February 2002 Exam 50-369, 370/2002-301, Final RO Written Exam with Answers
ML020770367
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/15/2002
From:
NRC/RGN-II
To:
Duke Energy Corp
References
50-369/02-301, 50-370/02-301 50-369/02-301, 50-370/02-301
Download: ML020770367 (176)


See also: IR 05000369/2002301

Text

Final Submittal

(Blue Paper)

Reactor Operator Written Examination

MCGUIRE EXAM

50-369, 370/2002-301

FEBRUARY 11 - 15, 2002

NRC Official Use Only

Nuclear Regulatory Commission

Reactor Operator Licensing

Examination

McGuire Nuclear Station

ANSWER KEY

This document is removed from

Official Use Only category on

Date of examination

NRC Official Use Only

Question #1 McGuire Nuclear Station RO Exam

Bank Question: 037.1 Answer. A

I Pt(s) Unit 1 was conducting a reactor startup following a refueling outage. Given

the following conditions during the reactor startup:

"* N-31 indicates 2.1x10 4 cps

"* N-32 indicates 2.Ox 10' cps

"* N-35 indicates 5.5x10-" amps

"* N-36 indicates 1.0xl0 '0amps

  • Rods are in manual with no rod motion

"* SR and IR NIs are slowly increasing

"* T,, is holding steady

Which one of the following best explains the indications?

A. N-35 compensating voltage is set too high

B. N-35 compensating voltage is set too low

C. N-36 compensating voltage is set too high

D. N-36 compensating voltage is set too low


Distracter Analysis:

A. Correct: N-35 reads too low for the conditions given, compensating

voltage is too high.

B. Incorrect: N-35 reads too low.

Plausible: candidate reverses the effect of compensation.

C. Incorrect: overlap is proper for N-36

Plausible: If candidate does not know that P6 = lx 10-10 IR is about

2x104 CPS SR.

D. Incorrect: overlap is proper for N-36

Plausible: If candidate does not know that P6 = Ix10-10 IR is about

2x104 CPS SR.

Level: RO&SRO

KA: APE 033AK1.01(2.7/3.0)

Lesson Plan Objective: IC-ENB SEQ 7

Source: Mod Ques_037, Catawba NRC 1999

Level of Knowledge: analysis

References:

1. OP-MC-IC-ENB pages 25, 69, 79

Ques_037.1 For Official Use Only Page 1

Question #2 McGuire Nuclear Station RO Exam

Bank Question: 048 Answer. D

I Pt(s) Which one of the following selections correctly matches the reactor trip

signals to their limiting accident?

Reactor Trip Si2Inal Limitin2 Accident/Protection

A. OPAT DNB

OTAT Excessive fuel centerline temperature

Pzr High Level NC system integrity

Pzr Low Pressure DNB

B. OPAT Excessive fuel centerline temperature

OTAT DNB

Pzr High Level DNB

Pzr Low Pressure NC system integrity

C. OPAT DNB

OTAT Excessive fuel centerline temperature

Pzr High Level NC system integrity

Pzr Low Pressure DNB

D. OPAT Excessive fuel centerline temperature

OTAT DNB

Pzr High Level NC system integrity

Pzr Low Pressure DNB

Distracter Analysis:

A. Incorrect: OPAT and OTAT are reversed.

Plausible: PZR low pressure and high level are correct.

B. Incorrect: All are incorrect.

Plausible: Provided for psychometric balance.

C. Incorrect: OPAT and OTAT are reversed.

Plausible: PZR low pressure and high level arc correct.

D. Correct:

Level: RO&SRO

KA: SYS 012K5.01(3.3/3.8)

Lesson Plan Objective: IC-IPE SEQ 2

Source: Bank; Ques48e, McGuire NRC 1996

Level of knowledge: memory

For Official Use Only Page 2

Ques_048

Question #2 McGuire Nuclear Station RO Exam

References:

1. OP-MC-IC-IPE pages 19,45

Ques_048 For Official Use Only Page 3

Question #3 McGuire Nuclear Station RO Exam

Bank Question: 051.2 Answer: C

I Pt(s) Unit 1 is responding to a LOCA. The crew has entered ECA- 1.1, (Loss of

Emergency Coolant Recire). Given the following events and conditions:

  • 1A ND pump is tagged out
  • 1B ND stopped when INI-i 84B (lB ND PUMP SUCTFROM CONT

SUMP ISOL) could not be opened

  • Containment pressure is II psig
  • NCS pressure is 1200 psig
  • FWST level is 40 inches
  • Both NI pumps are off, but available
  • Both NV pumps are running

The crew has reached step 17, "Check if an NC pump should be started

At this point in the procedure, what pumps should be running?

REFERENCES PROVIDED: ECA 1.1 Steps 1-17

A. An NV pump only.

B. An NV pump and an NS pump only.

C. An NV pump, an NI pump and an NS pump only.

D. An NV pump, an NI pump and both NS pumps.

................................ ..------------------------------

Distracter Analysis:

One NS pumps is stopped at step IIb when according to the table, one NS

pump is required. One NV pump is stopped in subsequent steps. One NI

pump is started at step 15 e (pressure is less than 1600 psig)

A. Incorrect: insufficient - there will be I NV, I NI and 1 NS pump

running

Plausible: candidate believes both NS pumps are stopped and misses

the NI pump start

B. Incorrect: insufficient - there will be I NV, I NI and I NS pump

running

Plausible: candidate misses NI pump start

C. Correct: one train is aligned, one NV and NI required, one NS

pump due to containment pressure.

D. Incorrect: Only I NS pump will be running

Plausible: candidate misses step to stop NS pump

Level: RO Only

KA: WE II G2.1.7 (3.7/3.4)

Lesson Plan Objective: El SEQ 3, 6

Ques_051.2 For Official Use Only Page 4

Question #3 McGuire Nuclear Station RO Exam

Source: New

Level of knowledge: analysis

References:

1. OP-MC-EP-E1 page 225

2. ECA-l.1 pages 1-15, 43 - PROVIDED

Ques_051.2 For Official Use Only Page 5

Question #4 McGuire Nuclear Station RO Exam

Bank Question: 124 Answer: B

1 Pt(s) A team of workers must repack the seals on a pump in a 1500 mrem/hr high

radiation area.

Which one of the following work teams and estimated repair times would

maintain worker exposure ALARA?

A. 10 people working for 20 minutes

B. 6 people working for 30 minutes

C. 4 people working for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

D. 2 people working for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

.................................------------------------------------------------------...

Distracter Analysis:

A. Incorrect: six people can accomplish thejob with 4 1/2 Rem.

Plausible: Each individual would have the least exposure.

B. Correct:

C. Incorrect: six people can accomplish the job with 4 1/2 Rem.

Plausible: fewest individuals not exceeding the admin dose limit.

D. Incorrect: six people can accomplish the job with 4 1/2 Rem.

Plausible: Exposes the fewest individuals.

Level: RO&SRO

KA: G2.3.2 (2.5/2.9)

Lesson Plan Objective: RAD-RP SEQ 135

Source: Bank; Ques_ 124, Catawba NRC 2001

Level of knowledge: comprehension

References:

1. OP-MC-RAD-RP page 135

For Official Use Only Page 6

Ques_124

Question #5 McGuire Nuclear Station RO Exam

Bank Question: 137.1 Answer: A

1 Pt (s) Unit 2 refueling is in progress. Given the following plant alarms:

"* 2EMF-3 (Containment Refueling Bridge) trip 2 alarm.

"* 2EMF-39 (Containment Gas) trip 2 alarm.

"* 2EMF-40 (Containment Iodine) trip 2 alarm.

Which one of the following procedures should be implemented?

A. AP-25 (Spent Fuel Damage)

B. FR-Z.3 (Response to High ContainmentRadiation Level)

C. AP-40 (Loss of Refueling CanalLevel)

D. AP-18 (High Activity in Reactor Coolant)


Distracter Analysis:

A. Correct: Per the entry conditions indications are consistent with a

dropped and damaged fuel element.

B. Incorrect: Must implement AP-25.

Plausible: There is indication of high containment radiation level.

C. Incorrect: unless accompanied with failed fuel, gas/iodine monitors

should not go into alarm.

Plausible: for lowering cavity level, the bridge alarm would be in

alarm.

D. Incorrect: Must implement AP-25.

Plausible: the monitor alarms could be consistent with failed fuel at

power.

Level: RO&SRO

KA: SYS 034A2.01 (3.6/4.4)

Lesson Plan Objective: FH-FC SEQ 6

Source: Bank; Ques137a, McGuire NRC 1997

Level of knowledge: comprehension

References:

1. OP-MC-FH-FC pages 17 -19

Ques_137.1 For Official Use Only Page 7

Question #6 McGuire Nuclear Station RO Exam

Bank Question: 143.1 Answer. C

I Pt(s) On January 2 6 "h,you are directed to complete a valve lineup on Unit Iin

accordance with enclosure 4.10 to OP/I/A/6200/005, Spent Fuel Cooling

System. The controlled copy of the procedure has a restricted change noted

for valve IKF-145. This normally open valve has been locked open in

accordance with a special order that remains in effect until February I".

Which one of the following statements describes the correct action needed to

validate your working copy of the procedure'? (Your copy of the procedure is

in other respects identical to the controlled copy.)

A. Replace your working copy with an updated procedure printed

from the NEDL system.

B. Annotate the working copy with just the restricted change

number (as a cross reference) next to the IKF-145 line item, and

initial the change.

C. Annotate the working copy with a pen and ink change for the

valve position for IKF-145; change to "Locked Open", annotate

the restricted change number and initial the change.

D. Use the working copy as is since restricted changes of this nature

are not required to be written into working copies.

Distracter Analysis:

A. Incorrect: Cannot print because NEDL will not list this procedure as

issued.

Plausible: NEDL is an approved source of working copies for non

changed procedures.

B. Incorrect: Must write in the actual change language.

Plausible: The controlled copy is annotated with only the restricted

change #.

C. Correct:

D. Incorrect: Must write in the actual change language.

Plausible: It is not necessary to annotate working copies if the

change does not affect the job or no longer applies would be true

after FEB I"

Level: RO&SRO

KA: G2.1.21 (3.1/3.2)

Ques_143.1 For Official Use Only Page 8

Question #6 McGuire Nuclear Station RO Exam

Lesson Plan Objective: ADM-OP SEQ 8

Source: Mod; Ques_143, McGuire NRC 1997

Level of knowledge: memory

References:

1. OMP4-1 pages 11-12

Ques_143.1 For Official Use Only Page 9

Question #7 McGuire Nuclear Station RO Exam

Bank Question: 158 Answer: A

I Pt(s) What design features protect the turbine driven auxiliary feedwater (CA)

pump against minimum flow conditions and runout?

A. Minimum flow protection provided by recirc valves, runout

protection provided by max flow travel stops on discharge

control valves.

B. Minimum flow protection provided by recirc valves, runout

protection provided by flow restricting orifices in feedwater lines.

C. Minimum flow protection provided by governor control settings,

runout protection provided by max flow travel stops on

discharge control valves.

D. Minimum flow protection provided by governor control settings

runout protection provided by flow restricting orifices in

feedwater lines.

...................................-----------------------------------------------------. .

Distracter Analysis:

A. Correct answer

B. Incorrect: there are no flow restricting orifices

Plausible: partially correct - the recirc valves provide minimum flow

protection

C. Incorrect: minimum flow protection is not provided by the governor

control settings

Plausible: partially correct - runout protection is provided by the

discharge control valves

D. Incorrect: no flow restricting orifices - governor setting do not

provide protection against low flow

Plausible: provided for psychometric balance

Level: RO Only

KA: SYS 061 K5.03(2.6/2.9)

Lesson Plan Objective: CF-CA SEQ 5

Source: Bank; Ques_158, McGuire NRC 1997

Level of knowledge: memory

References:

Ques_158 For Official Use Only Page 10

Question #7 McGuire Nuclear Station RO Exam

1. OP-MC-CF-CA pages 29, 31

Ques_158 For Official Use Only Page 11

Question #8 McGuire Nuclear Station RO Exam

Bank Question: 164.1 Answer. C

I Pt(s) Unit I was operating at 100% when a ID S/G steam header break occurred.

The operators are responding in E-2 (FaultedSteam GeneratorIsolation).

The following sequence of events occurred:

"* Isolation of the ID S/G

"* PZR level dropped to 0% and was restored to 20%

"* NCS pressure is 1900 psig

"* Safety Injection has not been reset

What are the correct panel actions for the restoration of power to pressurizer

back-up heater bank D?

A. Reset safety injection on IMC-10

Select CLOSED on the heater breaker switch on IMC-5

B. Select CLOSED on the heater breaker switch on 1MC-5

Select ON for the heater control switch on I MC-10

C. Select MANUAL on the heater mode switch on IMC-10

Select CLOSED on the heater breaker switch on IMC-5

Select ON for the heater control switch on lMC-10

D. Reset safety injection on IMC-10

Select MANUAL on the heater mode switch on IMC-1I

Select CLOSED on the heater breaker switch on IMC-5

Select ON for the heater control switch on 1MC-11


Distracter Analysis:

A. Incorrect: insufficient action, wrong location for SI reset

Plausible: if the candidate is not familiar with the interlocks on the

PZR heater circuit. This is the action needed for Bank C.

B. Incorrect: must turn the heater mode switch to MANUAL.

Plausible: partially correct - all other actions are necessary

C. Correct answer: Bank D does not require SI reset

D. Incorrect: Not necessary to reset safety injection and wrong location

for SI reset and breaker closure.

Plausible: This is the right method for Banks A&B and the prior

version of the question.

Level: RO&SRO

KA: G2.1.31 (4.2/3.9)

For Official Use Only Page 12

Ques_164.1

Question #8 McGuire Nuclear Station RO Exam

Lesson Plan Objective: PS-IPE SEQ 10/11

Source: Mod; Ques_164, McGuire NRC 1997

Level of knowledge: comprehension

References:

1. OP-MC-PS-IPE page 23

2. EP/1/A/5000/ES- 1.1 page 19

Ques_164.1 For Official Use Only Page 13

Question #9 McGuire Nuclear Station RO Exam

Bank Question: 177 Answer: B

I Pt(s) Units I and 2 are at full power when a loss of offsite power occurs on Unit 2.

Which one of the following main turbine overspeed protective

devices/features will be the FIRST to actuate to prevent a turbine overspeed

condition?

A. At a speed of 103%, the turbine throttle valves will close.

B. GBX relay will close the governor and intercept valves.

C. At a speed of 110%, the governor and intercept valves will close.

D. GBX relay will close the turbine throttle valves.


Distracter Analysis:

A. Incorrect: The governor and intercept valves close.

Plausible: 103% is an overspeed setpoint.

B. Correct: GBX relay initiates when the switchyard breakers open.

The governor and intercept valves close.

C. Incorrect: Valves trip at 103%.

Plausible: 110% is an overspeed protection setpoint, and these

valves will close.

D. Incorrect: GBX relay does not close the throttle valves.

Plausible: GBX relay does actuate.

Level: RO&SRO

KA: SYS 045 A4.02 (2.7/2.6)

Lesson Plan Objective: MT-MT SEQ 3

Source: Mod; Ques_177, McGuire NRC 1997

Level of knowledge: memory

References:

1. OP-MC-MT-MT page 27, 29, 31, 39

For Official Use Only Page 14

Ques_177

Question #10 McGuire Nuclear Station RO Exam

Bank Question: 181 Answer: B

I Pt(s) Step 5d of FR-H. I (Response to Loss of Secondary Heat Sink) requires the

operators to check Pzr pressure less than 2335 psig after initiating emergency

boration flow to the reactor. If pressure exceeds 2335 psig, the contingency

action is to open a PORV and rapidly depressurize to 2135 psig. What is the

basis for this step'?

A. To maintain pressure below the PORV setpoint to prevent

cycling the PORVs.

B. To ensure that the boration flow rate is sufficient for emergency

boration.

C. To maintain positive control of NC pressure to prevent lifting a

code safety relief valve.

D. To reduce NC pressure to allow closing of NV pump recirc valves

to maximize emergency boration flow.

S..........................................................................................

Distracter Analysis:

A. Incorrect: This is the PORV setpoint.

Plausible: This would be a plausible action to prevent an automatic

actuation.

