Forwards Rev 1 to Pump & Valve Inservice Testing Program Point Beach Nuclear Plant
ML20079B780
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/10/1991
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079B782 List:
References
CON-NRC-91-56 VPNPD-91-186, NUDOCS 9106170242
Download: ML20079B780 (5)


Text

.

Wisconsin ' .

Electnc POWER COMPANY n w M.cngan no ikw ?mo M%w w'A?oi lM4 ni N VPNPD-91 1,5 NRC-91-56 June 10, 1991 U.S. NUCLEAR REGULATORY COMMISSION 10 CFR 50.55a Document Control Desk Mail Station P1-137 Washington, D.C. 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 '

INSERVICE TESTING PROGRAM FOR PUMPS AFD VALVES POINT BEACH NUCLEAR PLAN'R, UNITS 1 AND 2 On December 21, 1990, we submitted a " Pump and Valve Inservice Testing Program" for the Point Beach Nuclear Pltnt, Units 1 and 2, for the third inspection interval. We recently approved and completed a number of technical and typographical corrections to the program description. For your information, we have enclosed a copy of the revised inservice testing prograu description. We have attached a summary of the changes made in this revision and have identified the changes in the document with margin bars.

If you have any questions, do not hesitate to contact us.

Very truly yours, YA LJ C.

w

. $ay Vice President Nuclear Power Copy to: NRC Regional Administrator, Region III (w/o/c)

NRC Resident Inspector (w/o/e) 3

'\

$WNESER ggggo Pk , ,,,3,g, ,py,,,,,, ,.,,m. y g,,,

TECHNICAL CHANGES bDREDd!E ,PE10 EEKLption/FicaEta i A 4 Add PRR 16 to remarks column; we do not use instruments which read out AP directly for pumps in the plant.

D 3 For ltems SLT-5, SLT-6, delete the reference to nW-3521. IWV-3521 is E 3 to do with the frequcocy of testing and is not appropriate as used.

D 5 For AF 106 & 107: Add CV-C, CS, CSJ.1. Leakage through these valves could result in a loss of inventory from AFW system. This function is within the scope of Section XI because of NRC position given during GL 8904 followup meeting. CSJ 1 is appropriate for these valves.

D 6 For AF-4002,4007,4014 E 6 For AF-4002

a. Change OR to CS and add CS) 31 to remarks. To get the valve to shut requires high feed flow to SG, during power operation this is a thermal stress on fewilines
b. For S '-C add VRR-28 and CST-31 to remarks column. ASME requires timing valve strokes, but these recirc valves will throttle in response to flow. Timing is not a periormance indicator in this case.

D 9 For HV-898A,900A,914A,916A - SLT-5 change frequency from OR to 2Y. The code required frequency for leak rate testing is two years.

D 10 For CV-304D, SLT 1 change frequency from RR to 2Y. ASME code required frequency is two years.

D 16 For CC-815 add PIT at 2Y for this valvo. Because it has a remote position indicator IWV-3300 is applicatWe.

6 17 For valves LW-63 & 64 change system designator prefix from CC to CCW. To match CHAMPS equipment ID.

D 26 For SW-2976 in remarks add M 2207 Sh.1. This valve is shown un two P&lDs.

1

Orammatic31fi ye.i Ch.tng Appendig fan Description /Reamn C 19 In alternate testing, totwwn 'suetion' and ' discharge" change 'an' to 'anJ.*

D 1 Ensure page numbers are correct.

D 5 For items AF 111 & 112 remarks column move CS'-3 to urond line locau.w that is where it applies.

D 6 For AF-il) in remarks column nove CSJ-3 to avond line. It only applies to CS fnquency.

D 7 For AF-4026 add unit designation t twfore P-29.

D 13 For CC-00738 add a *B' to valve number.

D 18 For SI-847A test requirement change CV 0 to CV-0.

D 21 & 22 For DA-3055A. B, C, D. E. and F, For D A40fEA B, C, D, E, F Change test requirement from SRV to RVT, an incorrect abbreviation was used.

D 22 For DA-6316A change test requirement from DT-O to BT-0.

D 32 For remarks column wherever NOTE appears, change it to Note; to tm consistent through the document.

D 33 For IA 6311 change number to IA46311 for consistency among identifiers.

D 35 For MS-2005 through 13 for test requirement change SRV to RVT, an incorrect abbreviation was used.

D 35 & 36 For MS 2017 and 2018 reverse the second and third lines of testing info to be consistent through tables.

D 35 For MS 2017C & D D 36 For MS 2018C & D Delete the last 'S' from valve number as it is not part of the equipment ID.

D 36 For MS 2018D for remarks, chango CSJ 18 to CSJ-17.

D 45 For S1434A&B change ID to match CHAMPS, add two zeros, SI-00834A&B.

D 47 For SI 861 A, frequency should be 10Y, not IJy.

D 49 For SI 00957 delete the comma after CSJ-30.

Page 1 l

Description /ReaEn Appendit hEt D 50,St.52 For title block add missing shoot number, It is Sheet 2.

D 51 For SI-866B for FIT change frequency from OR to 2Y.

D 54 For drawing No. M-209, without an T is correct.

D 58 For SW-322 for BT00, chango O to hyphon.

D 59 Change SW W2-62 to SW LW 62 D 61 SF-9A doloto one zero to ;nako number correct For SF-9A, in function, change CH to CK E 5 For AF-103 & 105, chango 1 A to 2A and 1B to 2B E 1 Ensure pa00 numbers are correct. Ensure they are correct on pages too.

E 8 For CV 3008 for BT-C, in remarks section, insert VRR 19.

E 16 For SI-8708 for BT-O & BT-C change frequency from OR to CS.

E 21 For Drawing No.: Insert Sheet 7.

E 22 For IA 1419 CSJ-38 should bo CSJ 28.

E 26 For MS-2019 & 2020 change position from S to C.

E 25 For MS-2005 through 13 for test requirement change SRV to RVT. An incorrect abbreviation was used.

E 25,26 For MS-2017 and 2018 reverso the second and third lines of testing info to be consistent through tables.

E 25 For MS-2017C&D E 26 For MS 2018C&D. Delete the last 'S' from vatve number as it is not part of the equipment ID.

E 26 For MS-2018D for remarks chango CSJ-18 to CSJ-17.

E 27 For RS-SA-10 change RDW to the word radwasto.

E 29 Delete H2-V44 and all associated testing. It was included twice.

E 32 For RC-515 & 516 to remarks add Note 4.

E 38 For SI.866A&B and BT-C, OR E 38 For SI-866B for PIT change frequency from OR to 2Y.

Page 2

gpfg Eggg Dewrintion/Remn E 39 For SI 8788 and D add a line BT-C, CS, CSJ-23 E 45 For SW 112A in function change Pp to PP.

E 48 For Wl.1003B the B should be A.

E 49 Drawing number is Sheet 1.

E 50 No. 4 capitalize S in specificatk>ns.

F 2 For VRR 2, componert hange IA through F to SI 00845A through F; correc*. components.

F 37 For c >mponent identifiers, change l's to l's.

Page 3