Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 91-03,increasing Allowed Outage Time of 7 Days for Centrifugal Charging Pumps as Applied to TS for Reactivity Control & ECCS Requirements
ML20082M793
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/28/1991
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082M796 List:
References
NUDOCS 9109060017
Download: ML20082M793 (2)


Text

n , ,

), , -I  %

A

,.3 m.

! d [.$ k . i

n , .

August 28, 1991 TVA-SQN-TS-91-03 10 CFR 50.40 L

e U.S. Nuclear Regulatory Conrnission ATTN: Co: rent Control Desk Washington, D.C. '0555 Ge..t i emen :

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH N1' CLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 41-03 1

In accordance with 10 CFR 50.10, we are enclosing a requested amencment to Licenses nPT-77 and CPR-79 to enange the TSs of SQN Units 1 and 2.

The proposed change will previde an increaseC allowed outage time of 7 days for the centrifugal charging pumps as applied to TSs for reactivity control and emergency core cooling system requirements.

TVA regt.ests NRC review and approval of the proposed TS change. This change can te implemented without any physical modification and aniy minor procedure changes. Theretore, implementation can be achieved apen staff appraval of this request. However. TVA requests a 3 '? -d a y implementation period fram receipt of the approved change to place procedure revisions in effect and distribute the reviaed TS pages.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed deter:uinution of no significant hazards mnsideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. Supporting documentation to this proposed TS change provided by Westinghouse Electric Corporation is included in Enclosure 4 9109060017 910928 PDR ADOCK 05000327 /

P PDR p i

, e, 2

U.S. Nuc! ear Regulatory Commission August 28, 1991 Please direct questions concerning this i'asue to Keith C. Weller St (615) S43-7527.

Very truly yours, TENNESSEE VALLEY AUTHORITY y( $ /kb J L. Wilson Sworn to pnd subscribed before me this M8 ~ day of h p asT 1991

'D1o-/ d 4 71 A f Notary'Public My Commission Expires 8 'f 9.1 Enclosures cc (Enclosures):

American Nuclear Insurers hPC Resident Inspector Attontion: Librarian Sequoyah Nuclear Plant The Exchange, Suite 245 2600 Igou Ferry Road 270 Farmington Avenue Soddy Daisy Tennessee 37379 Farmington, Connecticut 06032 Mr. D. E. LaBarge, Project Manager Mr. B. A. Wilson, Project Chief U.S. Nuc! ear Regulatory Commission U.S. Nuclear Regulatory Connission One White Flint, North Region II 11555 Rockville Pike 101 Marietta Street, NW, Suite 2900 Rockville Marylant 20552 Atlanta, Georgia 30323 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health T.E.R.R.A. Building l 150 9th Avenue, N Nashville, Tennessee 37203 l