B. Correct answer

C. Incorrect: The purpose is to ensure adequate boron flow.

Plausible: This is the function of the PORVs.

D. Incorrect: The recirc valves could not be closed at 2135 psig.

Plausible: The purpose does involve enhancing boron flow.

Level: RO&SRO

KA: APE 024AK3.02(4.2/4.4)

Lesson Plan Objective: EP-FRS SEQ 4

Source: Bank; McGuire NRC 1997

Level of knowledge: memory

References:

1. OP-MC-EP-FRS page 27

2. EP/1/A/5000/FR-S. 1

Ques_181 For Official Use Only Page 15

Question #11 McGuire Nuclear Station RO Exam

Bank Question: 191.1 Answer: C

I Pt(s) Unit I was operating at 100% power when a total loss of feedwater occurred.

Following initiation of feed and bleed, the Operators reached step 34 of FR-H. I

(Response to Loss of Secondary Heat Sink) that requires feeding the S/Gs.

Given the following conditions:

Loop A Loop B Loop C Loop D

S/G (WR) [%] 18 9 10 13

NC T1 ,, [°F] 545 542 549 555

"* Core exit T/Cs are trending UP.

"* Containment pressure is 2.8 psig and increasing.

"* VI pressure is 120 psig.

Which one of the following statements correctly describes the initial

restrictions for restoring feedwater flow in FR-H. I when the IB CA pump has

been restarted'?

REFERENCES PROVIDED: EP/1/A/5OOO/FR-H. 1, Page 29 and Enclosure 10

A. Feedwater may be restored to IA S/G but limited to a feed rate

required to lower core exit T/Cs.

B. Feedwater may be restored to IC and ID S/G but must be

limited to a 100 GPM flow rate to each S/G.

C. Feedwater may be restored to ID S/G but must be limited to feed

rate required to lower core exit T/Cs.

D. Feedwater may be restored to 1A and ID S/Gs but limited to a

100 GPM flow rate to each S/G.


Distracter Analysis: There was a change in this procedure since the prior

question. The previous guidance was not to feed a S/G when T-hot >

550 'F and to select the B and C S/Gs for restoration of flow. Now

the guidance is to select the S/G that has the highest apparent level

and to preferentially select the B or C S/G.

A. Incorrect: IA S/G is limited to < 100 gpm feed rate because it is <

12% level and IB CA pump will not feed IA S/G.

Plausible: This would be partially correct be if level was <12%.

B. Incorrect: Must feed ID S/G at rate high enough to lower core exit

T/Cs. Limiting feed rate to 100 gpm will not prevent core damage.

Ques_191.1 For Official Use Only Page 16

Question #11 McGuire Nuclear Station RO Exam

Plausible: partially correct - feeding SG I B is preferable because it

provided steam for the TDCA pump.

C. Correct answer: feed the S/G's > 12% level (A&D) at whatever rate

is needed to turn the CET trend is the appropriate choice. But IB CA

pump cannot feed 1A S/G

D. Incorrect: The 100 gpm limit is not appropriate since CET's are

increasing and level is greater than 12%. The I A S/G cannot be fed.

Plausible: IA & ID S/Gs are the appropriate choice based on > 12%.

Level: RO&SRO

KA: SYS 061K3.02(4.2/4.4)

Lesson Plan Objective: EP-FRH SEQ 6

Source: Mod; Quesl91a, McGuire NRC 1997

Level of knowledge: comprehension

References:

1. OP-MC-EP-FRH page 77

2. EP/I/A/5000/FR-H.1 page 29 and Enclosure 10 - PROVIDED

For Official Use Only Page 17

Ques_191.1

Question #12 McGuire Nuclear Station RO Exam

Bank Question: 260.1 Answer. B

I Pt(s) Unit 2 is responding to a loss of main feedwater event from 100% power.

Given the following events and conditions:

"* The reactor has tripped

"* The 2A and 2B Motor-driven CA (MDCA) pumps started in auto

"* The Turbine-driven CA pump (TDCA) started in auto

"* CA suction pressure slowly drops to 4 psig

Which one of the following automatic system responses (if any) will occur at

this time?

A. 2A CA pump suction shifts to the RN system

  1. 2 TDCA pump suction shifts to the RN system

2B CA pump suction shifts to the RN system

B. 2A CA pump suction shifts to the RN system

  1. 2 TDCA pump suction remains aligned to the CA storage tank

2B CA pump suction remains aligned to the CA storage tank

C. 2A CA pump suction remains aligned to the CA storage tanks

  1. 2 TDCA pump suction shifts to the RN system

2B CA pump suction shifts to the RN system

D. 2A CA pump suction remains aligned to the CA storage tank

  1. 2 TDCA pump suction remains aligned to the CA storage tank

2B CA pump suction remains aligned to the CA storage tank


Distracter Analysis: Unit 2 A train valves RN-69A and CA-I5A opens at 4.5

psig and B train valves including the TDCA A train supply opens at 3.5 psig.

A. Incorrect: 2B CA and TDCA pumps do not shift suctions to the RN

system.

Plausible: if the candidate does not know the swap over setpoints

B. Correct Answer:

C. Incorrect: 2A CA pump shifts suctions to the RN system and TDCA

and 2B CA pumps do not shift

Plausible: if the candidate reverses the train relation of the unit

difference.

D. Incorrect: 2A CA pump shifts suctions to the RN system.

Plausible: if the candidate does not know the auto-swap setpoints.

This is the correct answer for Unit I

Level: RO&SRO

For Official Use Only Page 18

Ques_260.1

Question #12 McGuire Nuclear Station RO Exam

KA: GEN G2.2.4 (2.8/3.0)

Lesson Plan Objective: CF-CA SEQ 10

Source: Mod; Ques_260, Catawba NRC 1997

Level of knowledge: analysis

References:

1. OP-MC-CF-CA pages 21, 63

For Official Use Only Page 19

Ques_260.1

Question #13 McGuire Nuclear Station RO Exam

Bank Question: 321 Answer. A

I Pt(s) In E-3 (Steam GeneratorTube Rupture) Enclosure 5 (NC Pressureand

Makeup Control to Minimize Leakage) the operators are directed to energize

pressurizer heaters if the ruptured S/G level is decreasing and pressurizer

level is greater than 25%. What is the purpose for this action?

A. Maintain pressurizer saturation temperature corresponding to

ruptured S/G pressure to minimize S/G leakage into the NC

system.

B. Maintain pressurizer saturation temperature corresponding to

intact S/G pressure to minimize primary leakage into the S/G.

C. Maintain pressurizer saturation temperature above the

corresponding ruptured S/G pressure to ensure S/G water does

not flow into the NC system.

D. Maintain pressurizer saturation temperature corresponding to

intact S/G pressure to minimize NC pressure transients.

Distracter Analysis: The purpose of this question is to determine if the

candidate understands that thermal hydraulic equilibrium

(temp/press/leak rate) needs to be established between the NCS and

the ruptured S/G. No references are provided because the candidate

should be able to answer the question by simply comprehending the

pressures and reasons for this equilibrium.

A. Correct Answer:

B. Incorrect: required to maintain NCS pressure equal to ruptured S/G

pressure, not the intact S/G - Intact S/G pressure < ruptured S/G

pressure would not reduce NCS to S/G leakage

Plausible: if the candidate is confused over the thermal hydraulics

C. Incorrect: required to maintain NCS pressure equal to ruptured S/G

pressure

Plausible: partially correct do not want leakage from S/G to NCS

or NCS to S/G

D. Incorrect: required to maintain NCS pressure equal to ruptured S/G

pressure, not the intact S/G

Plausible: this would be a reasonable basis for monitoring intact S/G

pressure if that were the correct answer,

Level: RO&SRO

Ques_321 For Official Use Only Page 20

Question #13 McGuire Nuclear Station RO Exam

KA: EPE 038EK1.02(3.2/3.5)

Lesson Plan Objective: EP-EP3 SEQ 4

Source: Bank; Ques_321, Catawba NRC 1997

Level of knowledge: comprehension

References:

1. OP-MC-EP-EP3 pages 19, 101, 123

2. EP/1/A/5000/E-3 pages 44, 57

Ques_321 For Official Use Only Page 21

Question #14 McGuire Nuclear Station RO Exam

Bank Question: 328.3 Answer: A

I Pt(s) Unit 2 is shutdown in mode 5 on the midnight shift. The control room

operators consist of the following personnel:

"* The OSM

"* The Control Room SRO

"* The Unit I and Unit 2 ROs - who are also the OATCs

"* The Unit I BOP operator is currently securing a containment air release.

"* All other on-shift operators are out of the control room at the present

time.

An IAE Tech asks the Unit 2 RO to reset the trip 2 setpoint on 2EMF-36

(UNIT VENT GAS).

Which one of the following statements is correct in regard to the RO's ability

to comply with this request'?

A. The RO may perform this action because it is within the

surveillance area of the control room for shutdown operations.

B. The RO may perform this action if he/she temporarily turns over

the OATC position to the SRO.

C. The RO may not enter this area because it is outside the front

control board area.

D. The RO may not enter this area unless there is an emergency

condition.

......................................-------------------------------------------------

Distracter Analysis:

A. Correct answer - this is part of the shutdown surveillance area.

B. Incorrect: Can't turnover to SRO, and not necessary.

Plausible: if the candidate does not know the limits of the shutdown

surveillance area, and the SRO can act as an RO under some

circumstances.

C. Incorrect: Can leave the front area during shutdown periods.

Plausible: if the candidate does not know the limits of the shutdown

surveillance area.

D. Incorrect: not part of the emergency response area

Plausible: if the candidate does not know the limits of the shutdown

surveillance area. This was the answer to the prior version of the

question.

Ques_328.3 For Official Use Only Page 22

Question #14 McGuire Nuclear Station RO Exam

Level: RO Only

KA: ADM G 2.1.1 (3.7/3.8)

Lesson Plan Objective: ADM-OMP SEQ 2

Source: Mod; Ques_328.2, Catawba NRC 1997

Level of knowledge: memory

References:

1. OMP 2-2 pages 9-11, Attachment I

Ques_328.3 For Official Use Only Page 23

Question #15 McGuire Nuclear Station RO Exam

Bank Question: 331.1 Answer. B

I Pt(s) A technician is conducting a calibration procedure, which requires a series of

approximately 10 sequential steps to be performed while standing in a

contaminated area. He/she is in direct communications with an operator, the

communicator, who holds the procedure and reads each step sequentially.

If the performer does not have the procedure in hand as he/she performs the

steps, what are the requirements of OMP 4-1 (Use of Operatingand Periodic

Test Procedures)regarding the sign off for each step?

A. Only the performer can sign off the steps upon completion of the

task after leaving the contaminated area.

B. The communicator signs off each step as the step is completed

using his/her own initial and the initials of the performer.

C. The communicator signs off each step as the step is completed

using his/her own initials and the time.

D. The communicator checks off each step as the step is completed

along with the time. The performer initials each step following

completion of the task.

--- -


------------------------ - --- ----- --- ----------- -----

Distracter Analysis:

A. Incorrect: Both initials must be entered on each step.

Plausible: this is a logical albeit incorrect choice.

B. Correct:

C. Incorrect: Both initials must be entered on each step.

Plausible: this is a logical albeit incorrect choice.

D. Incorrect: Both initials must bc entered on each step.

Plausible: this is a logical albeit incorrect choice.

Level: RO&SRO

KA: ADM G 2.1.23(3.9 / 4.0)

Lesson Plan Objective: ADM-OP SEQ 13/14

Source: Bank; Ques_331, Catawba NRC 1997

Level of knowledge: memory

References:

For Official Use Only Page 24

Ques_331.1

Question #15 McGuire Nuclear Station RO Exam

1. OMP 4-1 page 15

For Official Use Only Page 25

Ques_331.1

Question #16 McGuire Nuclear Station RO Exam

Bank Question: 359.2 Answer. D

I Pt(s) Unit I is responding to a small break LOCA using E- I (Loss o/Reactor or

Secondaty Coolant). Given the following events and conditions:

"* FWST Level = 340 inches

"* Containment pressure = 1.5 psig

"* Containment Sump Level = 1.05 ft

"* EMF-41 (AUX BLDG VENTILATION) -trip 2

"* Aux Building area radiation monitors are in alarm

"* EMF-51AandB(CONTAINMENTTRNA & B)-25 R/Hr

"* Hydrogen Analyzer = 0.7% in containment

"* NLO's report significant leakage at the seals of the IA ND pump

Which one of the following procedures should the operator transition into

from E-l?

A. FR-Z.3 (Response to High Containment RadiationLevel)

B. ECA-1.I (Loss of Emergency Coolant Recirculation)

C. FR-Z.4 (Response to High Containment Hydrogen)

D. ECA-1.2 (LOCA Outside Containment)

-- -------------------------------- ------------------------

Distracter Analysis: The initial conditions provide a LOCA into

containment and a leakage path outside of containment. The question is

which of the problems take priority'? The purpose is not to memorize

procedure steps but to answer this from a broader perspective.

A. Incorrect: Cont RAD levels < 35 R/hr and this would be a

YELLOW path that does NOT require priority action.

Plausible: If the candidate thinks that the abnormal radiation level

requires priority action.

B. Incorrect: Still in injection phase of SI - have failed to isolate leak

outside containment.

Plausible: if candidate is not familiar with the entry conditions for

ECA 1.1 (after failure to isolate leak outside containment).

C. Incorrect: Cont H2 > 0.5 %, but this is a YELLOW path not

requiring priority action,

Plausible: If the candidate fails to recognize the leak in the auxiliary

bldg and/or the fact that E-l takes care of the cont H2 problem.

D. Correct:

Level: RO&SRO

For Official Use Only Page 26

Ques_359.2

Question #16 McGuire Nuclear Station RO Exam

KA: WE 04EK3.4 (3.6 / 3.8)

Lesson Plan Objective: EP-El SEQ 2

Source: Mod; Ques_359.1, Catawba NRC 1997

Level of knowledge: memory

References:

1. OP-MC-EP-E I page 45

2. EP/1/A/5000/E-1 pages 12-13

3. EP/1/A/5000/F-0 page 9

Ques_359.2 For Official Use Only Page 27

Question #17 McGuire Nuclear Station RO Exam

Bank Question: 370 Answer: B

I Pt(s) Unit 2 was operating at 100% power with pressurizer pressure channels in a

(1-2) lineup and NC pressure in the normal operating band when an

instrument failure occurred. Given the following plant conditions and

events:

"* INC-32B and INC-36B (PZR PORV) open causing NC pressure to

decrease

"* PORVs close at 2185 psig

"* Backup heaters energize and pressure increases

"* PORVs reopen at 2189 psig

"* A reactor trip does not occur

"* This cycle continues until operator action is taken

Assuming no operator action to realign (or swap) instrument channel lineups,

which one of the following events would cause these actions?

A. PZR pressure channel I fails high

B. PZR pressure channel 11 fails high

C. PZR pressure channel III fails high

D. PZR pressure channel IV fails high

-- -----------------------------------------------------------------

Distracter Analysis:

A. Incorrect: - channel I does not control PORVs 32 and 36

Plausible: - plant response is very similar except PORV 34 opens

and pressure continues to decrease below 2185 until a plant trip

occurs due to spray valves being full open

B. Correct answer - PZR channel III is the interlock channel to channel

II

C. Incorrect: - PORVs do not open - interlock channel only

Plausible: - if candidates do not recall that this is an interlock

channel or think that it controls the interlocked PORVs

D. Incorrect: - PORVs do not open - interlock channel only

Plausible: - if candidates do not recall that this is an interlock

channel or think that it controls the interlocked PORVs

Level: RO Only

KA: APE 027 AK3.03 (3.7/4.1)

For Official Use Only Page 28

Ques_370

Question #17 McGuire Nuclear Station RO Exam

Lesson Plan Objective: PS-IPE SEQ 12

Source: Bank; Ques 370, McGuire NRC 1999

Level of knowledge: comprehension

References:

1. OP-MC-PS-IPE page 35

For Official Use Only Page 29

Ques_37o

Question #18 McGuire Nuclear Station RO Exam

Bank Question: 380 Answer: D

I Pt(s) Which one of the following statements is a correct description of the

capabilities of EMF-48 (REACTOR COOLANT) at 100% power?

A. Detects corrosion product beta flux from the coolant in the A

loop of the NC system.

