l OPERATING DATA REPORT ( April Revision) l
(* Denotes revised item)
DOCKET NO. 50-336 DATE 11/15/83 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 Ext. 4431 OPERATING STATUS 1.
Unit Name: Millstone 2 Notes Items 21 and 22 2.
Reporting Period:
April 1983 cumulative are weighted 3.
Licensed Thermal Power (MWt):
2700 ave. unit operated at 4.
Nameplate Rating (Gross MWe):
909 2560 MW thermal prior to 5.
Design Electrical Rating (Net MWe):
870 its uprating to its 6.
Maximum Dependable Capacity (Gross MWe): 895 current 2700 MW thermal 7.
Maximum Dependable Capacity (Net MWe): 864 power level.
8.
If Changes Occur in Capscity Ratings (Items Number 3 Through 7)
E Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe)
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative A
11.
Hours In Reporting Period
__ 719 2879 64391 12.
Number Of Hours Reactor Was Critical 719 2478.4 47713.2 13.
Reactor Reserve Shutdown Hours 0
0 2205.5 14.
Hours Generator On-Line 719 2342.8 45530.1 15.
Unit Reserve Shutdown Hours 0
0 468.2
- 16. Gross Thermal Energy Generated (MWH) 1921628 6164769
- 114598974
. i 17.
Gross Elec. Energy Generated (MWH) 632700 2012630 37243478 18.
Net Electrical Energy Generated (MWH) 610462 1932663.3 35694476
- 19. Unit Service Factor 100 81.4 70.7 20.
Unit Availability Factor 100 81.4 71.4
- 21. Unit Capacity Factor (Using MDC Net) 98.3 77.7 66.5 22.
Unit Capacity Factor (Using DER Net) 97.6 77.2 65.6
(
- 23. Unit Forced Outage Rate 0
16.9 19.3 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, MAY 28, 1983, 16 weeks.
1 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
}
j INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l