MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 ML20132E6211996-12-17017 December 1996 Proposed Tech Specs 3/4.7.3 Re Component Cooling Water Sys ML20132B5111996-12-10010 December 1996 Proposed Tech Specs Re Groundwater Level Exceeding Current Maximum Water Level ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML20134H0051996-11-0606 November 1996 Proposed Tech Specs,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20134F8781996-09-0404 September 1996 Proposed Tech Specs Requiring Exemption from Certain Requirements of 10CFR50.44, Stds for Combustible Gas Control Sys in Light Water Cooled Power Reactors & 10CFR50.46, Acceptance Criteria for Eccs.. ML20107L3951996-04-25025 April 1996 Proposed Tech Specs,Providing Suppl Info Re Clarification of TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101Q0871996-04-0808 April 1996 Proposed Tech Specs Re EDG Allowed Outage Times ML20101F7971996-03-21021 March 1996 Proposed Tech Specs,Clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguards Area Ventilation Sys ML20097C0171996-01-31031 January 1996 Proposed Tech Specs,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy Portions of SRs Required During Shutdown ML20097J4341996-01-30030 January 1996 Proposed Tech Specs,Modifying Table 3.2-1 of TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9871996-01-23023 January 1996 Proposed Tech Specs,Permitting Use of 10CFR50,App J,Option B performance-based Containment Lrt ML20094N7921995-11-20020 November 1995 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0191995-10-25025 October 1995 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5921995-10-17017 October 1995 Proposed TS 4.4.5.1,Table 4.4-1,reducing from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6161995-10-17017 October 1995 Proposed Tech Specs,Allowing Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4231995-09-19019 September 1995 Proposed Tech Specs,Increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J3051995-09-19019 September 1995 Proposed Tech Specs,Revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2481995-09-0101 September 1995 Proposed Tech Specs,Allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087A1171995-07-26026 July 1995 Proposed Tech Specs,Increasing Pressurizer Safety Valve Lift Setpoint Tolerance as Well as Reduce Pressurizer High Pressure Rt Setpoint & Allowable Value ML20087A1311995-07-26026 July 1995 Proposed Tech Specs,Clarifying TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20087G3471995-03-30030 March 1995 Proposed Tech Specs Re Changes That Allow One of Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operationin Order to Refurbish Isolated Svc Water Headers 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 1999-08-04
[Table view] |
Text
, , , , ,_ . _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ . - _ _ _ . . _ _
e e
4 6
4 ATTACIOiENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE - UNIT 1 e
8206080341 820604 PDR ADOCK 05000338 P ppg
ADMINISTRATIVE CONTROLS 6.13 ENVIRONMENTAL QUALIFICATION 6.13.1 By no later than the second refueling outage beginning after March 31, 1982 all safety-related electrical equipment in the facility shall be "
qualified in accordance with the provisions of: Division of Operating Reactora " Guidelines for Evaluating Environmental Qualification of Class 1E Electrical Equipment in Operating Reactors" (DOR Guidelines); or NUREG-0588,
" Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment". December 1979. Copies of these documents are attached to Order for Modification of License NPF-4 dated October 24, 1980.
6.13.2 By no later than December 1, 1980, complete and auditable records must be available and maintained at a central location which describe the environ-mental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the D0R Guide-lines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.
l
)
NORTil ANNA - UNIT 1 6-23 i .
.. ___m_ _ _ _ .
l l
ATTACHMENT 2 PROPOSED OPERATING LICENSE AMENDMENT - UNIT 2 l
s "By no later than December 1, 1980, complete and auditable
. (d) rcccrde must be available and maintained at a central location which describe the environmental qualification method used for all safety-related elec'trical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified to document complete compliance by June 30, 1982."
(c) "By no later than the second refueling outage beginning after March 31, 1982, all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions cf:
Division of Operating Reactors " Guidelines for Evaluating Environmental Qualifications of Class 1E Electrical Equipment in Operating Reactors" (DOR Guidelines): or NUREG-0588, " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," December 1979. Copies of these documents are attached to Order for Modification of License NPF-7 dated November 7, 1980.