B. Detects fission product gamma flux from the coolant in the B

loop of the NC system.

C. Detects corrosion product beta flux from the coolant in the C

loop of the NC system.

D. Detects fission product gamma flux from the coolant in the D

loop of the NC system.


Distracter Analysis:

A. Incorrect: - EMF-48 does not detect beta radiation

Plausible: - If the candidate believes that the reason CRUD bursts is

detected by EMF-48 is the beta flux.

B. Incorrect: - EMF-48 does not sample the B loop.

Plausible: - if the candidate does not recognize that it samples A &

D loops.

C. Incorrect: - EMF-48 does not detect beta radiation, and loop C is not

a sample point.

Plausible: - If the candidate believes that the reason CRUD bursts are

detected by EMF-48 is the beta flux, and does not recognize that it

samples A & D loops.

D. Correct answer

Level: RO&SRO

KA: APE 076AA2.01(2.7/3.2)

Lesson Plan Objective: PSS-NM SEQ 2

Source: Bank; Ques 380 McGuire NRC 1999

Level of knowledge: memory

References:

1. OP-CN-PSS-NM pages 15, 21

For Official Use Only Page 30

Ques-380

Question #19 McGuire Nuclear Station RO Exam

Bank Question: 387 Answer: B

I Pt(s) Enclosure I to E- I (Loss of Reactor or Secondary Coolant) provides foldout

page actions to close INV-150B and lNV-151A (NVPUMPS

RECIRCULATION) when NC pressure is less than 1500 psig.

Which one of the following statements correctly describes the operator

response and reason for this response when pressurizer pressure is 1495 psig?

A. Notify the SRO of the need to close the valves to prevent NV

pump runout at low pressures.

B. Close the valves to prevent a reduction of full SI flow to the core.

C. Close the valves to prevent NV pump runout at low pressures.

D. Notify the SRO of the need to close the valves to prevent a

reduction of full SI flow to the core.

-........... ........ ........................---------------------------------........ ..

Distracter Analysis:

A. Incorrect: - pump runout is not a concern and the actions are

automatic.

Plausible: if the candidate does not know that foldout actions are

independent - pump runout can be a concern for situations where the

pump discharge pressure is very low.

B. Correct answer - maximizes flow into the core.

C. Incorrect: - pump runout is not a concern at this pressure.

Plausible: pump runout can be a concern for situations where the

pump discharge pressure is very low.

D. Incorrect: - the actions are automatic.

Plausible: - if the candidate does not know that foldout actions are

independent.

Level: RO&SRO

KA: EPE 011EK3.07 (3.5/3.6)

Lesson Plan Objective: EP-El SEQ 5

Source: Bank; Ques_387a, Catawba NRC 2001

Level of knowledge: memory

Rcferences:

For Official Use Only Page 31

Ques_387

Question #19 McGuire Nuclear Station RO Exam

1. OP-MC-EP-INTRO pages 33,35

2. OP-MC-EP-EI page 59

Ques_387 For Official Use Only Page 32

Question #20 McGuire Nuclear Station RO Exam

Bank Question: 398 Answer. B

I Pt(s) Unit 2 is in the process of starting up the reactor in accordance with all

controlling procedures. Given the following conditions and events: .

2 EMF-3 (CONTAINMENTREFUELING BRIDGE MONITOR) trip I setpoint is

7xlO' mR/hr and trip 2 setpoint is 1.5x 102 mR/hr.

0200 0205 0210 0215 2

2EMF 3 (mRlhr) 5x10' l.1x10 2 1.6x10 2 2.7x10

N-31 (CPS) 1.2x10 4 1.7xlO4 2x10 4 0

N-32 (CPS) 9.2x10 3 l.lx10 4 0 0

N-35 (amps) 9.1x1o l.OxlO 0 1.2100 1.210-'o

N-36 (amps) 9.3x10'- l.lx10l'1 1.3x10'-0 1.3xl01°"

If channel N-32 is deenergized due to a SR detector failure at 0210, what is the

earliest time (if any) that the containment evacuation alarm will actuate in Unit

2 during the startup?

A. 0205

B. 0210

C. 0215

D. The containment evacuation alarm will not actuate

...... .. ........................---------------------------------------------.-..........

Distracter Analysis:

A. Incorrect: - both SR high flux trips are active, but the EMF is still

below Trip 2.

Plausible: - if the candidate thinks that Trip I actuation causes the

alarm

B. Correct answer

C. Incorrect: Both SR high flux trips are blocked

Plausible: - if the candidate reverses the logic that BOTH SR high flux

trips must be blocked

D. Incorrect: - alarm actuates at 0210

Plausible: - if candidate thinks that some other action or interlock

blocks the alarm

Level: RO&SRO

KA: APE 061AA1.01(3.6/3.6)

Ques_398 For Official Use Only Page 33

Question #20 McGuire Nuclear Station RO Exam

Lesson Plan Objective: WE-EMF SEQ 3

Source: Mod; Ques_398, McGuire NRC 1999

Level of knowledge: analysis

References:

1. OP-MC-WE-EMF page 43

2. OP-MC-IC-ENB pages 21-23

Ques_398 For Official Use Only Page 34

Question #21 McGuire Nuclear Station RO Exam

Bank Question: 400 Answer: A

I Pt(s) Unit 2 is conducting a plant shutdown. The S/G's are being filled to wet lay

up. Given the following plant conditions and events:

"* 2D S/G pressure - 5 psig (all channels indicating the same)

"* 2D S/G NR level = 95%

"* 2D S/G WR level = 75%

"* No S/G PORVs are open

"* Operators are performing OP/2/A/6100/02 (ControllingProcedureJbr

Unit Shutdown) and SO-4D (FillingS/G 2D)

  • NCS temperature = 195°F

Which one of the following statements represents actual level conditions for

the 2D S/G under these conditions?

A. Approximately 75%

B. Approximately 85%

C. Approximately 95%

D. >100%


---------- - -- ------------


- ----------

Distracter Analysis: Narrow range SG level detectors are calibrated for

normal (hot) operating conditions. Wide range SG level detectors are

calibrated for cold (shutdown) conditions. This means that the narrow range

instrument will read higher than actual level under cold conditions because

variable leg water density is greater than the calibrated setting.

A. Correct answer: S04 procedures use only the WR level when

filling the S/Gs.

B. Incorrect: Actual level is about 75%

Plausible: - if the candidate is confused over which of the S/G level

instruments is cold calibrated and gets the effect reversed

C. Incorrect: - SG level is about 75 %

Plausible: - if the candidate is confused over which of the S/G level

instruments is cold calibrated.

D. Incorrect: - SG level is about 75 %

Plausible: If the candidate believes at low temperature, inaccuracy

has increased level indication.

Level: RO&SRO

KA: SYS 035A1.01(3.6/3.8)

For Official Use Only Page 35

Ques_400

Question .#21 McGuire Nuclear Station RO Exam

Lesson Plan Objective: STM-SG SEQ 5

Source: Mod; Ques_400, McGuire NRC 1999

Level of knowledge: analysis

References:

1. OP-MC-STM-SG pages 21, 23

2. OP/l/A/6100/SO-2D pages 6, 11

For Official Use Only Page 36

Ques_4OO

Question #22 McGuire Nuclear Station RO Exam

Bank Question: 407 Answer: D

I Pt(s) Unit I has initiated a liquid radioactive waste release from the Ventilation

Unit Condensate Drain Tank (VUCDT) through the RC system. All lineups

and authorizations have been properly made in accordance with

OP/0/B/6200/35 using the normal path. Two RC pumps are the minimum

required under the LWR document.

Given the following initial conditions:

  • 3 RC pumps are running
  • 1EMF-44 (CONT VENTDRN TANK OUT) correctly set for trip I and

trip 2 activity limits

  • MRIRR - 75 GPM based on boron concentration
  • No other releases are in progress

If the release automatically terminates 40 seconds after initiation, which one

of the following conditions could have terminated the release'?

A. IWWM-46 (LIQUID WASTE DISCH VALVE) closing

automatically if I RC pump tripped

B. IWM-46 closing automatically if IEMF-44 reached the trip 2

setpoint

C. I WP-35 (WMT & VUCDT TO RC CNTRL) closing automatically

if I RC pump tripped

D. IWP-35 closing automatically if IEMF-44 reached the trip 2

setpoint

............... .......... ....... ..-------------------------------

Distracter Analysis:

A. Incorrect: - RC pump interlock will not actuate - set at 2 pumps

(minimum required on LWR document). WM-46 is isolated and not

used anymore as a release path.

Plausible: - this was formerly the normal release path

B. Incorrect: - WM-46 receives a closing signal from EMF-44 but this

is not the normal path for a release. WM-46 is isolated and not used

anymore.

Plausible: - this was formerly the normal release path

C. Incorrect: - RC pump interlock will not actuate - set at 2 pumps

(minimum required on LWR document).

Plausible: - if the candidate misunderstands the RC pump interlock-

this was the correct answer on a prior NRC exam -

Ques_407 For Official Use Only Page 37

Question #22 McGuire Nuclear Station RO Exam

D. Correct answer

Level: RO & SRO

KA: SYS 68A4.03 (3.9/3.8)

Lesson Plan Objective: WE-WL SEQ 3

Source: Bank; McGuire NRC 1999

Level of knowledge: comprehension

References:

1. OP-MC-WE-WL pages 21,27, 59

2. OP-MC-WE-EMF page 31

For Official Use Only Page 38

Ques_4O7

Question #23 McGuire Nuclear Station RO Exam

Bank Question: 415.1 Answer. B

I Pt(s) Unit I is operating at 80% power when an electrical transient causes several

condensate system pumps to trip. Given the following conditions and events:

Start 10sec 20sec 30 sec

CF pump IA Suction Pressure (psig) 451 238 232 229

CF pump 1B Suction Pressure (psig) 448 227 224 240

  1. Hotwell Pumps running 2 2 3 2
  1. Condensate Booster Pumps running 2 1 0 2

What is the earliest time (if any) that BOTH main feedwater pumps will have

tripped'?

A. 10 seconds

B. 20 seconds

C. 30 seconds

D. At least one feedwater pump will continue to run


Distracter Analysis: This is the 1999 version of the question with slight

modifications. It was used in different versions in 2000 and

2001(Catawba).

A. Incorrect: - CF pump IA continues to run as suction pressure

remains > 230 psig

Plausible: - CF pump IB will trip on low suction pressure

B. Correct answer: - both CF pumps trip when 3/3 condensate booster

pumps trip - trip is irrespective of suction pressure

C. Incorrect: - CF pump l b trip criteria met but trip occurred earlier at

20 sec.

Plausible: - if candidate does not know that the CBPs are interlocked

with the CF pumps

D. Incorrect: - tripping criteria are met at 20 sec

Plausible: - if candidate does not know CF pump trips

Level: RO&SRO

KA: SYS 056KI.03 (2.6/2.6)

Lesson Plan Objective: CF SEQ 4

Source: Bank; Ques_415, McGuire NRC 2000

fls 41 5 1 For Official Use Only Page 39

Question #23 McGuire Nuclear Station RO Exam

Level of knowledge: analysis

References:

1. OP-MC-CF-CF page 19

For Official Use Only Page 40

Ques_415.1

Question #24 McGuire Nuclear Station RO Exam

Bank Question: 432.1 Answer: C

I Pt(s) Unit I has just entered mode 5 in preparation for refueling. Given the

following conditions and events:

"* A lower containment entry is planned for the next shift.

"* The SRO directs the RO to purge the containment in preparation for the

containment entry.

"* The VP system is secured with all fans off and containment purge and

exhaust valves closed

Which one of the following failures would severely compromise the

operator's ability to perform the containment purge'?

A. The NORMAL-REFUEL SELECTOR switch is stuck in the

"NORM" position.

B. Containment isolation valve IVP-4A (VP TO UPPER CONTINSD

ISOL) will not open.

C. Damper 1RBPS-D9 (VP to Lower Cont) is stuck in its "REFUEL"

(4 to 1) position.

D. Containment isolation valve 1VP-6B (VP to Lower Cont Otsd Isol)

will not open.

-- ---------------------------------------------------------

Distracter Analysis:

A. Incorrect: - this is the proper position for this operation.

Plausible: - if the candidate misunderstands the VP operations in

this mode - this was the correct answer in a prior version.

B. Incorrect: - any loss of flow to the upper containment will have no

effect on the lower containment entry.

Plausible: - if the candidate assumes there is an interlock that

precludes fan operation with an isolation valve closed.

C. Correct answer: - this will over-pressurize the upper containment

D. Incorrect: - should not significantly reduce purge flow to lower

containment due to a parallel path.

Plausible: - if the candidate presumes a loss of a flow path to lower

containment will reduce purge effectiveness or over-pressurize upper

containment.

Level: RO&SRO

KA: SYS 029K3,02(2.9*/3.5*)

For Official Use Only Page 41

Ques_432.1

Question #24 McGuire Nuclear Station RO Exam

Lesson Plan Objective: CNT-VP SEQ 2

Source: Mod; Ques_432, McGuire NRC 1999

Level of knowledge: comprehension

References:

1. OP-MC-CNT-VP pages 19, 21,23, 27

For Official Use Only Page 42

Ques_432.1

Question #25 McGuire Nuclear Station RO Exam

Bank Question: 453.1 Answer: A

I Pt(s) Unit I was operating at 70% power when a loss of condenser vacuum

occurred. Given the following events and conditions:

  • Reactor power, 48%.
  • Turbine load, 45% based on turbine impulse pressure.
  • Turbine exhaust hood temperature is 251 'F.
  • The operators are rapidly decreasing turbine load.
  • The operator reports that condenser vacuum is 24.2 inches vacuum

and is continuing to decrease slowly.

Which one of the following statements correctly describes the required

action(s)?

REFERENCES PROVIDED: AP-23 (Loss of Condenser Vacuum)

A. Manually trip the reactor and enter E-0 (Reactor Trip or Safety

Injection)

B. Manually trip the turbine in anticipation of reaching the trip

setpoint, and enter AP/2 (Turbine Generator Trip)

C. Continue to monitor condenser vacuum, if vacuum decreases to

20 inches vacuum, manually trip the turbine and enter AP/2.

D. Continue to monitor condenser vacuum, if vacuum decreases to

20 inches vacuum manually trip the reactor and enter E-0.


Distracter Analysis:

Turbine Trip Criteria: IF condenser vacuum decreases to less than 20 in Hg

or turbine exhaust hood temperature is greater than 250 'F, THEN: Trip the

reactor and enter E-0. This is a modified question from the last Catawba

Exam.

A. Correct:

B. Incorrect: Manually tripping the reactor is the only action provided

in AP/23.

Plausible: if the candidate recognizes that a reactor trip is not

automatic below 48% power, and forgets that the dumps will not

operate below C-9.

C. Incorrect Manually tripping the reactor is the only action provided

in AP/23.

For Official Use Only Page 43

Ques 453.1

Question #25 McGuire Nuclear Station RO Exam

Plausible: if the candidate recognizes that a reactor trip is not

automatic below 48% power, and forgets that the turbine trip on

exhaust hood temperature is 250 TF.

D. Incorrect: must immediately trip the reactor because of the exhaust

hood temperature trip.

Plausible: If the candidate does not recognize that the turbine'trip

on exhaust hood temperature is 250 TF

Level: RO&SRO

KA: APE 051 AA2.02 (3.9/4.1)

Lesson Plan Objective: AP-23 SEQ 1/2

Source: Mod; Ques_453a, Catawba NRC 2001

Level of knowledge: memory

References:

1. AP/1/5500/23 pages 2-4

2. OMP 2-2 pages 6-7

3. OMP 4-3 page 8

For Official Use Only Page 44

Ques 453.1

Question #26 McGuire Nuclear Station RO Exam

Bank Question: 460 Answer. B

I Pt(s) If a fire was reported in the McGuire Office Complex (MOC), which one of

the following responses is correct by station procedures?

A. Offsite fire departments are responsible for all fire suppression

activities at the scene. The Fire Brigade must be held in reserve

for station fires inside the protected area.

B. Offsite fire departments are responsible for all fire suppression

activities at the scene. The Fire Brigade may provide limited

support if resources allow.

C. The Fire Brigade is responsible for the initial response at the

scene. They are required to turn over control of the scene as

soon as an offsite fire department arrives and immediately return

to the protected area.

