.33), February 1978. Appendix A of the RG 1.33, j
" Typical Procedures for Pressurized Water Reactors and Boiling Water Reactors," !
describes typical procedures for the control of radioactivity, including procedures l involving radiation monitoring system l Contrary to the Section 6.8 TS requirement, as of February 7,1997, the licensee had failed to establish and implement procedures sufficient to test the above RMS as evidenced by: (1) no documentation or poor documentation of the electronic calibration data, (2) no performance of in-situ primary calibration, (3) no plateau curve to determine optimum operating high voltage, (4) incorrect performance of the secondary calibration, and (5) no determinations cf conversion factors and linearity for the intended monitoring ranges. This item is considered an apparent violation and will be addressed in separate documentation. (eel 50-213/97-02-01)
I b-4. Interim Corrective Actions 1,1itiated by the Licensee Based on the above reviews and discussions with the licensee representatives, on February 7,1996, the licensee declared the RMS, noted in the inspection scope, to be out-of-service. The licensee initiated compensatory sampling as required by the TS until recalibration was accomplishe .
b-5. Safety Sianificance R-14A
,
For R-14A, the change of responsibilities and the new procedures were ,
implemented after shutdown. The new R-14A was installed, calibrated, and placed in service on August 4,1996. The inspector reviewed selected gaseous releasu -
permits from August 1996 to January 1997. The licensee took grab samples (e.g.,
, containment purge an gas decay tank samples) and analyzed them before release The licensee also performed projected dose calculations based upon sample results before releases as required by TS. These projected dose calculatiori results were well below TS limit ;
The inspectors also attempted to make a comparison between analytical results of grab samples and monitoring results. The inspectors noted that meaningful comparisons were not possible because of: (1) the massive dilution around the sampling probe and (2) the non-isokinetic probe. This can affect the projected dose calculation results to the public for iodine and particulate releases. Projected doses could be either in a conservative or non-conservative direction because a compensation method was used for line losses. However, the inspectors concluded that public health and safety was not impacted and that the TS limits were not exceeded because the possible error was not sufficient to have exceeded the TS limits (sete Section R3 of this inspection report for detail).
R14B For R-148, the safety significance of this issue is higher relative to other monitors -
due to the fact that the monitor was calibrated inadequately and was in this condition during power operations. Because this is an accident monitor, licensee reporting of norrnal effluent releases is not impacte l The inspectors stated to the licensee that the inadequate calibration of this monitor would result in questioning the accuracy of accident off-site dose projections that were based upon readings from RMS R-14B per Emergency Plan 6.2.3.1.(a), " Noble Gas Release Rate Estimates." Notwithstanding, the inspector noted that the licensee could still project accident doses using field monitoring results as described in the emergency pla R-16 A&B For R16A&B, the change of responsibilities and the new procedures were implemented after shutdown. These RMS monitor steam generator blowdown are
! important during operations. Therefore, there was no impact of the improper calibration because the new calibration technique was implemented after shutdow l l
l
8 R-18. R19. and R-22 i For R18, the change of responsibilities and the new procedures were implemented ;
after shutdown. For R-19 and R-22, the new procedures were implemented in !
January of 1995. The chemistry department continued to perform radiological calibrations which provide some measure of RMS accurac The chemistry staff calculated the 1996 projected doses to the public using the !
" Method I" code. The Method I code was developed for radioactive gaseous and ;
liquid release assessments. There is a considerable amount of conservatism in the Method I code so as to avoid unusual releases. The Method 11 code was developed I to be more accurate and uses actual meteorological data. Doses projected by the l Method I are och higher than by Method ll. The licensee published the projected '
doses to the alic, using Method il in the Annual Report. The 1996 projected j doses (by Memod l} of the whole body were well below regulatory limits (e.g.,
whole body doses by airborne was calculated to be 0.92 mrem while the TS limit is !
5.0 mrem).
c. Conclusions The inspectors made the following conclusions based on the above findings:
- Poor safety focus was noted when the responsibility for conducting the !
radiological calibration was transferred from the Chemistry Department to l&C without assuring that proper procedures and technique would be utilize This was the first breakdown of quality verification to assure the operability I
. of the effluent monitors. A second breakdown in quality verification ;
occurred when the Plant Operations Review Committee (PORC) failed to identify the weaknesses in the new l&C procedures used to calibrate certain RMS;
- The licensee's calibration procedures did not contain necessary steps, recommended by Regulatory Guides, ANSI, and EPRI guidance to perform meaningful calibrations of the RMS;
,
- The l&C Department was not prepared to take over full management of the RMS calibration program;
'
- System engineering oversight of the RMS does not appear to be adequate; and
- The radiolog cal calibration techniques utilized by the Chemistry Department remained excclien l l
l
,
.
.
