Forwards NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Seismic Evaluation Rept & Rev 0 of Vol I of VI of NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Ssell & Relay Evaluation Rept, in Response to GL 87-02
ML20094P021
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/20/1995
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094P024 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9511280275
Download: ML20094P021 (4)


Text

_ - - - . __- - .

Northem States Power Company Prairie Island Nuclear Generating Plant i r i7 Wakonade Dr. East Welch, Minnesota 55089

)

November 20,1995 Generic Letter 87-02 i i

i l

l U S Nuclear Regulatory Commission Attn: Document Centrol Desk )

Washington, DC 20555-0001  !

l PRAIRIE ISLAND NUCLEAR GENERATING PLANT I Docket Nos. 50-282 License Nos. DPR-42 l 50-306 DPR-60 Response to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment '

in Ooeratina Reactors. Unresolved issue (USI) A-46 On February 19,1987, the NRC issued Generic Letter 87-02, " Verification of Seismic 1 Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved issue (USI) A-46". This Generic Letter encouraged utilities to participate in a generic program to resolve verification issues associated with USI A-?6. As a result, the Seismic Qualification Utility Group (SQUG) developed the " Generic Implementation i Procedure (GIP) for Seismic Verification of Nuclear Plantt Equipment".

On May 22,1992, the NRC Staff issued Generic Letter 87-02, Supplement 1, which constituted the NRC Staffs review of the GIP and which included Supplemental Safety Evaluation Report Number 2 (SSER-2) on the GIP, Revision 2, corrected on February 14,1992. The NRC letter to SQUG enclosing SSER-2 requests that SQUG members  ;

provide to the NRC a schedule for implementing the GIP. Via letter dated September  !

21,1992, we notified the Staff that we would implement the GIP and would provide a l Summary Report as outlined by the GlP by November 20,1995. This Summary Report is attached to this letter. The Summary Report is in two parts:

1. USNRC USl A-46 Resolution Seismic Evaluation Report, Prairie Island Nuclear Generating Plant Units 1 and 2, November 1995, prepared by i

i NCOG5 .. ,d i 9511290275 951120 PDR ADOCK 05000282 \\ 4

_ E._._ ..._ _ . _ P1DRam l

USNRC NORTHERN STATES POWER COMPANY November 20,1995 Page 2 Stevenson & Associates

2. l USNRC USI A-46 Resolution SSEL and Relay Evaluation Report, Revision 0, November 1995, Volume I of VI prepared by Engineering Planning and Management, Inc.

As a result of our implementation of the GIP for Prairie Island, outliers were identified, as discussed in the Summary Report. We commit to resolving all of the outliers, we do ]

not intend to leave any outliers unresolved. We will evaluate resolution options '

available and we ccmmit to submitting to the NRC our schedule for accomplishing all resolutions within 90 days of the end of our Unit 1 refueling outage scheduled to start in January 1996.

Charging pump speed controlis also an issue requiring resolution. it is discussed in

. Section 3.2.3 of the "SSEL and Relay Evaluation Report" portion of the Summary Report rather than in the lists of outliers elsewhere in the report. Although speed -

control isn't listed in the report as a seismic outlier, it will be treated as an outlier until resolved; thus, we commit to resoluti 1 of the concern. Resolution may be different -

than that outlined in the discussion of Section 3.2.3.

Regarding the future use of GlP for Prairie Island, we may use the GIP methodology to verify the seismic adequacy of any new or replacement equipment or parts.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you require further -

information.  !

/ he Michael D Wadley Plant Manager Prairie Island Nuclear Generating Plant  ;

c: Regional Administrator-Ill, NRC  ;

NRR Project Manager, NRC Sr Resident inspector, NRC J Silberg Attachments (see next page) 8702SQUG. DOC l

g n --

g m % --- w w y-er- y .c s --- - --- -m-w w y - e-+w -e w y

. . . . . - - - . - . - - . . .- . _ . _ . ~ . . . . . .. . . . . .. . . . - .

1*

USNRC NORTHERN STATES POWER COMPANY November 20,1995 Page 3 Attachments: a) Affidavit to the US Nuclear Regulatory Commission I

b) Summary Report consisting of 2 parts:

1. USNRC USI A-46 Resolution Seismic Evaluation Report, Prairie Island Nuclear Generating Plant Units 1 and 2, November 1995, prepared by Stevenson & Associates
2. USNRC USI A-46 Resolution SSEL and Relay Evaluation Report, Revision 0, November 1995. Volume I of Vi prepared by Engineering Planning and Management, Inc.

I i

l l

i l

l i

a702sovo. Doc

UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50-282 DOCKET NO. 50-306 Response to Generic Letter 87-02, Supplement i Verification of Seismic Adequacy of Mechanical anci Electrical Equipment in Operating Reactors, Unresolved issue (USI) A-46 Northem States Power Company, a Minnesota corporation, by this letter dated November 20,1995 hereby submits information required by Generic Letter 87-02, Supplement i for the Prairie Island Nuclear Generating Plant.

This letter contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By b '( S.

Michael D Wadley Plant Manager Prairie island Nuclear Generating Plant On this kO day of [ [before me a notary public in and said County, personally appeared, Michael D Wadley, Plant Manager, Prairie Island Nuclear Generating for Plant, and being first duly swom acknowledged that he is authorized to execute this document on behalf of Northem States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief the statements made in it are true and that it is not interposed for delay.

ho V -