D. The Fire Brigade is responsible for fire suppression activities at

the scene. An offsite fire department may be called to provide

support if additional resources are required.

.................................-----------------------------------------------------..

Distracter Analysis:

A. Incorrect: - the Fire Brigade is allowed to leave the protected area.

Plausible: - they have restrictions regarding leaving the site.

B. Correct answer

C. Incorrect: - the Fire Brigade is not responsible for initial response

and they are not required to return to the protected area.

Plausible: - if the candidate thinks that they cannot remain outside

the protected area.

D. Incorrect: - The Fire Brigade is not primarily responsible to fight

fire outside the protected area.

Plausible: - If the candidate does not understand fire brigade

responsibilities.

Level: RO&SRO

KA: SYS 086 G2.4.12(3.4/3.9)

Lesson Plan Objective: None

Source: Bank; Ques_460, McGuire NRC 1999

Level of knowledge: memory

Ques_460 For Official Use Only Page 45

Question #26 McGuire Nuclear Station RO Exam

References:

1. RP/I/A/5700/025 Enclosure 4.1 page 5

For Official Use Only Page 46

Ques 460

Question #27 McGuire Nuclear Station RO Exam

Bank Question: 503.2 Answer. D

I Pt(s) Unit 2 was operating at 100% power. Given the following events and

conditions:

  • Turbine impulse pressure instrument channel I fails low.
  • The operators have performed the actions of AP-14 (Rod Control

Malfunctions).

  • T,,, has been adjusted to within ITF of program by adjusting turbine load

and power is 95%.

  • 10 minutes later, the RO misunderstands an order and places the rod

control selector switch in AUTO.

Which one of the following statements correctly describes the response of the

rod control system?

A. Rods will not move because all auto rod motion is still blocked.

B. Rods will move in because the power mismatch circuit still has an

error signal present.

C. Rods will not move because there is no demand signal calling for rod

motion.

D. Rods will move in because T.ve is greater than TreP


Distracter Analysis:

A. Incorrect: Auto rod motion will begin in an attempt to match Tave with

program Tref (557, zero power value)

Plausible: if the candidate believes auto motion is blocked and

remembers the turbine impulse mismatch circuit is no longer active.

B. Incorrect: The derivative of the Imp Press change has timed out.

Plausible: based on misunderstanding the derivative function of the

power mismatch circuit.

C. Incorrect: Tref is still low.

Plausible: if the candidate forgets the impulse signal locks in.

D. Correct: The temperature mismatch function has an error signal at this

time.

Level: RO Only

KA: SYS 001 K4.03 (3.5/3.8)

Source: Mod; Ques_503a, Catawba NRC 2001

Ques_503.2 For Official Use Only Page 47

Question #27 McGuire Nuclear Station RO Exam

Lesson Plan Objective: IC-IRX 11

Level of knowledge: analysis

References:

1. OP-MC-IC-IRX pages 39,41, 33

For Official Use Only Page 48

Ques_503.2

Question #28 McGuire Nuclear Station RO Exam

Bank Question: 540 Answer: B

I Pt(s) Unit 2 is responding to a large LOCA when a loss of the 2ETA bus occurred.

Given the following events and conditions:

"* A reactor trip and safety injection occurred

"* All NV, NI, ND, and CA pumps sequenced on properly

"* SI was reset

"* Sequencers were reset

"* The 2ETA bus subsequently lost power but was re-energized by the 2A D/G

Which one of the following statements correctly describes the restoration

process for the train A NV, NI, ND, and CA pumps?

A. 2A NV and NI pumps must be restarted by operator action

2A ND and CA pumps will automatically restart

B. 2A NV and CA pumps will automatically restart

2A NI and ND pumps must be restarted by operator action

C. 2A NV and NI pumps will automatically restart

2A ND and CA pumps must be restarted by operator action

D. 2A NV and CA pumps must be restarted by operator action

2A NI and ND pumps automatically restart


-------


Distracter Analysis:

Both the ECCS and blackout sequencers control NV and CA pumps. The

ECCS sequencer controls NI and ND pumps only

A. Incorrect: NI and ND pumps do not automatically restart, NV and

CA pumps will auto restart.

Plausible: If the candidate misunderstands the SI and SBO functions

of the components. NI pumps must be restarted and the CA pumps

will automatically restart.

B. Correct answer

C. Incorrect: NI and ND pumps do not automatically restart, NV and

CA pumps will auto restart.

Plausible: If the candidate misunderstands the SI and SBO functions

of the components. ND pumps must be restarted and the NV pumps

will automatically restart.

D. Incorrect: NI and ND pumps do not automatically restart, NV and

CA pumps will auto restart.

Plausible: Starting the ND and NI pumps automatically would be a

desired state for a large LOCA.

For Official Use Only Page 49

Ques_540

Question #28 McGuire Nuclear Station RO Exam

Level: RO&SRO

KA: SYS 013A2.01(4.6/4.8)

Lesson Plan Objective: DG-EQB SEQ 8

Source: Mod; Ques_540, Catawba NRC 1999

Level of knowledge: comprehension

References:

1. OP-MC-DG-EQB pages 29, 39, 41,43

For Official Use Only Page 50

Ques_540

Question #29 McGuire Nuclear Station RO Exam

Bank Question: 547 Answer. C

I Pt(s) Unit I was operating at 100% power when main condenser vacuum dropped

from 25 inches vacuum to 23 inches vacuum.

Which one of the following statements correctly describes the cause of this

problem?

A. Condenser water boxes are full

B. RC system flow has increased

C. CM flow to CSAE inter-cooler has been obstructed

D. Condensate depression has increased.


.-.-----.-----.-.-------------...............-------------------------------

Distracter Analysis:

A. Incorrect: Will not reduce condenser vacuum - full is a normal

condition for the water boxes.

Plausible: If the ZP water boxes are NOT full, air can accumulate in

the upper tubes and interfere with the heat transfer across the tubes

B. Incorrect: Increased RC flow will improve vacuum

Plausible: Decreased RC flow will degrade vacuum

C. Correct answer - reduces effectiveness of steam jets

D. Incorrect: - if condensate depression increases, the condensate

temperature becomes lower than saturation temperature for the

condenser pressure - vacuum would increase

Plausible: Condenser thermodynamic efficiency decreases

Level: RO&SRO

KA: SYS 055K3.01 (2.5 / 2.7)

Lesson Plan Objective: MT-ZM SEQ 4/9

Source: Bank; Ques_547, Catawba NRC 2001

Level of knowledge: comprehension

References:

1. OP-MC-MT-ZM pages 11 - 15,23,27

Ques_547 For Official Use Only Page 51

Question #30 McGuire Nuclear Station RO Exam

Bank Question: 548 Answer. A

I Pt(s) Unit I was operating in mode 3 during a plant shut down for a refueling

outage. If a safety injection signal is received, which one of the following

events will occur to protect the vital AC busses from overload?

A. Only non-LOCA loads will be shed. The accelerated sequence

will sequence remaining loads on after checking for adequate bus

voltage.

B. A complete load shed will occur. The accelerated sequence will

sequence LOCA loads on after checking for adequate bus voltage

and DG speed.

C. A complete load shed will occur. The accelerated sequence will

sequence LOCA loads on after checking for adequate bus

voltage.

D. Only non-LOCA loads will be shed. The accelerated sequence

will sequence remaining loads on after checking for adequate bus

voltage and DG speed.


Distracter Analysis:

A. Correct answer

B. Incorrect: only non-LOCA loads are shed, the accelerated sequence

does not check for DG speed during a LOCA

Plausible: DG speed is checked when the sequencer is actuated

during a blackout signal

C. Incorrect: only non-LOCA loads are shed

Plausible: the remaining part of the answer is correct

D. Incorrect: the accelerated sequence does not check for DG speed

during a LOCA

Plausible: DG speed is checked when the sequencer is actuated

during a blackout signal

Level: RO Only

KA: SYS 013K4.11(3.2/3.8)

Lesson Plan Objective: DG-EQB SEQ 6

Source: Bank; Ques_548, McGuire NRC 1999

For Official Use Only Page 52

Ques_548

Question #30 McGuire Nuclear Station RO Exam

Level of knowledge: memory

References:

1. OP-MC-DG-EQB page 25

Ques_548 For Official Use Only Page 53

Question #31 McGuire Nuclear Station RO Exam

Bank Question: 563.2 Answer. A

I Pt(s) Unit I was operating at 100%, all rods out. Given the following events and

conditions:

"* The RO is performing PT/1/A/4600/01 (RCCA Movement Test) for

control bank D

"* The RO selects CBD on the CRD Bank Selector Switch and drives rods

IN to 216 steps

"* An upset occurred and the RO selects MANUAL on the CRD Bank

Selector Switch and restores rods to 226 steps (ARO)

If this condition is left uncorrected, control bank C rods will begin to drive in

when control bank D is at I?

REFERENCES PROVIDED: COLR Table I

A. 100 steps

B. 106 steps

C. 110 steps

D. 120 steps


----- ---------------------------------

--- --------- ----

Distracter Analysis:

The Bank Overlap Unit (BOU) will not count the -10 steps on bank D when the

bank was inserted in "CBD" position. This means that bank D rods will be

sequenced 10 steps lower than normal on the BOU counter when bank C rods

begin their insertion sequence during the next shutdown. There are 116 steps of

overlap between control banks D and C. 226 steps is all rods out (ARO).

Bank C rods will begin to insert when bank D is at 226-116 - 10 = 100 steps.

A. Correct: 100 steps is correct: 226-116-10 = 100 steps.

B. Incorrect: 100 steps is correct

Plausible: If the candidate uses 116 steps as the bank overlap setting

instead of subtracting 226-116 - 110 as the point where bank C rods

begin to sequence in on a shutdown.

C. Incorrect: 100 steps is correct

Plausible: if the candidate does not recognize that the BOU counter

is effected by the individual withdrawal of bank D - or if he thinks

that the -10 steps in manual will offset the +10 steps in "Bank D

D. Incorrect: 102 steps is correct

Plausible: If the candidate reverses the overlap error - adds +10

steps to 110 instead of subtracting 10 steps.

For Official Use Only Page 54

Ques_563.2

Question #31 McGuire Nuclear Station RO Exam

Level: RO&SRO

KA: G2.2.33 (2.5/2.9)

Lesson Plan Objective: IC-IRE SEQ 5

Source: Mod; Ques563a; McGuire NRC 1999

Level of knowledge: comprehension

References:

1. OP-MC-IC-IRE page 13

2. COLR Table I - PROVIDED

COLR Enclosure 4.3 Section 1.13

For Official Use Only Page 55

Ques_563.2

Question #32 McGuire Nuclear Station RO Exam

Bank Question: 564 Answer: B

1 Pt(s) Match the following radiation exposure administrative guides with the

applicable annual limits for non-pregnant radiation workers.

Guides/Limits in TEDE (Rem)

Alert Exclude Basic Admin 10CFR20

A. 1.5 1.6 2.0 4.5

B. 1.6 1.8 2.0 5.0

C. 1.8 2.0 4.5 4.5

D. 2.0 3.6 4.5 5.0

. --.- . .. --- ..... ....


.... .... .. ..-------

Distracter Analysis:

A. Incorrect: Alert, Exclude and IOCFR20 all too low

Plausible: Basic Admin is correct

B. Correct answer

C. Incorrect: Exclude, Basic Admin are too high, IOCFR20 is too low

Plausible: Alert is correct

D. Incorrect: Alert, Exclude and Basic Admin are too high

Plausible: IOCFR20 is correct

Level: RO Only

KA: G2.3.1 (2.6/3.0)

Lesson Plan Objective: RAD-RP Seq 18, 19

Source: Bank Catawba NRC 1999

Level of knowledge: memory

References:

1. GET Radiation Worker Training pages 32, 34

Ques_564 For Official Use Only Page 56

McGuire Nuclear Station RO Exam

Question #33

Bank Question: 571 Answer: B

I Pt(s) Unit 2 is responding to a small break LOCA in ES- 1.2, (PostLOCA

Cooldown and Depressurization). Step 15 of ES- 1.2 requires the operators

to depressurize the NC system.

Which one of the following statements correctly describes the reasons for

using the prescribed methods of depressurizing the NC system?

A.

1. Pressurizer spray - preferred method to be used if NC pump

is running

2. Auxiliary Spray - alternate method - better control over

depressurization rate

3. PORV - method of last resort - lack of control of

depressurization rate - results in rupturing the PRT

B.

I. Pressurizer spray - preferred method to be used if NC pump

is running

2. PORV - alternate method - better than auxiliary spray

3. Auxiliary Spray - method of last resort - too slow and may

thermal shock the spray nozzles and degrade regenerative Hx

C.

1. PORV - preferred method - rapid depressurization rate

2. Pressurizer spray - alternative method - next most rapid

depressurization rate

3. Auxiliary spray - method of last resort - too slow and may

thermal shock the spray nozzles

D.

1. Auxiliary spray - preferred method - does not degrade

containment

2. Pressurizer spray - alternative method - will not work if NC

pump is not running

3. PORV - method of last resort - will rupture PRT and degrade

containment environment

-


Distracter Analysis:

A. Incorrect: PORV is the alternative method - aux spray is the last

resort

Plausible: Pressurizer spray is the priority

B. Correct answer

For Official Use Only Page 57

Ques_571

Question #33 McGuire Nuclear Station RO Exam

C. Incorrect: Pressurizer spray preferred over PORV

Plausible: Aux spray is last resort

D. Plausible: Aux spray is the last resort

Plausible: Pressurizer spray preferred over PORV

Level: RO&SRO

KA: WE 03EK2.1 (3.6 / 4.0)

Lesson Plan Objective: EP-E I SEQ 4

Source: Bank; Ques_571, Catawba NRC 1999

Level of knowledge: memory

References:

1. OP-MC-EP-E1 page 123

2. ES-1.2 page 12, 13

Ques_571 For Official Use Only Page 58

Question #34 McGuire Nuclear Station RO Exam

Bank Question: 593 Answer: B

I Pt(s) Unit 2 was operating at 99% power when a steamline break occurred. Given

the following events and conditions:

0200 The operators enter AP/0 1 (Steam Leak)

0200 The operators start reducing turbine load to match T,,, and T.,

0201 The operators start a second NV pump and isolate letdown

0202 NLOs start investigating for the location of the steam leak

0203 P/R OVER POWER ROD STOP alarms the RO reports that power

has turned.

0204 STA reports pressurizer level is decreasing and cannot be maintained

0205 The turbine building operator reports that the line to the atmospheric

dump valves has a steam leak and cannot be isolated

If no safety injection has occurred and pressurizer pressure is maintained,

which one of the following operator responses is correct'?

REFERENCES PROVIDED: AP-Ol

A. Manually trip the reactor at 0203

B. Manually trip the reactor at 0204

C. Manually trip the reactor at 0205

D. Commence a rapid down power using AP/04 (Rapid Downpower)

at 0205


----------

- --------------- ----

Distracter Analysis:

A. Incorrect: no requirement to trip the reactor because reactor power

has turned and is decreasing. Not approaching the overpower

automatic reactor trip at 109% in 2 of 4 channels.

Plausible: shows a power mismatch - reactor power reaches 103%

on I of 4 PR channels to cause C-2. OMP 4-3 (Use of Abnormal and

Emergency Procedures)requires the operator to trip when an

automatic safeguards action setpoint is approached to avoid

challenging the automatic safeguards function.

B. Correct answer required to trip under AP/0 I (and many other

procedures) if you cannot maintain pressurizer level with 2 NV

pumps

C. Incorrect: required to trip when PZR level cannot be maintained

Plausible: if the candidate thinks that a reactor trip is required

because the steam leak was not isolated.

For Official Use Only Page 59

Ques_593

Question #34 McGuire Nuclear Station RO Exam

D. Incorrect: required to trip when PZR level cannot be maintained

Plausible: this would be the correct answer if not required to trip at

0204.

