MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 ML20132E6211996-12-17017 December 1996 Proposed Tech Specs 3/4.7.3 Re Component Cooling Water Sys ML20132B5111996-12-10010 December 1996 Proposed Tech Specs Re Groundwater Level Exceeding Current Maximum Water Level ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML20134H0051996-11-0606 November 1996 Proposed Tech Specs,Modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20134F8781996-09-0404 September 1996 Proposed Tech Specs Requiring Exemption from Certain Requirements of 10CFR50.44, Stds for Combustible Gas Control Sys in Light Water Cooled Power Reactors & 10CFR50.46, Acceptance Criteria for Eccs.. ML20107L3951996-04-25025 April 1996 Proposed Tech Specs,Providing Suppl Info Re Clarification of TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101Q0871996-04-0808 April 1996 Proposed Tech Specs Re EDG Allowed Outage Times ML20101F7971996-03-21021 March 1996 Proposed Tech Specs,Clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguards Area Ventilation Sys ML20097C0171996-01-31031 January 1996 Proposed Tech Specs,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy Portions of SRs Required During Shutdown ML20097J4341996-01-30030 January 1996 Proposed Tech Specs,Modifying Table 3.2-1 of TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9871996-01-23023 January 1996 Proposed Tech Specs,Permitting Use of 10CFR50,App J,Option B performance-based Containment Lrt ML20094N7921995-11-20020 November 1995 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0191995-10-25025 October 1995 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5921995-10-17017 October 1995 Proposed TS 4.4.5.1,Table 4.4-1,reducing from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6161995-10-17017 October 1995 Proposed Tech Specs,Allowing Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4231995-09-19019 September 1995 Proposed Tech Specs,Increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J3051995-09-19019 September 1995 Proposed Tech Specs,Revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2481995-09-0101 September 1995 Proposed Tech Specs,Allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087A1171995-07-26026 July 1995 Proposed Tech Specs,Increasing Pressurizer Safety Valve Lift Setpoint Tolerance as Well as Reduce Pressurizer High Pressure Rt Setpoint & Allowable Value ML20087A1311995-07-26026 July 1995 Proposed Tech Specs,Clarifying TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20087G3471995-03-30030 March 1995 Proposed Tech Specs Re Changes That Allow One of Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operationin Order to Refurbish Isolated Svc Water Headers 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 1999-08-04
[Table view] |
Text
_
PLANT SYSTEMS' TURBINE OVERSPEED LIMITING CONDITION FOR OPERATION .
3.7.1.7 At least one turbine overspeed protection system shall be OPERABLE.
APPLICABILITY: MODE 1,2 and 3 ACTION:
With the above required turbine overspeed protection system inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> either restore the system to OPERABLE status or isolate the turbine from the steam supply.
SURVEILLANCE REQUIREMENTS 4.7.1.7.1 The provisions of Specification 4.0.4 are not applicable.
4.7.1.7.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:
- a. By cycling each of the following valves through one complete cycle of full travel and verifying movement of each of the valves through one complete cycle by direct observation:
- 1. Four Turbine Throttle valves at least once per 31 days,
- 2. Four Turbine Governor valves at least once per 31 days, *
- 3. Four Turbine Reheat Stop valves at least once per 18 months, and
- 4. Four Turbine Reheat Intercept valves at least once per 18 months.
- b. At least once per 18 months, by performance of CHANNEL CALIBRATION on the turbine overspeed protect.on instruments.
- c. At least once per 40 months **, by disassembly of at least one of each of the above l valves and performing a visual and surface inspecuon of all valve seats, disks and stems and verifying no unacceptable flaws or corrosion. If unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected unless the nature of the problem can be attributed to a service condition specific to that valve.
- : Testing of the turbine governor valves may be suspended during end-of-cycle power coastclown operation between 835 MWe and 386 MWe.
- For reheat stop and reheat intercept valves, the inspection cycle may be increased to a
- maximum of once per 60 months provided there is no indication of operationa' distress.
NORTH ANNA - UNIT I . 3/4 7-15 Amendment No. 4467 4M, 9509220130 950919 PDR: ADOCK 05000338
_ fR . .P_DR_ _
.... g i ;e -
- s. . . .
- PLANT SYSTEMS E
. 'DJRBINE OVERSPEED ;
l ' I IMITING CONDITION FOR OPERATION' 3.7.1.71 At least one turbine overspeed system shall be OPERABLE. [
4
. i APPLICABILITY: . MODE 1,2 and 3 j ACTION:
1 '
- With the above required turbine overspeed protection system inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> either ' l
' restore the system'to OPERABLE status or isolate the turbine from the steam supply, I
o!
' SURVEILLANCE REQUIREMENT j 4.7.1.7.1 The provisions of Specification 4.0.4 are not applicable. '
4.7.1.7.2 . The above required turbine overspeed protection system shall be demonstrated j OPERABLE:
a.- By cycling each of the following valves through one complete cycie of full travel ,
and verifying movement of each of the valves through one complete cycle by direct l observation:
- 1. Four Turbine Throttle valves at least once per 31 days, l
- 2. ' Four Turbine Governor valves at least once per 31 days,
- 3. Four Turbine Reheat Stop valves at least once per 18 months, and 4; Four Turbine Reheat Intercept valves at least once per 18 months. !
- b. ' At least once per 18 months, by performance of CHANNEL CALIBRATION f on the turbine overspeed protection instruments. f
- c. At least once per 40 months **. by disassembly of at least one of each of the above l valves and performing a visual and surface inspection of all valve seats, disks and stems and verifying no unacceptable flaws or corrosion. If unacceptable flaws or excessive corrosion are found. all other valves of that type shall be inspected unless the nature of the problem can be attributed to a service condition specific to that :
valve..
