Application for Amends to Licenses DPR-77 & DPR-79,changing TS Re Heat Flux Hot Channel Factor Surveillance & COLR Rev
ML20087D304
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/07/1995
From: James Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087D307 List:
References
TVA-SQN-TS-95-1, NUDOCS 9508100268
Download: ML20087D304 (4)


Text

cal-Bl4 Tenne %ee Valley Aut"orey Post off<.e eox 2000. Soddy-Da'sy Tenressee 37379 August 7,1995 TVA-SON-TS-95-17 10 CFR 50.90 U.C. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS) 1 CHANGE 95-17," HEAT FLUX HOT CHANNEL FACTOR SURVEILLANCE AND CORE l OPERATING LIMITS REPORT (COLR) REVISION"  !

In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPP 77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change will relocate the heat flux hot channel factor, Fo(Z), penalty of two percent in Surveillance Requirement 4.2.2.2.e.1 to the COLR to allow for the burnup-dependent values of the penalty that are in excess of two percent. Additionally, the new methodology contained in Revision 1 A to Westinghouse Commercial Atomic Power - j 10216-P-A will replace that listed in TS 6.9.1.14.a.2. This revision was approved by NRC on November 26,1993. Note, a similar TS change was approved for Vogtle Electric Generating Plant on January 11,1995.

I The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no i significant safety hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

The Fa margin decreases have been implemented for Unit 2 and are listed in Table A.1 of the Unit 2 Cycle 7 COLR that was transmitted to NRC on September 23,1994.

The new Unit 1 Cycle 8 COLR will contain a similar table as previously transmitted for

(

Unit 2. These margin decreases may be implemented in advance of NRC approval of 6 the proposed TS change as they are conservative relative to the TSs. TVA requests a 45-ooy implementation period for this TS change following issuance, j l

l 9508100268 950807 0 PDR ADDCK 05000327 A\

p PDR \

u

5.

, .i 1

. 'U..S ' Nuclear Regulatory Commission Page 2 August 7,1995 Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely,

+~

J. D. Smith Acting Manager ,

SON Site Licensing vorn g and subscribAd before e th 7 day of / ///M 1995 I

/MJ $

Notaly'#ubli'c 1 /k1

/

My Commission Expires N .2 /

/

Enclosures cc: See page 3 I

s

'h y y , + , . - , . - - - , , , . . . , .-,

.. ,- . .n

,p ,

c U.S.' Nuclear Regulatory Commission Page 3

, August 7,1995

(Enclosures)

. Mr. D. E. LaBarge, Project Manager ~

Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Residen. - tector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

'.Q {. a'"

}:jy ,,

1 J

\

ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE SEQUOYAH NUCLEAR PLANT (SON) UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328  ;

(TVA-SON-TS-95-17) i LIST OF AFFECTEb PAGES Unit 1 1 3/4 2-7 6-21 Unit 2 3/4 2-6 6-22  ;