Level: RO&SRO

KA: APE 040AA2.02(4.6/4.7)

Lesson Plan Objective: AP-l SEQ 4

Source: Bank; Ques 593, McGuire NRC 2000

Level of knowledge: comprehension

References:

1. AP/1/A/5500/0O page 3

2. OP-MC-IC-IPE page 45

3. OMP 4-3, page 8

Ques_593 For Official Use Only Page 60

Question #35 McGuire Nuclear Station RO Exam

Bank Question: 605 Answer: B

I Pt(s) Unit 2 was operating at 100% power, middle of core life. Given the

following events and conditions:

"* A reactor trip occurred due to a loss of both main feed pumps

"* The trip transient caused a 100 gpm tube leak in the 2B S/G

"* 2EMF-33 (CondenserAir Ejector Exhaust) alarmed in trip 2

Which one of the following indications will provide the best indication (most

sensitive and timely) to confirm that a S/G tube teak has occurred?

A. S/G feed flow to steam flow mismatch

B. 2EMF-1O, 11, 12 and 13 (STEAMLINE HIRAD)

C. 2EMF-34 (S/G SAMPLE)

D. 2EMF-71, 72, 73, and 74 (N16 LEAKAGE)


Distracter Analysis:

A. Incorrect: Not a sensitive method of comparison - requires large

gpm leak rates before this is noticeable.

Plausible: This method will show gross SGTRs - good indication at

power.

B. Correct answer: normally, EMF-71-74 are the most sensitive

monitors. But these monitors detect N'"y radiation that has a high

energy (7 MeV) y that only is generated when the reactor is operating

at power (requires a neutron flux).

C. Incorrect: The correct monitors are EMF 10 - 13.

Plausible: EMF-34 has no flow because the reactor trip would cause

an AFW auto-start - which would isolate blowdown and EMF-34

would not have any flow.

6

D. Incorrect: most sensitive method as it detects N' y radiation

Plausible: This was the correct answer for the 1997 NRC exam

when the premise of the question had the reactor was operating at

100% power. In this question, the reactor has tripped and neutron

flux has decreased - causing the N'6 y to decay off (T/2 is 7 seconds)

so that by the time that the steam line monitors see the contents of the

S/G, the N'" 7 has decayed away.

Level: RO Only

KA: SYS 039A 1.09(2.5*/2.7*)

For Official Use Only Page 61

Ques_6O5

Question #35 McGuire Nuclear Station RO Exam

Lesson Plan Objective: EP-E3 SEQ 3

Source: Bank; Ques_605, McGuire NRC 2000

Level of knowledge: comprehension

References:

1. OP-MC-WE-EMF pages 45,47

2. AP-10 page 7

3. OP-MC-EP-E3 page 43

For Official Use Only Page 62

Ques_605

Question #36 McGuire Nuclear Station RO Exam

Bank Question: 613 Answer: B

I Pt(s) Unit 2 was operating at 100% with normal charging and letdown in service.

Given the following indications:

  • Pressurizer level began decreasing
  • The 2A NV pump ammeter showed running amps decreased

If all automatic control systems operated normally, which one of the

following conditions would cause the 2A NV pump running amps to decrease

to the lowest value?

A. 2NV-238 (CHARGiNG LINE FLOW CONTROL) failed open

B. 2NV-238 (CHARGING LINE FLOW CONTROL) failed closed

C. 2NV-241 (SEAL INI FLOW CONTROL) failed open

D. 2NV-241 (SEAL INJ FLow CONTROL) failed closed

S-------------

Distracter Analysis:

A. Incorrect: pump amps and pressurizer level would initially increase

Plausible: If the candidate does not understand the charging flow path

or does not understand the relationship between pump amps and flow.

B. Correct answer: This would block the charging flow path and pumps

amps would reduce to minimum as the reduced charging flow was

diverted through the NV- 150 and NV- 151 mini-flow valves

C. Incorrect: this would increase charging flow, which would increase

charging pump amps. It would also increase pressurizer level, which

would cut back on charging flow and stabilize the pressurizer level.

Pump amps would not go to minimum value.

Plausible: If the candidate thought that this could divert charging

flow or did not understand the relationship between pump amps and

flow.

D. Incorrect: NV-241 closing would increase backpressure on the

charging system, which would divert more charging flow through the

NCP seals. However, the drop in pressurizer level would act to open

2NV-238 to compensate for the flow reduction. The overall effect

would be to increase pump amps as flow tried to remain the same but

at a higher backpressure.

Plausible: If the candidate does not consider the effect of the PZR

level control circuit.

Level: RO Only

For Official Use Only Page 63

Ques_613

Question #36 McGuire Nuclear Station RO Exam

KA: SYS 004K6.04(2.8/3. 1)

Lesson Plan Objective: PS-NV SEQ 5/6

Source: Bank; Ques_613, McGuire NRC 2000

Level of knowledge: comprehension

References:

1. OP-MC-PS-NV pages 37, 115

Ques_613 For Official Use Only Page 64

Question #37 McGuire Nuclear Station RO Exam

Bank Question: 649.1 Answer: D

I Pt(s) Unit 2 is operating at 100% power. Given the following events and

conditions:

  • CF pumps 2A and 2B are running
  • Hotwell pumps 2A and 2C are running
  • Condensate booster pumps 2A and 2C are running
  • Heater drain pump 2C1 is out of service
  • Heater drain pump 2C3 trips on overload

Assuming no operator actions are taken, which one of the following

statements correctly describes a plant response to this event?

A. Heater drain pump 2C2 starts.

B. CF pump 2A trips.

C. The reactor/turbine trips.

D. Condensate booster pump 2B starts.

---.---------------------------------...................-------------------------------

Distracter Analysis:

A. Incorrect: Heater drain pump 2C2 is already running.

Plausible: based on misunderstanding the normal 100% capacity of

the pumps (2 - 50% capacity).

B. Incorrect: CF pumps do not trip because a third CBP and HW pump

will start on low suction pressure to makeup the 15% loss in

condensate flow.

Plausible: If the candidate thinks that 2C-2 heater drain pump not

providing full heater drain flow would cause one CF pump to trip on

low suction pressure.

C. Incorrect: The reactor does not trip because condensate pumps can

produce 150% flow.

Plausible: If the candidate thinks that 2C-2 heater drain pump not

providing full heater drain flow would cause both CF pumps to trip

on low suction pressure.

D. Correct:

Level: RO&SRO

KA: SYS 056A2.04(2.6/2.8)

Lesson Plan Objective: CF-CM SEQ 12

For Official Use Only Page 65

Ques_649.1

McGuire Nuclear Station RO Exam

Question #37

Source: New; Parked Ques_649

Level of knowledge: comprehension

References:

1. OP-MC-CF-CM pages 33,37

For Official Use Only Page 66

Ques_649.1

Question #38 McGuire Nuclear Station RO Exam

Bank Question: 671.2 Answer: D

I Pt(s) Unit I was releasing the contents of a waste gas decay tank in accordance with

an approved release permit. If the detector power supply for IEMF-36(L)

(UNIT VENT GAS) failed during the release, which one of the following

actions must be taken?

REFERENCES PROVIDED: SLC 16.11.7

A. Stop the release and complete repairs on 1EMF-36(L) before

restarting.

B. Recalculate the trip set points using IENIF-36(H) as the release

path monitor.

C. Restart the release using 1EMF-50(L) (WASTE GAS DISCH) as

the release path monitor.

D. Continue the release using 1EMF-50(L) as the release path

monitor.


Distracter Analysis:

A. Incorrect: not required to use 1EMF-36(L) as the release path

monitor.

Plausible: if the candidate does not recognize that IEMF-50(L) is

normally used to monitor the release path.

B. Incorrect: lEMF-36(H) does not automatically trip IWG-160, and

cannot be used as a waste gas release path monitor

Plausible: if the candidate thinks that substituting the high range of

IEMF-50(L) is necessary and provides the same automatic

protection.

C. Incorrect: the release would NOT be terminated when IEMF-36(L)

failed low due to detector failure.

Plausible: if the candidate did not recognize that IEMF-36(L) fails

low on detector failure and would not trip IWG- 160.

D. Correct answer

Level: RO Only

KA: SYS 073A4.01(3.9/3.9)

Lesson Plan Objective: WE-RGR SEQ 4

Source: Mod; Ques_671 McGuire NRC 2000

Ques_671.2 For Official Use Only Page 67

Question #38 McGuire Nuclear Station RO Exam

Level of knowledge: memory

References:

1. OP-MC-WE-RGR page 15

2. OP-MC-WE-EMF pages 21,23, 37

3. SLC 16.11.7 - PROVIDED

Ques_671.2 For Official Use Only Page 68

Question #39 McGuire Nuclear Station RO Exam

Bank Question: 681 Answer: C

I Pt(s) Unit 2 was operating at 100% when a floor cooling glycol high temperature

alarm is received. A review of the RTD panel reveals that several ice

condenser floor slabs have high temperature indications.

Which one of the following statements correctly describes the operational

concern raised by this alarm?

A. High glycol temperatures will cause the in-service glycol

compressor to trip causing a loss of NF cooling and excessive ice

sublimation.

B. Low floor cooling glycol temperatures could cause cracks in the

ice condenser thermal barrier.

C. Slab freeze and thaw cycles could result in floor buckling that

could interfere with lower door operation.

D. Slab freeze and thaw cycles could cause gaps between the floor

and the intermediate deck doors resulting in a bypass flow path.

-- ------------------------------------------------------------------

Distracter Analysis:

A. Incorrect: none of the compressors trip on high glycol temperature

Plausible: if the candidate does not know the basis for the

temperature limits - low glycol temperature can cause a compressor

trip.

B. Incorrect: not the problem - glycol floor cooling does not effect the

thermal barrier.

Plausible: low temperatures can cause cracks in some systems due to

thermal stress

C. Correct Answer: this has been a problem as described in PIP 2

M97-2686 (July 1997)

D. Incorrect: the intermediate deck doors are not physically located

near the floor slab.

Plausible: if the candidate does not know the mechanism for floor

buckling.

Level: RO&SRO

KA: SYS 025A2.02(2.7/2.5)

Lesson Plan Objective: CNT-NF SEQ 15

Ques_681 For Official Use Only Page 69

Question #39 McGuire Nuclear Station RO Exam

Source: Bank; Ques_681, McGuire Audit 2000

Level of knowledge: memory

References:

1. OP-MC-CNT-NF pages 21, 37,41

For Official Use Only Page 70

Ques_681

Question #40 McGuire Nuclear Station RO Exam

Bank Question: 684 Answer: A

I Pt(s) Unit 2 suffered a spurious loss of offsite power while operating at full power.

Given the following events and conditions:

"* The control rods did not trip for three minutes.

"* Emergency boration increased NC boron concentration by 15 ppm.

"* Tave stabilized at 557 0 F following the trip.

"* Two NCPs have been restarted.

"* Containment radiation levels have doubled as indicated by:

"o 2EMF-2 (RXBLDG INCORE INST RM)

"o 2EMF-3 (Rx BLDG REFUEL BRDJ)

"o 2EMF-5 (NCFFLT.2A)

Which of the following correctly describes the primary cause of the increase

in containment radiation levels following the event'?

A. NCS activity has increased due to cycling of NCPs.

B. NCS activity has increased due to the boron concentration

change.

C. NCS activity has increased due to thermal shock.

D. NCS activity has increased due to a loss of letdown flow.


Distracter Analysis:

A. Correct: NCP cycling causes a crud burst.

B. Incorrect: Activity increases are primarily due to NCP cycling.

Plausible: based on the amount of boric acid, the NCS will not dilute

by enough to see any difference in activity. Also a larger pH change

can cause a crud burst - but this emergency boration will not cause a

significant pH change.

C. Incorrect: Activity increases are primarily due to NCP cycling.

Plausible: based on a larger thermal shock can cause a crud burst.

D. Incorrect: Activity increases are primarily due to NCP cycling.

Plausible: based on increased letdown is the action required to return

the activity to normal following a crud burst will result in increased

filtration - but not the predominant mechanism.

Level: RO&SRO

KA: WE 16EK3.1 (2.9/3.1)

For Official Use Only Page 71

Ques_684

Question #40 McGuire Nuclear Station RO Exam

Lesson Plan Objective: CH-PC SEQ 4

Source: Bank; McGuire Audit 2000

Level of knowledge: comprehension

References:

1. OP-MC-CH-PC pages 23-25

2. OP-MC-WE-EMF page 119

Ques_684 For Official Use Only Page 72

Question #41 McGuire Nuclear Station RO Exam

Bank Question: 697.1 Answer. B

I Pt(s) Unit 2 is operating at 100% power on 2/19. 2NI-59 (cold leg accumulator

check valve) begins to leak at 0200. Given the following accumulator

indications:

Time 0200 0300 0400 0500

Level (%) 13% 22% 32% 39%

Pressure (psig) 575 585 585 590

Boron (ppm) 2485 2480 2475 2470

Assuming no operator action, what is the latest time that operators can enter

Mode 3 and still comply with Tech Spec requirements?

REFERENCES PROVIDED:

Tech Spec 3.5.1

Unit I DataBook curve 7.4

Unit I Cycle 15 COLR -pages 23

A. Before 1100 on 2/19

B. Before 1200 on 2/19

C. Before 1100 on 2/22

D. Before 1200 on 2/22


----------------------------------------------

Distracter Analysis: Tech Spec values for CLA parameters are:

Volume Ž!6870 but *< 7342 gal exceeded at 0500

Pressure > 585 but * 639 psig - exceeded from 0200-0400

Boron concentration Ž> 2475 ppm exceeded at 0500

The accumulator exceeds the level limits at 0500 - so:

I hours to repair - by 0600 on 2/19

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to Mode 3 by 1200 on 2/19

A. Incorrect: can wait until 1200 on 2/19

Plausible: if the candidate misreads the cause of the problem this is

6 + Ihours from achieving the low level alarm setpoint or boron limit

at 0400.

B. Correct Answer:

C. Incorrect: must be in mode 3 at 1200 on 2/19.

Plausible: if the candidate misreads the Tech Spec and cause of the

problem - this is 72 + 6hours from achieving the boron limit at 0400.

D. Incorrect: must be in mode 3 at 1200 on 2/19.

Ques_697.1 For Official Use Only Page 73

Question #41 McGuire Nuclear Station RO Exam

Plausible: if the candidate misreads the Tech Spec and/or cause of

the problem - this is 72 + 6hours from exceeding the boron limit at

0400 and 72+6 hours from exceeding the level limit at 0500.

Level: RO Only

KA: SYS 016G2.1.25(2.8/3.1)

Lesson Plan Objective: ECC-CLA SEQ 7

Source: Mod; Ques_697, Catawba NRC 2000

Level of knowledge: comprehension

References:

1. OP-MC-ECC-CLA page 23

2. Tech Spec 3.5.1 - PROVIDED

3. Unit I Data Book Curve 7.4 - PROVIDED

4. Unit 1 Cycle 15 COLR - PROVIDED

Ques_697.1 For Official Use Only Page 74

Question #42 McGuire Nuclear Station RO Exam

Bank Question: 703.1 Answer: C

I Pt(s) While performing a valve lineup in the boric acid mixing room, an air line

failure caused a severe airborne beta contamination problem. A worker

received both internal and external contamination that was detected upon

exiting the RCA.

Which one of the exposures would exceed the IOCFR20 limit for the

worker's annual shallow dose equivalent (SDE) exposure'?

A. 55 Rem external dose to the lens of the eye.

B. 17 Rem internal dose equivalent to the lens of the eye.

C. 55 Rem external dose to the leg below the knee.

D. 17 Rem internal dose to the right forearm.


Distracter Analysis:

A. Incorrect: skin dose equivalent

Plausible: 50 Rem is correct limit for SDE may confuse with LDE

eye dose

B. Incorrect: SDE is an external skin or extremity dose not an internal

dose

Plausible: this is the correct LDE limit (lens of the eye).

C. Correct: 50 Rem SDE limit to the extremities (below forearm and

below knee) or skin.

D. Incorrect: SDE is an external dose not an internal dose

Plausible: the right forearm is the correct part of the anatomy for an

SDE - based on confusion of external/internal

Level: RO&SRO

KA: G2.3.4(2.5/3.1)

Lesson Plan Objective: RAD-RP SEQ 19

Source: Mod; Ques_703, McGuire NRC 2000

Level of knowledge: memory

References:

1. GET Training Manual pages 31-32

Ques_703.1 For Official Use Only Page 75

Question #43 McGuire Nuclear Station RO Exam

Bank Question: 710.1 Answer: B

I Pt(s) Unit I was in mode 6 preparing for refueling activities. Given the following

events and conditions:

"* Reactor head removal was in progress

"* NC system temperature is 109 'F.

