Revised Monthly Operating Rept for Jul 1983
ML20082T332
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082T191 List:
References
NUDOCS 8312150345
Download: ML20082T332 (1)


Text

,

o OPERATING DATA REPORT (July Revision)

(* Denotes revised item)

DOCKET NO.

50-336 DATE 11/ lb/ 63 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 l

Ext. 4431 OPERATING STATUS

{

1.

Unit Name:

Millstone 2 Notes:

Items 21 and 22 cumulative 1

2.

Reporting Period:

July 1983 are weighted ave. unit I

l 3.

Licensed Thermal Power (MWt):

2700 operated at 2560 MW 4.

Nameplate Rating (Gross MWe):

909 thermal prior to its 5.

Design Electrical Rating (Net MWe):

870 uprating to the current 6.

Maximum Dependable Capacity (Gross MWe): 895 2700 MW thermal power 7.

Maximum Dependable Capacity (Net MWe): 864 level.

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A t

This Month Yr.-to-Date Cumulative l

11.

Hours In Reporting Period 744 5087 66599 12.

Number Of Hours Reactor Was Critical 0

3130.5 48365.3 13.

Reactor Reserve Shutdown Hours 0

0 2205.5 14.

Hours Generator On-Line 0

2994.9 46182.2 15.

Unit Reserve Shutdown Hours 0

0 468.2 16.

Gross Thermal Energy Generated (MWH) 0 7877464 9 16311669 17.

Gross Elec. Energy Generated (MWH) 0 2575530 37806378 _

18.

Net Electrical Energy Generated (MWH) (-2914.9) 2468443.4 36230256 19.

Unit Service Factor 0

58.9 69.3 20.

Unit Availability Factor 21.

Unit Capacity Factor (Using MDC Net) _

0 ES.9 70.0 0

56.2 65.0 22.

Unit Capacity Factor (L' sing DER Net) 0 55.8 64.2 23.

Unit Forced Outage Rate 0

13.7 19.1 24.

Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

Continuation of Refuel /Maintenar. e Outage 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8312150345 831115 PDR ADOCK 05000336 R