Application for Amend to License DPR-79.Amend Would Extend Response Time Surveillances During Cycle 7 Operation
ML20083Q824
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/19/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083Q828 List:
References
NUDOCS 9505260216
Download: ML20083Q824 (3)


Text

~

f*

e. a i

f

  • RA l Tennessee Valiey Autrwx4y Posi office Box 2000 Soddy-Daisy Tennessee 37379 May 19,1995 TVA-SON TS 95-13 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-328 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 9513," EXTENSION OF RESPONSE TIME SURVEILLANCE REQUIREMENTS FOR UNIT TWO CYCLE SEVEN" In accordance with 10 CFR 50.90, we are enclosing an amendment to License DPR-79 to change the TSs of SON Unit 2. The proposed change revises the License Condition 2.C.(17) to extend response time surveillances during the Unit 2 Cycle 7 operation. This extension will delay the performance to May 4,1996, for the 36-month surveillances required by TS Surveillance Requirement 4.3.2.1.3, but will not exceed the 25 percent allowable extension provided by TS 4.0.2 by more than four and one-half months.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

The response time surveillances that are proposed to be extended will begin to exceed the allowable extension provided by TS 4.0.2 on December 20,1995. TVA requests approval of the proposed revision before December 1995 to allow continued operation of Unit 2 until the Cycle 7 refueling outage currently scheduled for April 19,1996.

TVA requests a 30-day implementation period for this TS change following issuance.

9505260216 950519 PDR ADOCK 05000328 P PDR gbF ,

.. N .

U.S. Nuclear Regulatory Commission Page 2 May 19,1995 Please direct questions concerning this issue to Keith Weller at (615) 843 7527.

Sincerely, hoY R. H. Shell Manager SON Site Licensing Sworrgtg e and subsJrid before me

  1. a day of //(M is /7 1995 DJM / k. 1 JLl Not'afy'#ublic 7 0 .

My Commission Expires Mt 2/ /998 Enclosures cc: See page 3

~ -. - . _ ._ ,. - _ _ -

-, . . , - - --.m--...~-o

n . ..-

s ,

4 t

U.S. Nuclear Regulatory Commission Page 3

. May 19,1995 (Enclosures): ,

. Mr. D. E. LaBarge, Project Manager 2 Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health ,

3rd Floor ' I L & C Annex 401 Church Street  :

Nashville, Tennessee 372431532  ;

NRC Resident inspector -

Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379 3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 9

A i

r 8

?

.(_-

% _ _ . _ . . ._ _ . , _ -,