"* Reactor water level is 80 inches above hot leg centerline.

"* Time after shutdown is 15 days.

"* The thermal margin indication on IMC-6 is not in service.

"* At step 4.c of AP/19 (Loss of ND) the SRO directs you to manually

determine the core thermal margin.

"* A loss of both trains of ND occurred

What is the correct time to core boiling?

REFERENCES PRO VIDED:

DatabookSection 2.10.1 and curves A-F including A(1)-F(1)

A. Less than 35 minutes

B. 35 to 45 minutes

C. 45.1 to 55 minutes

D. Greater than 55 minutes


-- ----------------------------

Distracter Analysis: The operators select curve 2.10. 1.8 from the Databook

and determine that there is 0.64 hours7.407407e-4 days <br />0.0178 hours <br />1.058201e-4 weeks <br />2.4352e-5 months <br /> = 38.4 minutes before the onset of core

boiling. This selection is made using the criterion in "Use of the Curves", in

section 2.10.1 - which requires the candidate NOT to interpolate - but rather

to use the closest higher temperature and the closest lowest water level to the

levels presented in the curves for conservatism.

A. Incorrect: the time to boiling is 39 minutes

Plausible: If the candidates select curve 2.10.l.A prior to core

offload, or 140 'F, they will get < 35 minutes

B. Correct Answer: select curve 2.10. 1.1 - lowest water level (60

inches) and highest temperature (120 'F)

C. Incorrect: the time to boiling is 37- 40 minutes

Plausible: if the candidate uses 100 'F (closest temp or lower temp)

temperature curve. Also if the candidate selects the curve for 84

inches of water in the core.

D. Incorrect: the time to boiling is 37-39 minutes

For Official Use Only Page 76

Ques_710.1

Question #43 McGuire Nuclear Station RO Exam

Plausible: if the candidate selects curve 2.10. .E (for 60 inches of

water in the core, after refueling) for any plausible temperature

selected.

Level: RO&SRO

KA: APE 025G2.1.7(3.7/4.4)

Lesson Plan Objective: None

Source: Mod, Ques_710, McGuire NRC 2000

Level of knowledge: analysis

References:

1. Databook Section 2.10.1, Curves A - F - PROVIDED

For Official Use Only Page 77

Ques_71o.1

Question #44 McGuire Nuclear Station RO Exam

Bank Question: 715.1 Answer. A

I Pt(s) Unit 2 was operating at 45% power. Given the following events and

conditions:

"* 2A NC pump trips

"* No operator action has been taken

"* All safety systems operate as designed

While the plant is still at power, which one of the following parameters will

initially DECREASE?

A. Steam generator 2A level.

B. Steam generator 2B hot leg temperature.

C. Steam generator 2A pressure.

D. Steam generator 2B feed flow.

Distracter Analysis: The reactor will not trip below P-8.

A. Correct: A S/G level will decrease as pressure increases due to

decreased steam flow

B. Incorrect: Thot will initially increase as heat removal increases

Plausible: candidate may decide that B loop will follow the overall

decrease in temperature of the A loop - or may think that the reactor

trips

C. Incorrect: pressure will increase as steam flow decreases

Plausible: candidate may reverse the effects - or may think that the

reactor trips.

D. Incorrect: Feed flow will increase as power drawn from this S/G

increases,

Plausible: candidate may reverse the effects - or may think that the

reactor trips.

Level: RO Only

KA: SYS 003 K3.02 (3.5/3.8)

Lesson Plan Objective: TA-AT SEQ 4/5/6

Source: Mod; Ques_715, Catawba NRC 2001

Level of knowledge: analysis

Ques_715.1 For Official Use Only Page 78

Question #44 McGuire Nuclear Station RO Exam

References:

1. OP-MC- TA-AT page 121

2. OP-MC-THF-FF pages 30-31

For Official Use Only Page 79

Ques_715.1

Question #45 McGuire Nuclear Station RO Exam

Bank Question: 748.1 Answer: A

1 Pt(s) The IB emergency diesel generator has been manually started and has been

idling for 15 minutes. The operator is preparing to parallel the diesel to the

grid.

In accordance with OP/I/A/6350/002 (Diesel Generator)Enclosure 4.2 (1B

D/G Startup) when manually loading the emergency diesel generator, the

operator should raise load to 1000 KW quickly after closing the D/G output

breaker while maintaining a lagging power factor.

Which one of the following statements correctly describes the basis for this

requirement?

A. Prevent motoring the DIG.

B. Prevent diesel overspeed if the breaker opens on reverse power.

C. Prevent turbocharger fire due to excess lube oil collection.

D. Prevent D/G breaker trip on generator differential.

-................................. ...----------------------------------........ .. .

Distracter Analysis:

A. Correct: leading pf and low load could lead to reverse power

condition motorizing the machine.

B. Incorrect: D/G breaker does not have reverse power protection.

Plausible: the D/G will pick up speed if suddenly unloaded

overspeed is a valid concern for heavily loaded D/G's.

C. Incorrect: This is the reason for slow D/G loading.

Plausible: This is a valid concern when a D/G has run at idle for a

long time.

D. Incorrect: An unbalance does not exist, Gen Diff should not occur.

Plausible: This is a valid D/G trip

Level: RO&SRO

KA: SYS 064A1.08(3.1/3.4)

Lesson Plan Objective: DG-DG SEQ 8

Source: Mod; Ques 748, Catawba NRC 2001

Level of knowledge: memory

Ques_748.1 For Official Use Only Page 80

Question #45 McGuire Nuclear Station RO Exam

References:

1.OP/I/A/6350/002 End 4.2 page 5

Ques_748.1 For Official Use Only Page 81

Question #46 McGuire Nuclear Station RO Exam

Bank Question: 767.1 Answer. D

I Pt(s) Unit I is responding to a small-break loss of coolant accident inside

containment. Given the following events and conditions:

"* Operators have implemented E-0 (Reactor Trip or Safety Injection), and

E- I (Loss of Reactoror Secondary Coolant) through step 11.

"* Bus I ETA is de-energized.

"* The IB NI pump has failed.

"* The IB Hydrogen recombiner is out of service.

"* Containment hydrogen concentration is 7%.

"* The TSC has recommended purging containment to reduce hydrogen

concentration to 3.5% before energizing the igniters.

Which one of the following statements correctly describes the method for

performing this evolution to control the off-site dose'?

A. Containment air is exhausted to the auxiliary building where it is

filtered prior to release to the unit vent stack.

B. Containment air is exhausted through the containment air

release system where it is filtered prior to release to the unit vent

stack.

C. Containment air is exhausted through the incore instrument

ventilation system where it is filtered prior to release to the unit

vent stack.

D. Containment air is exhausted to the annulus where it is filtered

prior to release to the unit vent stack.

... .. .. ... .. .. ... .. .. ... .. .. ... .

.. ..-----------------------------

Distracter Analysis:

A. Incorrect: Air is released to the annulus area.

Plausible: This could be a way to filter the release if the air was

vented to the auxiliary building.

B. Incorrect: Air is released to the annulus area.

Plausible: If the candidate confuses the VQ and VE systems.

C. Incorrect: The air is released to the vent stack.

Plausible: If the candidate does not remember that VE releases to the

stack to maintain negative pressure in the annulus.

D. Correct:

Level: RO&SRO

For Official Use Only Page 82

Ques_767.1

Question #46 McGuire Nuclear Station RO Exam

KA: SYS 028K6.01(2.6/3.1)

Lesson Plan Objective: VE SEQ II

Source: Mod; Ques_767, Catawba NRC 2001

Level of knowledge: comprehension

References:

1. OP-MC-CNT-VE pages 11, 19, 31

Ques_767. i For Official Use Only Page 83

Question #47 McGuire Nuclear Station RO Exam

Bank Question: 771.1 Answer. D

I Pt(s) Unit 1 is operating at full power and Unit 2 is refueling. Unit I is releasing a

minimally decayed waste gas decay tank when a significant packing leak starts

on isolation valve 1WG-160, (WG Decay Tank Outlet to Unit Vent Cbntrol).

Which one of the following statements correctly describes the automatic actions

required to assure that the leak is contained and filtered?

A. IEEMF-50 (WASTE GAsDISCHHI RAD) automatically closes IWG-160,

and IEMF-41 (AUXBLDG VENTHIRAD) automatically stops the

auxiliary building ventilation unfiltered exhaust fans.

B. 1EMF-41 automatically stops the auxiliary building ventilation

unfiltered exhaust fans, and IEMF-36 (UNIT VENTHIRAD)

automatically closes IWG-160.

C. IEMF-36 automatically closes IWG-160, and IEMF-35 (UNIT

VENTPARTHIRAD) automatically aligns the auxiliary building

ventilation filter trains.

D. 1EMF-35 automatically stops the auxiliary building ventilation

unfiltered exhaust fans, and 1EMF-41 automatically aligns the

auxiliary building ventilation filter trains.

Distracter Analysis:

A. Incorrect: EMF-50 will not get to Trip 2 because it is set for the

activity being released, and EMF-41 does not automatically stop

these fans.

Plausible: These are valid automatic actions for EMF monitors.

B. Incorrect: EMF-41 does not automatically stop these fans.

Plausible: if the candidates do not recognize that this is not an

automatic action for EMF-41 but for 35/37.

C. Incorrect: EMF-35 does not realign ventilation filters.

Plausible: partially correct EEMF 36-will close IWG-160.

D. Correct answer: EMF-35 will secure VA fans, and EMF-41 will

realign filter trains to contain and filter the release in the Aux Bldg.

Level: RO&SRO

KA: SYS 071K1.06(3.1*/3.1)

Lesson Plan Objective: WE-EMF SEQ 2,3

Ques_771.1 For Official Use Only Page 84

Question #47 McGuire Nuclear Station RO Exam

Source: Mod; Ques 771, Catawba NRC 2001

Level of knowledge: comprehension

References:

1.OP-MC-PSS-VA pages 29, 45

2. OP-MC-WE-EMF pages 21 - 27

Ques_771.1 For Official Use Only Page 85

Question #48 McGuire Nuclear Station RO Exam

Bank Question: 776 Answer. C

I Pt(s) Unit I was operating at 100% when a LOCA with loss of offsite power

occurs. One diesel generator fails to start. The operators are entering E-l

(Loss of Reactor or Secondary Coolant).

Given the following critical safety function status indications:

"* Core Cooling ORANGE

"* Subcriticality - GREEN

"* Containment RED

"* Inventory - GREEN

"* Heat Sink - RED

"* Integrity - GREEN

Which one of the following describes the highest priority problem, and the

appropriate operator action?

A. Core cooling; Transition to FR-C.2, (Response to Degraded Core

Cooling).

B. Core cooling; Transition to FR-C.1, (Response to Inadequate Core

Cooling).

C. Heat Sink; Transition to FR-H.1, (Response to Loss of Secondary

Heat Sink).

D. Containment; Transition to FR-Z.I, (Response to High

Containment Pressure).

S-------------------------------------------------------------------------------------

Distracter Analysis:

A. Incorrect: heat sink is the highest priority RED

Plausible: if the candidate picks the first item requiring transition

from E-1.

B. Incorrect: heat sink is the highest priority RED

Plausible: if the candidate picks the first RED condition and does not

recognize that the wrong procedure is listed.

C. Correct:

D. Incorrect: heat sink is the highest priority RED

Plausible: if the candidate picks the first RED condition.

Level: RO Only

KA: WE 05 EA 2.2 (3.7/4.3)

For Official Use Only Page 86

Ques_776

Question #48 McGuire Nuclear Station RO Exam

Lesson Plan Objective: EP-FO SEQ 2, 3

Source: Bank; Ques_776, Catawba NRC 2001

Level of knowledge: memory

References:

1. OP-MC-EP-FO pages 13, 15

2. OMP 4-3 pages 15-16

Ques_776 For Official Use Only Page 87

Question #49 McGuire Nuclear Station RO Exam

Bank Question: 837.1 Answer: C

I Pt(s) Unit I is shutdown in mode 5 on 2/6/02. Given the following events and

conditions:

"* Both ND loops are in service.

"* PZR level is >95%.

"* NC system pressure is 300 psig,

"* NC Temperature is 165 0F.

"* Wide range loop D Tho, failed high at 0200 on 2/5 and has not been

returned to service.

Which one of the following statements correctly describes the required

operator action on 2/6 as a result of the TI(, failure'?

REFERENCES PROVIDED: Tech Spec 3.4-12

A. 1ND-3 (ND pump suction relief valve) must be operable and

IND-IB (1C LooP TO ND PUMPS ]SOL) must be open because

1NC-36B (PZR POR 1P)is disarmed.

B. 1ND-3 must be operable and IND-IB and IND-2AC (ICNC

Loop TO ND PUMPSCONTINSIDE ISOL) must be open because

INC-36B is disarmed.

C. IND-3 must be operable and IND-1B and IND-2AC must be

open because INC-34A (PZR POR1) is disarmed.

D. IND-3 must be operable and IND-2AC must be open because

INC-34A is disarmed.


Distracter Analysis:

A. Incorrect: INC-34A is disarmed; need IND-2AC open.

Plausible: if the candidate confuses which temperature inputs to

which PORV and does not recognize the series isolation valves.

B. Incorrect: INC-34A is disarmed.

Plausible: If the candidate confuses which temperature inputs to

which PORV. The valve alignment is correct.

C. Correct: temperature greater than 300 degrees disarms the PORV

making INC-34A inoperable. With the NCS solid, TS 3.4.12

requires one ND suction relief aligned and operable and NC

temperature >167 F within I hour.

D. Incorrect: IND-IB must be open.

Plausible: The inoperable PORV is correct.

Ques_837.1 For Official Use Only Page 88

Question #49 McGuire Nuclear Station RO Exam

Level: RO&SRO

KA: SYS 005A2.02(3.5/3.7)

Lesson Plan Objective: PS-ND SEQ 6, IPE SEQ 11, 13

Source: Mod; Ques 837, Catawba Audit 2001

Level of knowledge: comprehension

References:

1. OP-MC-PS-IPE page 27, 29, 53

2. Tech Spec 3.4-12 - PROVIDED

3. OP-MC-PS-ND page 67

Ques_837.1 For Official Use Only Page 89

Question #50 McGuire Nuclear Station RO Exam

Bank Question: 857 Answer. D

I Pt(s) Unit I is operating at 65% power with pressurizer level on program, and

normal charging and letdown flow through a 75 gpm orifice. Given the

following events and conditions:

"* INV-245B (CHARGING LINE CONT OUTSIDE ISOL) spuriously closes

"* Flashing in the letdown line reduces letdown flow to 5 gpm

"* The operators take no actions

How long before the pressurizer high level alarm actuates'?

REFERENCES PROVIDED: Unit I Databook Curve 7.38

A. Less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

B. 2 to 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

C. 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

D. Greater than 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

Distracter Analysis:

Charging flow is reduced to the minimum value - goes to 32 gpm to the NCP

seals. 12 gpm seal flow goes to the VCT.

PZR level starts at 44.5% (.65 * (55%-25%) +25% - 44.5%).

PZR level increases to the high level alarm at 70%.

The reduction in charging flow into the NCS causes charging flow to reduce

to minimum (32 gpm) as the PZR fills up. NCP Seal flow continues (12

gpm). Letdown flow drops to 5 gpm because of high regen HX outlet

temperature (flashing at the orifices). Net charging flow drops to +15 gpm

(32 12-5)

Per tank curve: 70%=9800 gal, 44.5%-6500 gal, 17%=2800 gal.

