Text
y u
=
ll OPERATING DATA REPORT (Auaust Revision)
[
(* Denotes revised item)
DOCKET NO.
50-336
?
DATE ~ 11/15/83 COMPLETED BY J. Gibson E
TELEPHONE (203) 447-1791 E
Ext. 4431 OPERATING STATUS 1.
Unit Name:
Millstone 2 Notes Items 21 and 22 2.
Reporting Period:
August 1983 cumulative are weighted h
3.
L.icensed Thermal Power (MWt):
2700 ave. unit operated at
[
4.
Nameplate Rating (Gross HWe):
909 2560 mw thermal prior to 5.
Design Electrical Rating (Net MWe):
870 its uprating to the current 6.
Maximum Dependable Capacity (Gross MWe):
895 2700 mw thermal power level.
7.
Maximum Dependable Capacity (Net MWe):
864 t
li 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) c.
Since Last Report, Give Reasons:
N/A C
9.
Power Level To Which Restricted, If Any (Het MWe):
N/A g
10.
Reasons For Restrictions, If Any:
~
gg N/A F
rm a
E6 This Month Yr. - to-Date Cumulative E
6
- 11. Hours In Reporting Period 744 5831 67343 5
12.
Number Of Hours Reactor Was Critical 0
3130.5 48365.3 i
h 13.
Reactor Reserve Shutdown Hours 0
0 2205.5
=
14.
Hours Generator On-Line 0
2994.9 46182.2 m
P
- 15. Unit Reserve Shutdown Hours 0
0 468.2 E
- 16. Gross Thermal Energy Generated (MWH) 0 7877464
- 116311669 _
b
- 17. Gross Elec. Energy Generated (MWH) 0 2575530 37806378 E
- 10. Net Electrical Energy Generated (MW't) (-3007) 2465436.4 36227249 7
19.
Unit Service Factor 0
51.4 68.6 p
- 20. Unit Availability Factor 0
51.4 69.3 g
- 21. Unit Capacity Factor (Using MC Net)
O 48.9 64.2 22.
Unit Capacity Factor (Using DER Net) 0 48.6 63.3 g
- 23. Unit Forced Outage Rate 0
13.7 19.1 g
Shutdowns Scheduled Over Naxt 6 Months (Type, Date, and Duration of Each):
r 24.
Continuation of Refuel / Maintenance Outage 1
h 25.
If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITI AL CRITICALITY N/A
_N/A, _
=
INITIAL ELECTRICITY N/A
_N/A _
=
E Co mERCIAL OPERATION N/A NJA,
b?
m F
8312150348 831115 PDR ADOCK 05000336 gg R
PDR pr
-