Application for Amend to Licenses DPR-77 & DPR-79,consisting of Change 91-08,revising Tech Specs Re Core Operating Limit Rept
ML20091B240
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/24/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091B244 List:
References
NUDOCS 9105310046
Download: ML20091B240 (3)


Text

._ .___._ _ ._. _ =__. _ _ _ _ ._ _ . _ __ _.__ _.. _ ._._ -m.m_. _ _ _ _ _ _ _ -

1 )

o d

' ~~'

%,nm. m, Afm, 3 a um ,4 v,, ,#,,,, s , ,, .,. ...e rc>

MAY 241991 TVA-SQN-TS-91-08 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN Document Control Denk Washington, D.C. 20555 Centlement in the Matter of ) Docket Non. 50-327 Tennecuco Valley Authority ) 50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECitNICAL SPECIFICATION (TS) CilANGE 91-08, CORE OPERATING LIMIT REPORT (COLR)

In accordance with 10 CFR 50.90, we are encioning a requested amendment to Licensen DPR-77 and DPR-79 to change the TSo of SQN Units 1 and 2. As directed by Generic Letter (GL) 88-16. " Removal of Cyclo-Spect(ic parameter Limits From Technical Specifications," the proposed change will delete core operating limits from the TSs and create the COLR to contain those limits. Note that in addition to the guidance provided by GL 88-16, the guidance from Westinghouse ownnes Group (WOG) provided in WOG 90-016 has been utilized in developing this TS chango.-

The propocod TS change is identified in Enclosure 1. The justification for the proposed TS change 10-provided in Enclosure 2. A proposed determlitation of no significant hazardo consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. A cample C0tR with representative core data is provided in Enclosure 4.

As indicated in NRC's letters to TVA dated May 23 and November 2, 1990, I implementation of CL 88-16 would prevent the need to request an exemption to TS 6.9.1.14 if the Radial peaking Factor Hoport has not been provided to NRC 60 days before cycle initial criticality. The typical core analysis strategy is to finalize the core configuration after core-off-load. This will allow the plant to redoelgn the core if any of the ass 9mb11ec planned for reload are damaged or havo leaking fuel rods. SQN currently plano to start the Unit 1 Cycle 5 refueling outage on I t

{l 9105310046 910524 / r PDR-P ADOCK 05000327- '

)

PDR i 1

2 MAY 241991 U.S. Nuclear Hoe.utatory Connission October 4,1991. NHC approval of the propocod TS chango will be needed before the start of the upcoming Unit 1 outage to allow the coro analysin strategy discucced abovo to be implemented without the need for an exemption. A 30-day implementation period from recolpt of the TS change lo requented to allow for procedural changen.

please direct questlosis concerning this insuo to W. C. 1,udwig at (615) 843-1460.

Very truly youro.

TENNESSEE val.l,EY AUTilOlllTY

/

l w E. O. Wallace, Manager Nuclear Ideenninti attd itegulatory Affaira Sworn thlo to d {nd daysubseribed of _/f before  % mo 1991 4%uh b. I 42

, Notary public Hy Conclusion Expiron_N I N Enclosures cc: See pago 3 l

1 l

l l

l

_ _ ~ _ . _ _ _ _ _ _ _ _ . _ ,_ _ __. _

5 MAY 241991 i U.S. Nuclear Regulatory Commission cc. (Enclonures):

American Nuclorr Insurora Attention I.ibrat' inn The Exchange, Suito 245 270 Farmington Avenuo Farmington, Connecticut 06032 Ms. S. C. Black, Deputy Director Project Directorato 11-4 U.S. Nuclear Regulatory Comm1solon Ono White Flint, North 11555 Rockvillo Pike Hockville, Maryland 20852 Mr. D. E. 1.aBargo Project Manager '

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Piko Rockville, Maryland 20852 Mr. Michnol !!. Mobley, Director (w/o Enclosures)

Division of Radiological lloalth T.E.R.R.A. Building 150 9th Avenuo, N Nashville, Tennena00 31203 NRC Hesident inspect.or Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennesseo 37379 Mr.-B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commisnion Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l