Revised Monthly Operating Rept for Sept 1983
ML20082T341
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1983
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20082T191 List:
References
NUDOCS 8312150351
Download: ML20082T341 (1)


Text

..

OPERATING DATA REPORT (September Revision)

(* Denotes revised item.)

DOCKET NO. 50-336 DATE 11/15/83 COMPLETED BY J. Gibson TELEPHONE (203) 44F 1791 Ext. 4431 OPERATING STATUS 1.

Unit Name:

Millstone 2

' Notes Items 21 and 22 2.

Reporting Period:

September 1983 cumulative are weighted 3.

Licensed Thermal Power (MWt):

27GO ave. unit operated at 2560 4.

Nameplate Rating (Gross MWe):

909 MW thersal prior to its L.

Design Electrical Rating (Net MWe):

870 uprating to the current 6.

Maximum Dependable Capacity (Gross MWe):

895 2700 MW thermal power 7.

Maximum Dependable Capacity (t;et MWe):

864 level.

8.

If Changes Occur in Capacity Ratings (Items Number 3 Throegh 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 6551 68063 12.

Number Of Hours Reactor Was Critical 0

3130.5 46365.3 13.

Reactor Reserve Shutdown Hours 0

0 2205.5 14.

Hours Generator On-Line 0

2994.9 46182.2 15.

Unit Reserve Shutdown Hours 0

0 468.2 16.

Gross Thermal Energy Generated (MWH) 0 7877464

  • 116311669 17.

Gross Elec. Energy Generated (MWH) 0 2575530 37806378 18.

Net Electrical Energy Generated (MWH)

(-3035) 2462401.4 36224214 19.

Unit Service Factor 0

45.7 67.9 20.

Unit Availability Factor 0

45.7 68.5 21.

Unit Capacity Factor (Using MDC Net) 0 43.5 f 3. 5 22.

Unit Capacity Far. tor (Using DER Net) 0 43.2 62.6 23.

Unit Forced Outage Rate 0

13.7 19.1 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Continuation of Refuel / Maintenance Outage 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A B312150351 831115 PDR ADOCK 05000336 R