3300gal (9800-6500) / (15gpm) = 220 minutes = 3.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br />

A. Incorrect: There are more than 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Plausible: If candidate neglects to subtract seal flow and letdown flow

3300 gal / 32 gpm = 103 minutes - 1.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> or misreads tank

curves / miscalculates pressurizer level

B. Incorrect: There are more than 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Plausible: If the candidate includes the loss of letdown but neglects

seal return flow: 3300 gal/(32-5) gpm = 122 min - 2.03 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. - or

misreads tank curves / miscalculates pressurizer level

C. Incorrect: There are more than 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

For Official Use Only Page 90

Ques_857

Question #50 McGuire Nuclear Station RO Exam

Plausible: Assuming loss of letdown, if the candidate does not include

seal return flow: 3300gal / (32 - 12) gpm = 165 min - 2.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> - or

misreads tank curves / miscalculates pressurizer level

D. Correct answer: 3.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br />

Level: RO&SRO

KA: APE 022AA2.04(2.9/3.8)

Lesson Plan Objective: PS-NV SEQ 6

Source: New

Level of knowledge: analysis

References:

1. OP-MC-PS-NV pages 17, 39

2. OP-MC-PS-ILE page 35

3. Unit I Databook Curve 7.38 - PROVIDED

Ques_857 For Official Use Only Page 91

Question #51 McGuire Nuclear Station RO Exam

Bank Question: 858 Answer: B

I Pt(s) Unit I was operating at 100%. Given the following events and conditions:

"* The following fans were in operation:

  • S/G booster fans
  • Return air fans
  • Lower containment fans
  • Incore instrument area fans

"* A main steam line break occurred inside containment

"* All systems functioned as designed

Which one of the following containment cooling systems will stop

operating?

A. S/G Booster Fans.

B. Return Air Fans.

C. Lower Containment Fans.

D. Incore Instrument Area Fans.

. ------ .. ..-...... S-.-----. -

. ............---------.--------------------------

Distracter Analysis:

A. Incorrect: These fans will continue to operate since no LOOP.

Plausible: These fans lose power during a LOOP.

B. CorrectBCcHn:

C. Incorrect: These fans automatically restart on S'.

Plausible: If the candidate confuses with the upper fans, which lose

power.

D. Incorrect: These fans automatically restart on S'.

Plausible: these fans are not required by TS to be operable.

Level: RO&SRO

KA: SYS 022G2.4.22(3.0/4.0)

Lesson Plan Objective: CNT-VUL SEQ 5

Source: New

Level of knowledge: memory

References:

For Official Use Only Page 92

Ques_858

Question #51 McGuire Nuclear Station RO Exam

1. OP-MC-CNT-VUL page 39,41

Ques_858 For Official Use Only Page 93

Question #52 McGuire Nuclear Station RO Exam

Bank Question: 859.1 Answer: A

I Pt(s) Unit 2 is in mode 6 with refueling activities in progress. Given the following

events and conditions:

  • A containment purge is in progress

a A fuel element was rammed into the side of the reactor vessel

PARTICULATE) are in trip 2 condition

Which one of the following actions should occur, assuming that operators

follow the required procedure steps?

A. The containment evacuation alarm sounds automatically.

The containment purge stops automatically.

B. The containment evacuation alarm is actuated by the control room.

The containment purge stops automatically.

C. The containment evacuation alarm sounds automatically.

The containment purge is stopped manually.

D. The containment evacuation alarm is actuated by the control room.

The containment purged is stopped manually.


Distracter Analysis:

A. Correct: Containment purge will stop and containment alarm will

actuate when the EMF goes into trip2.

B. Incorrect: a plant page is made by the control room.

Plausible: If the candidate confuses the plant page with the containment

evacuation.

C. Incorrect: containment purge stops automatically

Plausible: candidate knows the alarm, but fails to realize purge will stop

automatically.

D. Incorrect: both occur automatically

Plausible: candidate does not know the auto actions for the EMF

Level: RO&SRO

KA: SYS 103 A2.04 (3.5/3.6)

Lesson Plan Objective: WE-EMF SEQ 3

Source: New

Ques_859.1 For Official Use Only Page 94

Question #52 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MC-WE-EMF pages 43, 105

2. OP-MC-CNT-VP page 21

3.AP/2/A/5500/25 page 2-3

4. GET RAD Worker Training Manual page 124

Ques_859.1 For Official Use Only Page 95

Question #53 McGuire Nuclear Station RO Exam

Bank Question: 860 Answer: D

I Pt(s) Unit I has experienced four CRUD bursts this month. Given the following

events and conditions:

S1lEMF-18 (REACTOR COOLANTFILTER 1A) reads 5 times its normal value.

  • IA mixed bed demineralizer is in service.
  • Local radiation readings near reactor coolant filter IB are 3 times normal.

If the detector for IEMF-19 (REACTOR COOLANTFiLTER iB) fails, what actions

(if any) are the operators required to take in response to these conditions?

A. Switch mixed bed demineralizers.

B. Shift back to 1A reactor coolant filter until I EMF-19 is returned

to service.

C. Place both mixed bed demineralizers in service until 1EMF-19 is

returned to service.

D. No action is required.


Distracter Analysis:

A. Incorrect: No action is required.

Plausible: If the candidate believes that the filters and demineralizers

are train related.

B. Incorrect: No action is required.

Plausible: If the candidate thought that procedures called for using a

filter with an operable RAD monitor.

C. Incorrect: No action is required. EMF-48 indicates no crud burst

Plausible: This action would be required if another crud burst were to

occur.

D. Correct answer

Level: RO&SRO

KA: SYS 072A2.02(2.8/2.9)

Lesson Plan Objective: None

Ques_860 For Official Use Only Page 96

Question #53 McGuire Nuclear Station RO Exam

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-WE-EMF pages 43, 45

2. OP/I/A/6100/01OS window D4

Ques_860 For Official Use Only Page 97

Question #54 McGuire Nuclear Station RO Exam

Bank Question: 861 Answer. D

I Pt(s) Unit 2 is responding to a large LOCA with 10 % failed fuel. Given the

following events and conditions:

"* 2ETA is faulted.

"* 2NI-184B (1B ND PuMP SucTiONFRoM CONTSuMPISOL) would not open

during FWST swapover

"* 2NI-184B breaker has tripped and will not reset

SI EMF-10 (AUxBLDG CoR/EL 750) and 2EMF-9 (AuXBLDG COR/EL 767)

read > 10E4 mR/hr.

"* The TSC is not yet manned.

"* RP projects that expected dose rates in the area of the 2N1-184B will be very

high, possibly exceeding 150 Rem/hr.

"* The OSM has determined that manual alignment of 2N1-184B is required

for lifesaving protection of the general public inside the 10 mile EPZ (public

health and safety).

Which of the following exposure limits would apply to a worker who

volunteered to manually open 2NI-184B?

A. Do not exceed 5 Rem TEDE.

B. Do not exceed 10 Rem TEDE.

C. Do not exceed 25 Rem TEDE.

D. The worker(s) may exceed 25 Rem TEDE.



Distracter Analysis:

A. Incorrect: The operator is allowed to exceed 25 Rem TEDE.

Plausible: This is the maximum allowable TEDE for non-emergency

conditions.

B. Incorrect: The operator is allowed to exceed 25 Rem TEDE.

Plausible: This is the maximum allowable annual TEDE for equipment

protection during accident conditions.

C. Incorrect: The operator is allowed to exceed 25 Rem TEDE.

Plausible: This is the maximum allowable annual TEDE for life saving

or public safety on a non-volunteer basis.

D. Correct: greater than 25 Rem is allowed on a volunteer basis for

protection of the public health and safety.

Level: RO&SRO

For Official Use Only Page 98

Ques_861

Question #54 McGuire Nuclear Station RO Exam

KA: SYS 006G2.3.4(2.5/3.1)

Lesson Plan Objective: EP-EMP SEQ 5; TA-AM SEQ 30

Source: New

Level of knowledge: memory

References:

1. OP-MC-EP-EMP page 31

2. OP-MC-TA-AM page 67

4. GET RAD Worker Training Manual page 32

Ques_861 For Official Use Only Page 99

Question #55 McGuire Nuclear Station RO Exam

Bank Question: 862 Answer: B

I Pt(s) Unit I is responding to a LOCA from a trip at full power. Given the

following events and conditions:

"* A safety injection occurred at 0200.

"* Bus IETB is faulted.

"* The IA NS pump started automatically

"* The I A NS pump was stopped by CPCS signal at 0235.

"* The Ss signal and sequencer have been reset

"* The train A Sp signal has not been reset

  • INS-29A (A NS PuMPDIScHCONTOUTSIDE ISOL) and 32A (A NS PUMP

DIScH OUTSIDE ASOL) failed to operate (mechanically stuck)

"* Containment pressure reached 5 psig at 0305

"* FWST level reaches 33 in. at 0306.

Which one of the following operator actions is required to address the

containment pressure problem?

REFERENCES PROVIDED: ES-I.3

A. Immediately open INS-43A (CONTOUTSIDEISOL) to supply spray

from the ND pumps.

B. After switchover to cold leg recirculation, close INI-173A (TR A

ND ToA & B CL) and open INS-43A to supply spray from the

ND pumps.

C. 50 minutes after switchover to cold leg recirculation, open INS-43A

to supply spray from the ND pumps.

D. 50 minutes after switchover to cold leg recirculation, close 1NI-173A

and open 1NS-43A to supply spray from the ND pumps.

... ... .. ..... ... ..... ....... ... ..------------------------------------

Distracter Analysis:

A. Incorrect: Must close INI-173A after switchover.

Plausible: If the candidate does not recognize the effect on the ND

system.

B. Correct:

C. Incorrect: Must close INI-173A w/o waiting 50 minutes.

Plausible: If the candidate does not recognize the effect on the ND

system, and procedures call for waiting 50 minutes after the trip

before Aux spray.

Ques_862 For Official Use Only Page 100

Question #55 McGuire Nuclear Station RO Exam

D. Incorrect: Don't wait 50 minutes.

Plausible: Procedures call for waiting 50 minutes after the trip before

Aux spray.

Level: RO&SRO

KA: SYS 026K3.02(4.2*/4.3)

Lesson Plan Objective: ECC-NS SEQ 8, EP-E I SEQ 6

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-ECC-NS pages 21,37

2. OP-MC-PS-ND page 71

3. OP-MC-EP-EI page 257

4. EP/I/A/5000/ES-1.3 pages 10-11

Ques_862 For Official Use Only Page 101

Question #56 McGuire Nuclear Station RO Exam

Bank Question: 865.1 Answer: D

I Pt(s) Unit 2 is operating at 55% power when the 2C NCP trips on breaker

overload. Given the following events and conditions:

"* Loop C low flow trip annunciator alarms.

"* Both main feed pump turbines are tripped.

"* Reactor power is 50%, decreasing.

"* Tavc is 5750F, increasing.

"* The main turbine throttle valves are open.

"* The main turbine governor valves are open.

"* Rod control bank D is automatically inserting.

Which immediate action must be implemented under these conditions?

A. Start emergency boration of the NCS.

B. Trip the main steam isolation valves.

C. Trip the rod control motor generator breakers.

D. Trip the main turbine.

--- ---.................. ........................--------


......

Distracter Analysis: Maintenance of adequate heat sink is critical to the

ATWS with loss of feedwater. This overrides the adverse

consequences of a turbine trip for other cases.

A. Incorrect: Reactor shutdown is not time critical.

Plausible: This is an action of FR-S. 1 with power reduction the goal.

B. Incorrect: The MSIV's do not need to be closed unless the turbine

will not manually trip. Closing the MSIVs precludes steam dump

operation, making the event worse.

Plausible: This is an immediate RNO action of FR-S.1.

C. Incorrect: Reactor shutdown is not time critical.

Plausible: This is an action of FR-S. 1.

D. Correct:

Level: RO Only

KA: EPE 029EK3.06(4.2/4.3)

Lesson Plan Objective: EP-FRS SEQ 4

Source: New

Ques_865.1 For Official Use Only Page 102

Question #56 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MC-EP-FRS pages 23, 25

2. EP/2/A/5000/FR-S. I page 2

For Official Use Only Page 103

Ques 865.1

Question #57 McGuire Nuclear Station RO Exam

Bank Question: 866 Answer: B

1 Pt(s) Unit I is conducting a reactor startup in accordance with plant procedures.

The operator is pulling the control rods.

Which one of the following indications should the operator primarily

depend on for determining when the reactor achieves criticality?

A. When control rods exceed the ECP position.

B. When the reactor nuclear instrumentation indicates a stable,

positive startup rate and increasing flux levels with no control

rod motion.

C. When Tawv is increasing steadily with no control rod motion.

D. When the 1/m plot (Co/C) is approaching zero.


Distracter Analysis:

A. Incorrect: Not the primary indication - the ECP is only a benchmark

for the operator to use for when the reactor is predicted to go critical,

however, several possible errors could make the ECP significantly

inaccurate

Plausible: Candidate locks on to the fact that the ECP is the

estimated critical position and is used during a reactor startup.

B. Correct: actual reactor response is the only true method of

determining the reactor is critical

C. Incorrect: Tave does not increase when the reactor reaches criticality

Plausible: Indication the reactor is at the POAH

D. Incorrect: Not the primary indication

Plausible: Like the ECP, the 1/in is a tool to predict criticality, but

not 100% accurate. 1/m is calculated regularly during startup to

predict criticality.

Level: RO&SRO

KA: SYS 001 A3.08 (3.9/4.0)

Lesson Plan Objective: RT-RB 13, ADM-RM SEQ 8

Source: New

Level of knowledge: memory

References:

1. OP-MC-RT-RB page 24

For Official Use Only Page 104

Ques-866

Question #58 McGuire Nuclear Station RO Exam

Bank Question:867 Answer. A

I Pt(s) Unit I is in the process of starting the first NCP in accordance with

OP/1/A/6250/02A (Reactor Coolant Pump Operation) during a plantstartup.

Given the following conditions and events:

  • The operator starts the IA2 lift oil pump.
  • Lift oil pressure reaches 650 psig
  • 5 minutes later, as the crew is ready to start the IA NCP, the operator

notices IA2 lift oil pump was no longer running.

Which one of the following statements correctly explains the reason why the

pump is not running?

A. The lift oil pump tripped on overload.

B. The one minute timer for the lift oil pump timed out and stopped

the pump.

C. The lift oil pump stopped as soon as lift oil pressure reached 600

psi.

D. The lift oil pump stopped 1 minute after lift oil pressure reached

600 psi.

-.......... ........ .. ........----------------------------------........... .........

Distracter Analysis:

A. Correct: the pump will trip on overload

B. Incorrect: this condition does not cause the lift oil pump to trip

Plausible: the one-minute timer opens the lift oil pump breaker I

minute after the NCP breaker is closed.

C. Incorrect: this condition does not cause the lift oil pump to trip

Plausible: lift oil pressure must be 600 psi to start the NCP; the

candidate may assume the lift oil pump stops at the setpoint.

D. Incorrect: this condition does not cause the lift oil pump to trip

Plausible: candidate could assume that once lift oil pressure has been

sufficient for 1 minute, the pump turns off

Level: RO&SRO

KA: SYS 003 K6.14 (2.6/2.9)

Lesson Plan Objective: NCP SEQ 6

Source: New

For Official Use Only Page 105

Ques_867

Question #58 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

I. OP-MN-PS-NCP page 19

2. OP-MN-PS-NCP figure 7.12 page 79

For Official Use Only Page 106

Ques_867

Question #59 McGuire Nuclear Station RO Exam

Bank Question: 869 Answer: A

I Pt(s) Unit I is operating at 85% power following a transient. Given the following

events and conditions:

"* A control bank "D" rod is found to be misaligned.

"* The misaligned rod is at 200 steps

"* The remaining control bank "D" rods are at 220 steps.

"* Troubleshooting by Reactor Engineering determines that the control rod

will move in the inward direction but will not move outward.

"* The misaligned rod is found to have an electrical problem and is declared

inoperable.

Which one of the following statements correctly describes the effect (if any)

that the inoperable rod will have on shutdown margin (SDM) prior to the

transient?

A. SDM does not change because the stuck rod is trippable.

B. SDM does not change because the rod is not trippable.

C. SDM decreases by the worth of the immovable rod.

D. SDM increases by the worth of the immovable rod.

S--------------------------------------------------------------------------------

Distracter Analysis:

A. Correct: the problem is electrical and rods are above the RIL,

therefore SDM is unaffected.

B. Incorrect: if the rod were not trippable, SDM would decrease

Plausible: backwards logic from the correct answer.

C. Incorrect: SDM has not changed

Plausible: partially correct - if candidate believes the rod is not

trippable, SDM decreases for a stuck rod.