.'Testing of the turbine governor valves may be suspended during end-of-cycle power -
< ccastdown' operation between 835 MWe and 386 MWe.
- For reheat stop and reheat intercept valves, the inspection cycle may be increased to a
. maximum of once ps 60 months provided there is no indication of operational distress.
. NORTil ANNA - UNIT 2 3/4 7-12 Amendment No. 38,8!, !!9, . i
t .
r ATTACHMENT 3 :
SIGNIFICANT HAZARDS CONSIDERATION I
i i
! VIRGINIA ELECTRIC AND POWER COMPANY L
f
.. \
+
SIGNIFICANT HAZARDS CONSIDERATION The Technical Specifications surveillance requirements currently require testing and inspection of the Turbine Overspeed Protection System control valves to ensure their operability to prevent overspeeding of the turbine. The proposed change would increase the surveillance test interval for the turbine reheat stop and intercept valves to once per 18 months and extend the visual and surface inspection interval to 60 months. The proposed change would also remove the requirement to perform additional visual and surface inspections on the remaining turbine overspeed protection system control valves of that type when unacceptable flaws or excessive corrosion are identified which can be directly attributed to a service condition specific to the inspected valve.
The turbine control valves have been tested monthly with no failures attributable to valve or control system malfunctions. In addition, operational experience has shown that the valves have not failed to close in response to turbine trip demands nor experienced valve stem sticking while the units were carrying load.
Westinghouse Electric Corporation performed a probabilistic evaluation of the probability of generating turbine missiles as a direct function of the reduced testing frequency of the reheat stop and intercept valves. The evaluation focused on the two three overspeed events (e.g., design and intermediate overspeed) defined in WCAP-11525 that are affected by the test intervals of the reheat stop and intercept valves.
The third overspeed event (destructive overspeed) does not result from failures of these valves, therefore, it was not included in the evaluation. The North Anna turbines are also of the heavy hub design which reduces the probability that the turbine generated missiles from disk failure resulting from a destructive overspeed.
It was determined by the Westinghouse probabilistic evaluation that with an eighteen l month test interval for the reheat stop and intercept valves, the total turbine missile ejection probability for North Anna Units 1 and 2 meets the applicable turbine system i reliability acceptance criteria.
Virginia Electric and Power Company has reviewed the proposed Technical Specification changes against the requirements of 10 CFR 50.92 and has Cetermined that the proposed changes would not pose a significant hazards consideration.
Page 1 of 3
, _.+.
.v o
- Specifically, ' operation of the North Anna Power Station in' accordance with the proposed Technical Specifications changes will not:
i
.1. ' Involve a significant increase in the probability or consequences of an accident previously evaluated.
1 No new or unique accident precursors are introduced by these changes in l . surveillance requirements. The probability of turbine missile ejection with an extended 18-month test interval for the reheat stop and intercept valves has been :
. ' determined to be within the applicable acceptance criteria.
i i The heavy hub design of the turbine rotors provides further assurance that the
. probability of the ejection of destructive missiles remains minimal.
' Based upon the results of the probabilistic evaluation, the probability of a turbine
- generated missile is less than 10-5 per year which the Commission has endorsed .
as the acceptable level for turbine operation. ,
The reheat stop and intercept valve inspection interval extension .ad the elimination of the additional visual / surface inspections do not change the design, operation, or failure modes of the valves and other components in the turbine overspeed protection system.
Therefore, these changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
The demonstrated high reliability of the turbine reheat stop and intercept valves and the verification of the operability of the other turbine control valves provide adequate assurance that the turbine overspeed protection system will operate as designed, if needed. Turbine reheat stop and intercept valve testing performed to ,
date has demonstrated the reliability of these valves. In addition, the operability of the other turbine valves (i.e., turbine throttle valves and governor valves) will continue -to. be' verified every. 31 days or as required by. the Technical ,
Specifications.
Page 2 of 3
-_-.-.--________-_.--____N-__._--
f
- x. ,
,p
- 2. . Create the possibility of a'new or different kind'of accident from any accident previous evaluated.
. Since. the . implementation of the proposed change to the surveillance requirements will not require hardware modifications (i.e., alterations to plant configuration), operation of the facilities with these proposed ' Technical Specifications does'not create the possibility for any new or different kind of accident which has.not already been evaluated-in the Updated Final Safety
~
Analysis Report (UFSAR). In addition, the results of the probabilistic evaluation indicate that no additional transients have been introduced.
The proposed revision to the Technical Specifications will not result in any physical alteration to any plant system, nor would there be a change in the >
method by which any safety-related system performs its function. The design and operation of the turbine overspeed protection and turbine control systems are not being changed. ,
l The proposed Technical Specifications changes do not affect the design, operation, or failure modes of the valves and other components of the turbine overspeed protection system. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated. ,
- 3. Involve a significant reduction in a margin of safety.
l The proposed changes would not reduce the margin of safety as defined in the
, basis for any Technical Specifications. The design and operation of the turbine overspeed protection and turbine control systems are not being changed and the
- operability of the turbine reheat stop and intercept valves will be Jemonstrated on a refueling outage basis. In addition, the results of the accident analyses which
- are documented in the UFSAR continue to bound operation undec the proposed
. changes, so that there is no safety margin reduction. Therefore, tne proposed change does not involve a significant reduction in a margin of safety.
Page 3 of 3
. - . _ _ . . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _