Revised Monthly Operating Rept for Aug 1983
ML20082T336
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082T191 List:
References
NUDOCS 8312150348
Download: ML20082T336 (1)


Text

y u

=

ll OPERATING DATA REPORT (Auaust Revision)

[

(* Denotes revised item)

DOCKET NO.

50-336

?

DATE ~ 11/15/83 COMPLETED BY J. Gibson E

TELEPHONE (203) 447-1791 E

Ext. 4431 OPERATING STATUS 1.

Unit Name:

Millstone 2 Notes Items 21 and 22 2.

Reporting Period:

August 1983 cumulative are weighted h

3.

L.icensed Thermal Power (MWt):

2700 ave. unit operated at

[

4.

Nameplate Rating (Gross HWe):

909 2560 mw thermal prior to 5.

Design Electrical Rating (Net MWe):

870 its uprating to the current 6.

Maximum Dependable Capacity (Gross MWe):

895 2700 mw thermal power level.

7.

Maximum Dependable Capacity (Net MWe):

864 t

li 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) c.

Since Last Report, Give Reasons:

N/A C

9.

Power Level To Which Restricted, If Any (Het MWe):

N/A g

10.

Reasons For Restrictions, If Any:

~

gg N/A F

rm a

E6 This Month Yr. - to-Date Cumulative E

6

11. Hours In Reporting Period 744 5831 67343 5

12.

Number Of Hours Reactor Was Critical 0

3130.5 48365.3 i

h 13.

Reactor Reserve Shutdown Hours 0

0 2205.5

=

14.

Hours Generator On-Line 0

2994.9 46182.2 m

P

15. Unit Reserve Shutdown Hours 0

0 468.2 E

16. Gross Thermal Energy Generated (MWH) 0 7877464
  • 116311669 _

b

17. Gross Elec. Energy Generated (MWH) 0 2575530 37806378 E
10. Net Electrical Energy Generated (MW't) (-3007) 2465436.4 36227249 7

19.

Unit Service Factor 0

51.4 68.6 p

20. Unit Availability Factor 0

51.4 69.3 g

21. Unit Capacity Factor (Using MC Net)

O 48.9 64.2 22.

Unit Capacity Factor (Using DER Net) 0 48.6 63.3 g

23. Unit Forced Outage Rate 0

13.7 19.1 g

Shutdowns Scheduled Over Naxt 6 Months (Type, Date, and Duration of Each):

r 24.

Continuation of Refuel / Maintenance Outage 1

h 25.

If Shut Down At End of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITI AL CRITICALITY N/A

_N/A, _

=

INITIAL ELECTRICITY N/A

_N/A _

=

E Co mERCIAL OPERATION N/A NJA,

b?

m F

8312150348 831115 PDR ADOCK 05000336 gg R