R2.2 Calibration of Area Radiation Monitorino Systems (ARMS) Insoectico Scope (83750)
The inspectors reviewed the most recent calibration results for the following 1 selected ARMS:
- Containment Manipulator Crane Radiation Monitor (R-31);
- Containment Floor Radiation Monitor (R-32);
1 * Spent Fuel Building New Fuel Storage Radiation Monitor (R-33); and
- Spent Fuel Pool Bridge Radiation Monitor (R-34).
- The inspectors also reviewed the following I&C and Health Physics (HP) procedures
- PMP 9.2-141 Calibration of Radiation Monitoring System (Area Monitors),
and
- PMP 9.6-1 Calibration of the ARM Observations and Findinas The l&C and HP Departments had the responsibility to perform electronic and radiological calibrations, respectively. All calibration results were within the licensee's acceptance criteria. Calibration procedures were good and easy to j follo j The inspectors discussed radiological calibration methodology with HP Department personnel. The inspector noted that the responsible individual had good knowledge of the calibration technique ; Conclusions Based on the above review and discussion, tne inspectors determined that the
,
licensee had a good calibration program for ARMS, R2.3 Air Cleanina (Handlina) Systems
- Insoection Scoce (84750-01)
The inspector reviewed the licensee's: (1) most recent surveillance test results, and (2) performance summaries to determine the implementation of TS requirements for the following systems: j
- Primary Auxiliary Building (PAB) exhaust; and ;
__ _ _ _ __ _ _ _ . _ _ _ _ . . _ . _ _ _ _ _ . _ . _ _ _
, .
.
e Containment Air Recirculation (CAR) fan ,
i b. Observations and Findinos The inspectors reviewed the following v .veillance test re:alts: ,
t e Visual Inspection; e in Place HEPA Leak Tests; '
e in-Place Charcoal Leak Tests;
,
o Air Capacity Tests; i
e Pressure Drop Tests; and :
!
e Laboratory Tests for the lodine Cc!!9ctinr. Efficiencie >
i Test results for the PAB were within the licensee's TS acceptance criteria. Three of four CAR fans failed their surveillance. The licensee has written an ACR and an LER !
(96-23) on this matter. At the time of the inspection, the licensee had not determined how to disposition this ACR and LER now that the decision to l decommission the station has been made, i t
,
The inspectors noted that the system engineers were tracking system status, i NRC findings regarding the spent fuel pool air cleaning system were noted in NRC Inspection Report 50-213/96-11 and are pending final resolutio c. Conclusion The inspectors found no discrepancies concerning air cleaning system testing methodology regarding the PAB or the CAR fan R3 RP&C Procedures and Documentation 1
R3.1 Radioactive Effluent Release Procedures I
,
l a. Insoection Scope (84570-01)
The inspectors reviewed the following selected chemistry procedures and Annual Effluent Report to determine whether the licensee could implement the radioactive liquid and gaseous effluent control programs effectively:
- SUR 5.4-13 Liquid Radwaste Release Surveillance; and e SUR 5.4-14 Gaseous Radwaste Release Surveillanc . __ . __ _ _ _ ..___ _ _ . __ _
.
.
11 i r
inspection of the ODCM consisted of: (1) review of setpoint calculation i methodologies; (2) review of selected parameters for calculating projected doses; l and (3) review of radioactive liquid and gaseous discharge pathway b. Observations and Findinos The inspectors determined that the reviewed effluent control procedures were l sufficiently detailed to facilitate performance of all necessary step This report provided data indicating total released radioactivity for liquid and gaseous effluents. This annual report also summarized the assessment of the projected maximum individual and population doses resulting from routine radioactive airborne and liquid effluents. Projected doses to the maximum individual were well below the TS limits as shown in the following tabl .
t Whole Body Thyroid i
Airborne Liquid Airborne liquid TS Limits 5 mrem 3 mrem 15 mrem 10 mrem 1995 Report 0.466 mrem 0.176 mrem 0.081 mrem 0.017 mrem The inspectors determined that there were no anomalous measurements, omissions or adverse trends in the 1995 report and raw data for the 1996 repor !
c. Conclusions ,
Based on the above reviews, the inspectors determined that the licensee effectively !
implemented the TS requirement for reporting effluent releases and projected doses to tiie publi !
