TS Change Request 92-04 to Licenses DPR-77 & DPR-79,changing TS 3/4.6.5.3, Ice Condenser Doors & Associated Bases to Add Action Statement to Provide for Potential Condition of Ice Condenser Inlet Doors Restrained from Opening
ML20098D717
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/26/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098D719 List:
References
CON-TVA-SQN-TS-92-04, CON-TVA-SQN-TS-92-4 NUDOCS 9205290303
Download: ML20098D717 (2)


Text

.

I May 26, 1992 TVA-SQN-TS-92-04 10 CFR 50.90 U.S. Nuclear Regulatory Cormnission ATTN: Document Control Desk ~

Washington, D.C. 20'55 Gentlemen!

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-04,

" REVISION OF ACTIONS FOR ICE CONDENSER DOORS" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change involves TS 3/4.6.5.3, " Ice Condenser Doors," and the associated TS bases. The proposed chanFe adds an additional action _

etatement to provide for the potential condition of the ice condenser inlet doors being physically restrained from opening.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

TVA requests a 30-day implementation period for this TS change following issuance.

ADO [R R

pp[

///

l

= l U.S. Nuclear Regulatory Conraission Page 2 ,

May 26,-1992 '

Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.

Sincerely, Y

h hC)k

[J. L. Wilson Suorn to ud subsc ib d-before me th 44 % ' day _of. f !)_ 1992

./

Notary Public

}l My Commission Expires _t

  1. l/ [

[

[

-f[

Enclosures-cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North

'- 11555 Rockville Pike L Rockville, Maryland 20852 I

Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological liealth T.E.R.R.A. Building 150 9th Avenue, N ,

Nashville, Tennessee 37203 NRC Resident Inspector Sequoyah Nuclear Plant

(- 2600 Igou Ferry Bnad Soddy Daisy, Tennessee 37379 >

Mr. B.'A. Wilson, Project Chief l-- U.S. Nuclear _ Regulatory Commission Region II 101_Marietta Street, NW, Suite 2900 --- - --

l-  ! Atlanta, Georgia 30323 i

6-4 & -irg ~ --

rm-tpm.%.eee imtyt=w+ pw4-- 9 -gvg. y p gez. ** me--- m-w- egm A-esw ' 4 Y Wa'