Revised Monthly Operating Rept for Aug 1983
ML20082T336
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082T191 List:
References
NUDOCS 8312150348
Download: ML20082T336 (1)


Text

'

y .

u

=

ll OPERATING DATA REPORT (Auaust Revision)

[ (* Denotes revised item) DOCKET NO. 50-336

? DATE ~ 11/15/83 E

COMPLETED BY J. Gibson TELEPHONE (203) 447-1791 E

Ext. 4431 OPERATING STATUS Millstone 2

1. Unit Name: Notes Items 21 and 22
2. Reporting Period: August 1983 cumulative are weighted h 3. L.icensed Thermal Power (MWt): 2700 ave. unit operated at

[ 4. Nameplate Rating (Gross HWe): 909 2560 mw thermal prior to

5. Design Electrical Rating (Net MWe)
870 its uprating to the current
6. Maximum Dependable Capacity (Gross MWe): 895 2700 mw thermal power level.

t 7. Maximum Dependable Capacity (Net MWe): 864 -

li 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) _

c. Since Last Report, Give Reasons:

$ N/A C 9. Power Level To Which Restricted, If Any (Het MWe): N/A

~

g 10. Reasons For Restrictions, If Any:

gg N/A ,

F rm a

E 6 This Month Yr. - to-Date Cumulative E

6 11. Hours In Reporting Period 744 5831 67343 _

5 12. Number Of Hours Reactor Was Critical 0 3130.5 48365.3 i=

h 13. Reactor Reserve Shutdown Hours 0 0 2205.5 m

14. Hours Generator On-Line 0 2994.9 46182.2 P 15. Unit Reserve Shutdown Hours 0 0 468.2 _

E 16. Gross Thermal Energy Generated (MWH) 0 7877464

  • 116311669 _ -

b 17. Gross Elec. Energy Generated (MWH) 0 2575530 37806378 E 10. Net Electrical Energy Generated (MW't) (-3007) 2465436.4 36227249 7 .

19. Unit Service Factor 0 51.4 68.6  :

p 20. Unit Availability Factor 0 51.4 69.3 g 21. Unit Capacity Factor (Using MC Net) O 48.9 64.2 .

Unit Capacity Factor (Using DER Net) 0 48.6 63.3 g 22.

13.7 19.1 g 23. Unit Forced Outage Rate 0 r 24. Shutdowns Scheduled Over Naxt 6 Months (Type, Date, and Duration of Each):

Continuation of Refuel / Maintenance Outage 1 h 25. If Shut Down At End of Report Period, Estimated Date of Startup:

- 26. Units In Test Status (Prior to Commercial Operation)
Forecast Achieved i N/A _N/A, _ -

= INITI AL CRITICALITY

_N/A _

N/A

= INITIAL ELECTRICITY Co mERCIAL OPERATION N/A NJA , . -

E .,

b?

m F

8312150348 831115 g PDR ADOCK 05000336 g R PDR pr -

-