R6 RP&C Organization and Administration i a. Inspection Scope (84570-01)
The inspector reviewed the organization and administration of the radioactive liquid and gaseous effluent control programs and discussed with the licensee changes made since the last inspection, conducted in March 1995, b. Observations and Findinos Since the last inspection of this program area, the chemistry organization was reduced by two positions. A new system engineer has been assigned to the RM '
Another major change, impacting the effluents control program, was in consolidating the responsibilities of RMS oversight to the l&C departmen )
l l
$
l
- _ _ _ _ _ -_ __ -
.i *
.
i The inspectors reviewed Connecticut Yankee (CY) Interim Organization dated 3 November 16,1996. The licensee stated that the Interim Organization will be
replaced by the Decommissioning Organization in 1997. The inspectors discussed i chemistry staffing levels during the interim and decommissioning phases with the licensee. The Interim Chemistry Organization consists of two CY technicians, six'
4 contractors (technicians), three CY chemists, one contractor chemist, and the Chemistry Manager. The inspectors also reviewed the licensee's planned chemistry organization for the decommissioning phase. The licensee stated that the number i of decommissioning chemistry staff was not finalized and was still under review.
j c. Conclusions
! The inspectors determined that the chemistry organization was adequately staffed 1 for the interim phase.
i R7 Quality Assurance (QA)in RP&C Activities
, a. Inspection Scope (84750-01)
The inspection consisted of review of the 1996 audit and laboratory quality control j (OC).
, b. Observations and Findinas
The inspectors noted that the 1996 audit was thorough and was conducted by -
individuals with backgrounds in chemistry and effluents. Some items with significance to the effluents control program were noted and corrected (main stack flow rate meter calibration frequency). QA had also identified problems with the SCANRAD computer (see Section 2.1, b-2). As a result of these findings, the QA Department had decided to increase their surveillances of the RM The inspectors noted that QC for chemistry measurements was very good and included blind, spike, and duplicate samplin c. Conclusions Based on the above reviews, the inspectors determined that the licensee met the QA audit requirement .
-
,
R8 Miscellaneous issues ,
R8.1 Review of Uodated Final Safety Analysis Report (UFSAR) Commitments A recent discovery of a licensee operating their facility in a manner contrary to the I Updated Final Safety Analysis Report (UFSAR) description h!ahlighted the need for a special focused review that compares plant practices, procedures and/or parameters j to the UFSAR descriptio ,
e While performing the inspections discussed in this report, the inspectors reviewed the applicable portions of the UFSAR that related to the areas inspected. The i following inconsistency was noted between the wording of the UFSAR and the plant practices, procedures and/or parameters observed by the inspector ,
- The 10 CFR 50.59 implications regarding RMS calibration discrepancies are {
unresolved pending further review as described in Section 2.1 of this report. l (URI 50-213/97-02-02)
V. Manaaement Meetinas !
X1 Exit Meeting Summary l The inspectors presented the inspection results to members of licensee management at the ,
'
conclusion of the inspection on February 7 and 26,1997. The licensee acknowledged the findings presente !
,
'
Licensee representatives emphasized that the effluent monitors detailed in Section 2.1 of this report were considered to be inoperable; compensatory sampling for these same RMS .
was initiated; and indication remained available in the control room for trending purpose l l
l
l l
I I
. ._ ._ . - - . . . _ - - . _- _ . - _ _ _ . _ . _ ._ - _ __ _ . _ . . . _ _ _ _ _ . _ . .__
+
.
.
14 l i
PARTIAL LIST OF PERSONS CONTACTED ,
l i
Licensee '
i D. Bazinet, Supervisor, I&C
'
G. Bouchard, Services Director S. Carnesi, System Engineer M. Deney, Performance Engineer J. LaPlatney, Unit Director {
i i
i NRC i M. Conner, Project Engineer, DRP Branch 8 W. Raymond, Senior Resident inspector {
f
.
,
s
!
i l
,
l t
l
!
i i
I h
I h
$
-
d i
1
. - . . , , - -
.
INSPECTION PROCEDURES USED IP 84750-01: Occupational Exposure i
l ITEMS OPEN, CLOSED, AND DISCUSSED Open 97-02-01 eel Failure to Establish Adequate RMS Calibration Procedures 97-02-02 URI UFSAR Calibration Discrepancies Closed
,
NONE Discussed LER 96-23 CAR fan surveillance failure I
l i
i
!
i
. . . _ . __ _ . _ _ _._ . _ - _ . . _ . . . . _ _ . _ - _ _ . - _ .. _ _ _ - . _ __
.
[ LIST OF ACRONYMS USED ACR Adverse Condition Report
'
ALARA As Low As is Reasonably Achievable l CY Connecticut Yankee
,
'
LER Licensee Event Report NOV Notice of Violation
NRC Nuclear Regulatory Commission i NUSCO Northeast Utilities Service Company
, PDR Public Document Room
] PORC Plant Operations Review Committee
- -
PWR Pressurized Water Reactor a
QC Ouality Control
-
RPM Radiation Protection Manager i RWPs Radiation Work Permits TLD Thermoluminescent Dosimeter UFSAR Updated Final Safety Analysis Report
!
i I
,
?
i
,
l l
.- --- _ - --