Text

- - - . . - . . .. -- ., -__ __

/ w

~

l OPERATING DATA REPORT (JUNE REVISION)

~

(* Denotes revised item) DOCKET No. 50-336

.. DATE 11/15/83

, , COMPLETED BY J._Gibson TELEPHONE (203) 447-1791 Ext. 4431 OPERATING STATUS d

1. Unit Name: Millstone 2 Notes: Items 21 and 22 cumulative
2. Reporting Period: - June 1983 (Revision) are weighted ave. unit
3. Licensed Thermal Power (MWt): 1700 operated at 2560 MW
4. Nameplate Rating (Gross MWe): 909 thermal prior to its
5. Design Electrical Rating (Net MWe): 870 ,

uprating to its current

6. Maximum Dependable Capacity (Gross MWe): 895 2700 MW thermal power
7. Maximum Dependable Capacity (Net MWe): 864- level.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A ,

9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 4343 65855
12. Number Of Hours Reactor Was Critical 0 3130.5 48365.3

~ 13. Reactor Reserve Shutdown Hours 0 0 2205.5

14. Hours Generator On-Line 0 2994.9 46182.2
15. Unit Reserve Shutdown Hours 0 0 468.2
16. Gross Thermal Energy Generated (MWH) 0 7877464
  • 116311669
17. Gross Elec. Energy Generated (MWH) 0 2575530 37806378
18. Net Electrical Energy Generated (MWH) (-3011) 2471358.3 36233171
19. Unit Service Factor 0 69.0 70.1
20. Unit ^ Availability Factor 0 69.0 70.8 j
21. Unit Capacity Factor (Using MDC Net) O 65.9 65.9 l
22. Unit Capacity Factor (Using DER Net) 0 65.4 65.0'  !
23. Unit Forced Outage Rate 0 13.7 19.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Continuation of Refuel / Maintenance Outane

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Dperation): Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A si312150340 831115 PDR ADOCK 05000336 R PDR

. . . . _ , _ . - _ . _ . . . . _ . . - ~ _ _ . . _ _ _. _ _ . .._. _ . -_. _ - _ .- _ _ . . _ _ _ _ _ _ _ _ _- _ . _