(5) Prior to operating the facility at a power level above 25 percent, VEPC0 shall develop a surveillance program for fiberglass spray pond l piping and supports that is in compliance with the regulatory position !
in Revision 2 of Regulatory Guide 1.72, or an alternative position acceptable to the Commission.
(6) Prior to operating the facility at a power level above 90 percent, VEPCO shall perform secondary flow stability tests which have been approved by the Commission. VEPCO shall provide at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to Office of Inspection and Enforcement (OIE) prior to conducting such approved tests so that these tests may be witnessed by the Commission.
The exceptions to Technical Specifications 3.3.2.1(a), 3.3.2.1(b),
3.5.2, 3.7.1.2, and 3.7.1.3, issued with Amendment No. 2 to the Fuel-Load and Low-Power Testing License dated August 1980 shall be in effect until these are completed. -
(7) Prior to operating the facility at a power level above 90 percent, VEPCO shall demonstrate to the satisfaction of the NRC that the actual in-plant measurements of transformer tap settings are in agreement with their analysis.
(8) Prior to operating above 90 percent power, VEPCO shall complete the visual verification of operability of the 37 feedwater system hydraulic snubbers, designated in VEPCO's letter dated August 7, 1980, at operating temperature to the satisfaction of the OIE.
(9) VEPCO is authorized to perform steam generator moisture carryover studies at the North Anna Station. These studies involve the use of an aqueous tracer solution of two (2) curies of sodium-24. The licensee personnel will be in charge of conducting these studies and be knowledgeable in the procedures. VEPCO will impose personnel exposure limits, posting, and survey requirements in conformance with those in 10 CFR Part 20 to minimize personnel exposure and contamination during the studies. Radiological controls will be established in the areas of the chemical feed, feedwater, steam,
l l
ATTACHMENT 3 1 DISCUSSION OF PROPOSED CHANCES i
a L . , , . . .
a
DISCUSSION OF PROPOSED CHANGES North Anna Unit No. 1 Technical Specification 6.13 and North Anna Unit No. 2 License Condition 2.C(4)(e) currently read, "By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors, Guidelines for Evaluating Environmental Qualification of Class IE Electrical Equipment in Operating Reactors (DOR Guidelines); or NUREG-0588, Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment, December, 1979. Copies of these documents are attached to Order of Modification of License NPF-4 dated October 24, 1980 and NPF-7 dated November 7, 1980."
The proposed change is to provide environmental qualification of safety-related Class 1E electrical equipment no later than the second refueling outage beginning after March 31, 1982 for both North Anna Unit Nos.
I and 2. This proposed change is consistent with the deadline as promulgated by the NRC in a Federal Register Proposed Rule dated January 20, 1982.
The NRC Staff issued an SER for North Anna Power Station setting forth the results of its analysis on Vepco's submittals regarding the environmental qualification of Class 1E equipment. The SER listed several issues that were unsatisfactory in qualification documentation according to the NRC Staff.
These issues were related to DOR Guidelines and NUREG-0588 interpretations.
Despite the unsettled technical positions, the SER did not contain any items which needed immediate corrective action.
Vepco has been working to resolve the environmental qualification issues that were raised. Vepco is preceeding on an orderly schedule to provide adequa e documentation or replace equipment. The schedule is based upon realistic assessments of equipment availability, procurement times, and plant refueling I
cycles.
If the proposed change for North Anna Unit Nos. 1 and 2 is provided, Vepco will continue to pursue the resolution of the remaining outstanding items in the SER, thereby providing the NRC with the continuing assurance that progress on overall resolution of the environmental qualification matter is being made.
The continued operation of North Anna Unit Nos. I and 2, pending resolucion of the environmental qualification matter is justified based on Vepco's responses dated August 24, 1981 and September 4, 1981 to the Staff's Equipment Evaluation Reports dated May 20, 1981 and June 3, 1981 and upon the results reflected in the SER. The interim operation of North Anna Unit Nos. I and 2 will not endanger public health or decrease the margin of safety.