Revised Monthly Operating Rept for Apr 1983
ML20082T308
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082T191 List:
References
NUDOCS 8312150330
Download: ML20082T308 (1)


Text

-

l

- OPERATING DATA REPORT ( April Revision) l

(* Denotes revised item) DOCKET NO. 50-336

- DATE 11/15/83 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 -

Ext. 4431 OPERATING STATUS

1. Unit Name: Millstone 2 Notes Items 21 and 22 '
2. Reporting Period: April 1983 cumulative are weighted
3. Licensed Thermal Power (MWt): 2700 ave. unit operated at
4. Nameplate Rating (Gross MWe): 909 2560 MW thermal prior to
5. Design Electrical Rating (Net MWe): 870 its uprating to its
6. Maximum Dependable Capacity (Gross MWe): 895 current 2700 MW thermal
7. Maximum Dependable Capacity (Net MWe): 864 power level.
8. If Changes Occur in Capscity Ratings (Items Number 3 Through 7) E Since Last Report, Give Reasons: -

N/A

9. Power Level To Which Restricted, If Any (Net MWe) N/A
10. Reasons For Restrictions, If Any: N/A .

This Month Yr.-to-Date Cumulative A

11. Hours In Reporting Period __ 719 _

2879 64391 -

12. Number Of Hours Reactor Was Critical 719 2478.4 47713.2
13. Reactor Reserve Shutdown Hours 0 0 2205.5
14. Hours Generator On-Line 719 2342.8 45530.1 468.2
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal Energy Generated (MWH) 1921628 6164769
  • 114598974

. i

17. Gross Elec. Energy Generated (MWH) 632700 2012630 37243478
18. Net Electrical Energy Generated (MWH) 610462 1932663.3 35694476
19. Unit Service Factor 100 81.4 70.7  ;
20. Unit Availability Factor 100 81.4 71.4
21. Unit Capacity Factor (Using MDC Net) 98.3 77.7 66.5
22. Unit Capacity Factor (Using DER Net) 97.6 77.2 65.6 (
23. Unit Forced Outage Rate 0 16.9 19.3 _
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): -

Refueling Outage, MAY 28, 1983, 16 weeks. .

1

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved

}

N/A N/A j INITIAL CRITICALITY N/A N/A . '_

INITIAL ELECTRICITY COMMERCIAL OPERATION N/A N/A -

l

' . l j

=_

j 8312150330 831115 PDR ADOCK 050<N1336 ,