ML20094P228

From kanterella
Revision as of 17:22, 2 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Applicant Exhibit A-29,consisting of Work History & Educational Background for Util Project Engineer
ML20094P228
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/20/1992
From: Love J
ALABAMA POWER CO.
To:
References
CIVP-A-029, CIVP-A-29, NUDOCS 9204070290
Download: ML20094P228 (3)


Text

. * * /b 2 9 APCo Exh'ait 29 So -3cf 36 / Gt W zo/9' z- . D.L;LD Nd iG J. E. IDVE

(/ Project Engineer W MAR 13 P4 :19 WORK JISTORY ,

PROJECT ENGINEER - Bechtel ( Years) (rj n g g gg ovChi % ur u ,. m Mr. Love is currently a ?roject Engineer responsible for electrickF and control systems, mechanical, civil, and plant facilities design for the PWR Joseph M. Farley Nuclear Plant Units 1 and 2, 860 MW aach for Alabama Power Company. He is responsible for managing projects related to plant operability improvements, design licensing commitments, and maintenance improvements. This includes management, direct coordination with client engineering, construction and operations personnel, equipment suppliers, and project engineering personnel, as well as design project scoping and planning / scheduling activities.

IS ENGINEERING SUPERVISOR - Bechtel (){ Years)

Prior to being assigned as Project Engineer, Mr. Love was the Electrical and Control Systems Engineering Supervisor on the Farley project. During this time, he was responsible fer design and supervision of all electrical control and instrumentstion engineering activities within Bechtel's scope of design. This included processing of design changes and design improvements licensing

/^ requested by the client for the operating units, activities for Units 1 and 2, and coordination with Southern

( Company Sercices for design.

Mr. Love's previous assignment was as Electrical Engineering Supervisor for the BWR Grand Gulf Nuclear Station Units 1 and 2, He was 1300 MW each, for Mississippi Power & Light Company.

responsible tor supervision of all This engineering related to the included preparation of electrical design of the station.

design schedules and budgets, system descriptions, and design calculations; development of electrical equipment specifications; evaluation of equipment proposals; preparation of electrical single lines and three line meter and relay diagrams; , preparation of control schematics for the electrical and process control systems; and licensing activities.

SENIOR ENGINEER / ENGINEER - Bechte3 (5 Years) i Prior to his assignment at Grand Gulf, Mr. Love served as

' Electrical Nuclear Control Group Leader or. the PWR Calvert Cliffs Nuclear Power Plant Units 1 and 2, 845 MW each, for Baltimore Gas and Electric Company. He was responsible for design and supervision of engineering associated with plant process instrumentation and computers, nuclear instrumentation, radiation monitoring system, emergency diesel generators, reactor regulatlng and protective systems, main and unit transformers, containment electrical penetration assemblies, plant synchronization an,1 (s breaker controls, and plant necurity system.

I f 9204070290 920220 i PDR ADOCK 05000348 0 PDR l

-,q

  • LL> w~ k \ ' -N ')

J Q h.i fa

,-,-c,

$ I ((#

tw. OUwl Exh, tio.naalayunu u._____---

M-inunJfhd4/c $

. -u.. mvav2ntrpt.%cha 1 -- _ . n wen - -

On f ; l '! r _ _ _ .. _ __ _. ._

U' Mi rt Of _ __ _ .__ , _ _ _ _ E ATE _ ..

aw- , -

f

- - . v. w ,, . - - _ . _

nrur J fp[ij) h O

/

O

I- .

\ ..

J. E. WTE (Continued) .

EDUCATION

~

BS, Electrical Engineering Technology, Pennsylvania Si ate -

University '

MS, Engineering (Nuclear), Catholic University of America O

k o - . . .

^ ^ ~ " " - - - - - - - - = - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ , _ , _ __ ,___