D. Incorrect: SDM has not changed

Plausible: if candidate assumes that the rod is not trippable and that

SDM increases (vice decreases) when determining SDM for stuck

rods

Level: RO Only

KA: APE 005 AK1.05 (3.3/4.1)

Lesson Plan Objective: AP14 SEQ 3

Source: New

Ques_869 For Official Use Only Page 107

Question #59 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MN-AP-14 background ENC. 2 step 5 page 32

2. AP-14 page 19

2. OP-MN-RT-RB page 27

Ques_869 For Official Use Only Page 108

Question #60 McGuire Nuclear Station RO Exam

Bank Question: 870 Answer. A

I Pt(s) Unit 1 was operating at 100% power. Given the following trends on the

IA NCP:

Time 0200 0205 0210 0215

Motor bearing temp (TF) 180 184 186 195

Lower pump bearing temp (TF) 221 225 228 231

Seal outlet temp (TF) 205 227 235 251

Motor winding temp (TF) 311 314 316 323

At what time must the IA NCP be secured?

A. 0200

B. 0205

C. 0210

D. 0215

Distracter Analysis:

A. Correct: NCP must be stopped if motor winding temperature reaches

311 degrees at 0200

B. Incorrect: NCP must be stopped at 0200

Plausible: reaches the temperature for securing NCP on lower

bearing

C. Incorrect: NCP must be stopped at 0200

Plausible: reach the limit for securing NCP on seal outlet temp at

0210

D. Incorrect: NCP must be stopped at 0200

Plausible: reach the temperature for stopping NCP on motor bearing

at 0215

Level: RO&SRO

KA: APE 015 AA2.09 (3.4/3.5)

Lesson Plan Objective: NCP SEQ 15

Source: New

Level of knowledge: memory

Ques_87o For Official Use Only Page 109

Question #60 McGuire Nuclear Station RO Exam

References:

1.OP-MN-PS-NCP page 37

For Official Use Only Page 110

Ques_87o

Question #61 McGuire Nuclear Station RO Exam

Bank Question: 871.1 Answer. B

1 Pt(s) The crew has entered ES-0.2, (Natural CirculationCooldown). NCS

temperature is 557°F and pressure is 2235 psig. Both emergency buses are

energized from their respective emergency diesel generators.

Which of the following conditions would require the crew to immediately

exit ES-0.2?

A. Loss of IETA occurs.

B. NCS pressure drops to 1800 psig.

C. Reactor vessel UR level indicates less than 100%.

D. All conditions except seal cooling are established for starting an

NCP.


Distracter Analysis:

A. Incorrect: loss of a single bus will not require exit

Plausible: candidate believes entry into ECA-0.0 is required.

B. Correct: SI will actuate, since ES-0.2 is not set up for accident

conditions, the crew must return to E-0. (foldout page criteria)

C. Incorrect: if it is determined later that the cooldown must continue

with a void in the reactor vessel, then transition to ES-0.3 is made,

however, if there is no rush, then the depressurization is stopped and

the void collapsed in ES-0.2

Plausible: this could result in a transition to ES-0.3

D. Incorrect: no pump would be started until management makes a

status evaluation. The desire is to start the NCP with nonnal

parameters. Since this is not an accident condition, there is no need

to run NCPs unless normal conditions are met

Plausible: in some procedures, such as C.1, NCPs are run without

all normal conditions established.

Level: RO Only

KA: W/E 09 EA2.1 (3.1/3.8)

Lesson Plan Objective: EO SEQ 3, 4, 5, 8

Source: New

Level of knowledge: memory

References:

I. OP-MN-EP-ES-0.2, page 12, 25 (foldout)

Ques_871.1 For Official Use Only Page 111

Question #62 McGuire Nuclear Station RO Exam

Bank Question: 873 Answer: C

1 Pt(s) Unit I is in mode 3 responding to a loss of off-site power.

Given the following parameters at the indicated times:

Parameter 0200 0300 0400 0500

"* NCS pressure (psig) 1955 1905 1855 1805

"* Tac ('F) 400 390 375 350

"* Pressurizer level (%) 27 23 26 25

"* Containment pressure (psig) 0.5 0.6 0.8 1.0

Which one of the following is the earliest action required to ensure a

controlled transition to mode 4?

A. Block SI actuation at 0200.

B. Terminate SI flow at 0300.

C. Block SI actuation at 0400.

D. Terminate SI flow at 0500.


... ...


..

Distracter Analysis:

A. Incorrect: Must be <1955 to block SI.

Plausible: if the candidate thinks that SI is blockable because this is

the numerical P-1I setpoint.

B. Incorrect: SI has not actuated.

Plausible: - if the candidate thinks that SI actuated at 1945 psig.

C. Correct answer: this is the first time and action possible to prevent

uncontrolled cooldown due to S1 actuation.

D. Incorrect: SI blocked at 0400.

Plausible: - if the candidate does not understand P-i1 and recognizes

that S1 actuates at 1845 psig.

Level: RO&SRO

KA: SYS 002A2.02(4.2/4.4)

Lesson Plan Objective: ECC-ISE SEQ 8/9/10

Source: New

Level of knowledge: comprehension

Ques_873 For Official Use Only Page 112

Question #62 McGuire Nuclear Station RO Exam

References:

1. OP-MC-ECC-ISE pages 21, 23

Ques-873 For Official Use Only Page 113

Question #63 McGuire Nuclear Station RO Exam

Bank Question: 874 Answer. C

I Pt(s) Unit I is at full power with all systems selected to automatic. Given the

following event:

  • Bus IEVKA was deenergized.

Why would the crew have to switch the suction source for the NV pumps to

the FWST?

A. VCT level indication is lost.

B. Control power to the boric acid pumps is lost.

C. Auto makeup capability to the VCT is lost.

D. VCT makeup cannot keep up with charging flow.


Distracter Analysis:

A. Incorrect: VCT level transmitters remain powered.

Plausible: if the candidate thought level indication is lost, then it

would seem prudent to switch to the FWST.

B. Incorrect: BA pumps can be manually operated.

Plausible: candidate may know blended makeup is lost but not sure

why. Loss of boric acid pumps would seem like a likely reason to

switch to the FWST.

C. Correct: the modulating signal for NV-252 and 267 is lost. Auto

blended makeup to the VCT is lost.

D. Incorrect: makeup capacity is matched to charging capacity.

Plausible: if the candidate is aware of the loss of makeup control,

this would be the reason for swapping to the FWST.

Level: RO&SRO

KA: APE 057AK1.04(3.5/3.6)

Lesson Plan Objective: AP-15 SEQ 2

Source: New

Level of knowledge: comprehension

References:

1. AP-15 Background Document page 21

2. AP-15 page 8, 130

Ques_874 For Official Use Only Page 114

Question #64 McGuire Nuclear Station RO Exam

Bank Question: 875 Answer: B

I Pt(s) Which one of the following indications would be consistent with valve

2NV-7B(LETDOWN CONT OUTSIDE [SOQ) closing while the plant was at

power?

A. Letdown system flashing.

B. PRT level increasing.

C. Valve 2NV-124 (LETDOWN PRESSURE CONTROL) full open.

D. Regenerative HX high temperature alarm on 2AD-7 (REGENHx

LETDN HI TEMP).


Distracter Analysis:

A. Incorrect: Letdown temperature is decreasing.

Plausible: if the candidate confuses the loss of letdown with loss of

charging.

B. Correct: closure of the valve will quickly pressurize the letdown

system to the lift setpoint of the letdown line relief valve, as a result

PRT level will increase.

C. Incorrect: NV- 124 will close to try to increase backpressure.

Plausible: candidate reverses the action of NV 124 as it attempts to

maintain system pressure.

D. Incorrect: Letdown temperature is decreasing.

Plausible: if the candidate believes letdown temperature will increase

as a result of the valve closing.

Level: RO Only

KA: SYS 007A3.01(2.7/2.9)

Lesson Plan Objective: PS-NV SEQ 2

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-PS-NV pages 23, 115

Ques_875 For Official Use Only Page 115

Question #65 McGuire Nuclear Station RO Exam

Bank Question: 876 Answer. C

I Pt(s) Unit 1 is operating at 100% power, steady state when a PZR SPRA YLINE

LO TEMP alarm annunciates. No other abnormal annunciators are alarming.

Which one of the following statements is the most likely explanation for this

alarm'?

A. Pressurizer heater bank C is off.

B. Lack of insurge/outsurge cycles has allowed ambient cooling.

C. Spray valve orifice fouling problems.

D. IB NCP has tripped.


Distracter Analysis:

A. Incorrect: heater loss could cause low PZR pressure and temperature

but will not affect Tcold flow from NCPs.

Plausible: heaters can be energized to maximize mixing of NCS and

pressurizer, when heaters are on, there will be more spray.

B. Incorrect: Spray temperature is not affected by PZR surges.

Plausible: this could be a partial answer to a surge line low

temperature, which the minimum spray flow also addresses.

C. Correct:

D. Incorrect: There will be other alarms if an NCP trips.

Plausible: this could cause a low spray temperature alarm.

Level: RO&SRO

KA: SYS 010K4.01(2.7/2.9)

Lesson Plan Objective: PS-NC SEQ 9

Source: New

Level of knowledge: memory

References:

1. OP-MC-PS-NC page 31

For Official Use Only Page 116

Ques_876

Question #66 McGuire Nuclear Station RO Exam

Bank Question: 877 Answer: B

I Pt(s) Unit I is at full power. Pressurizer level is on program. All systems are in

automatic.

Which one of the following statements correctly describes the relationship

between the charging and letdown flow'?

A. Charging flow through the regenerative heat exchanger equals

letdown flow + seal return.

B. Charging flow through the regenerative heat exchanger is less

than letdown flow.

C. Charging flow through INV-241 (SEAvLINJFLowCONTROL)

equals letdown flow.

D. Charging flow through 1NV-241 + seal injection equals letdown

flow.


Distracter Analysis:

A. Incorrect: charging flow through the regenerative heat exchanger

will be approximately 55 gpm. Letdown + seal return is 87 gpm.

Plausible: if the candidate misunderstands or misapplies the flow

balance.

B. Correct: charging flow through the regenerative heat exchanger will

be approximately 55 gpm. Letdown flow is 75 gpm.

C. Incorrect: Charging flow through NV-241 will be 55 gpm, letdown

is 75 gpm.

Plausible: if the candidate misunderstands or misapplies the flow

balance.

D. Incorrect: 55 gpm + 32 gpm is 87 gpm, letdown is 75 gpm. The

balance is charging + seal injection = letdown + seal return

Plausible: if the candidate misunderstands or misapplies the flow

balance.

Level: RO&SRO

KA: SYS 011 K5.06(2.9/3.2)

Lesson Plan Objective: PS-NV SEQ 3

Source: New

Level of knowledge: memory

References:

1.OP-MC-PS-NV page 117

Ques_877 For Official Use Only Page 117

Question #67 McGuire Nuclear Station RO Exam

Bank Question: 878 Answer: B

I Pt(s) A Unit 1 startup is in progress. Given the following events and conditions:

  • Reactor is critical in the source range.
  • Power Range channel 41 is removed from service for zero power physics

testing.

  • A loss of EKVB occurs.

Which one of the following actions occur?

A. Reactor trips and source range channel 32 is deenergized.

Source range 31 is still in operation.

B. Reactor trips and both source range channels are deenergized.

C. The reactor critical and source range channel 32 is deenergized.

Source range channel 31 is still in operation.

D. The reactor is critical

Both source range channels are de-energized.

- -.-....-------.-.-..-.....--------- --------. . . ..----------------..----

Distracter Analysis:

A. Incorrect: P-10 will be met, both SR's will de energize.

Plausible: if the candidate does not realize P-10 will turn off both

source ranges and recognizes the reactor trips when SR 32 de

energizes.

B. Correct:

C. Incorrect: Reactor trips on a number of PR/SR trip setpoints. Also,

P-10 will turn off both SR's.

Plausible: if the candidate thinks that the loss of the bus will turn off

the SR-32 without actuating the trip bistable.

D. Incorrect: Reactor trips on a number of PR/SR trip setpoints.

Plausible: if the candidate does not realize at power trips (or SR 32

loss of power) will cause a reactor trip but fails to realize P-10 will

turn off the SR (loss of power actuates P- 10 bistable on N42.

Level: RO&SRO

KA: SYS 015K4.01(3.1/3.3)

Lesson Plan Objective: LC-ENB SEQ 12

Source: New

For Official Use Only Page 118

Ques_878

Question #67 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MC-IC-ENB pages 51, 61

2. OP-MC-IC-IPE page 83

Ques_878 For Official Use Only Page 119

Question #68 McGuire Nuclear Station RO Exam

Bank Question: 880 Answer: A

I Pt(s) Unit 1 was preparing to synchronize and load the main generator onto the

grid. Given the following conditions:

  • The appropriate generator voltage conditions have been established.
  • The GENA UTO/MANUAL SYNC swIcTC has been placed in the MAN

position

If the operators have been directed to manually synchronize the generator,

which one of the following actions are correct to close breaker I A?

A. Press and hold the SYNC button. When the synchroscope is

rotating slowly in the fast direction, then press the CLOSE button

for the 1A breaker at 5 minutes to 12 o'clock.

B. Press and hold the AUTO SYNC button on the DEH panel until

the IA generator breaker is closed.

C. Rotate the main generator GENAUTO/MANUAL SYNC SWITCH

to the AUTO ]A BREAKER position, and press the SYNC button for

breaker 1A.

D. Press and hold the AUTO SYNC button on the DEH panel.

When the synchroscope is rotating slowly in the fast direction,

press the CLOSE button for the 1A breaker at 5 minutes to 12

o'clock.


------------------------- ------------- ---------

Distracter Analysis:

A. Correct: to manually close, the pushbutton is depressed until the

breaker is closed

B. Incorrect: AUTO SYNC button only works for auto

synchronization. The GEN switch would have to be placed in the

Auto IA position.

Plausible: this partially reflects the auto-closure mode (breaker IA

position).

C. Incorrect: the SYNC button will not close the breaker.

Plausible: this partially reflects the auto-closure mode (AUTO

SYNC vs. SYNC).

D. Incorrect: AUTO SYNC button only works for auto

synchronization.

Plausible: synchroscope rotation is a requirement for closing the

breaker.

Level: RO&SRO

Ques_880 For Official Use Only Page 120

Question #68 McGuire Nuclear Station RO Exam

KA: SYS 062K4.05(2.7/3.2)

Lesson Plan Objective: GEN-MG SEQ 6

Source: New

Level of knowledge: memory

References:

1. OP-MC-GEN-MG page 71, 111

2. OP/l/A/6300/001 pages 11, 12

Ques_88o For Official Use Only Page 121

Question #69 McGuire Nuclear Station RO Exam

Bank Question: 881 Answer. B

I Pt(s) Unit one was operating at 100% power when a total loss of onsite and offsite

power occurred. Given the following events and conditions:

  • IEVDA is supplying normal full power loads,
  • No battery charger is available,
  • Systems operate normally

Which one of the following statements correctly describes the minimum

length of time that bus IEVDA is designed to sustain loads and what action

will protect the DC bus loads?

A. After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the vital battery bus breaker will open

automatically when bus voltage falls to 105 volts.

B. After 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the vital battery breaker must be manually opened

when bus voltage falls to 105 volts.

C. After 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the vital battery breaker will open automatically

when bus voltage falls to 107 volts.

D. After 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the vital battery breaker must be manually opened

when bus voltage falls to 107 volts.


----------------

Distracter Analysis:

A. Incorrect: the vital battery breaker does not automatically open

Plausible: partially correct - the design time for sustaining loads is I

hour

B. Correct: below this value the battery could be damaged or

components will begin to fail.

C. Incorrect: the battery is expected to last for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and there is no

automatic trip associated with low voltage

Plausible: the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> requirement for battery performance is typical

of the aux batteries voltage limit is 107 volts.

D. Incorrect: the vital batteries are not designed to sustain loads for 4

hours

Plausible: partially correct DC bus protection is achieved by

manually opening the breaker voltage limit is 107 volts.

Level: RO&SRO

KA: SYS 063A4.03(3.0/3.1)

Lesson Plan Objective: AP- 15 SEQ 2

Ques_881 For Official Use Only Page 122

Question #69 McGuire Nuclear Station RO Exam

Source: New

Level of knowledge: memory

References:

1. AP- 15 Background Document pages 4, 40

2. AP/1/A/5500/015 page 49

Ques_881 For Official Use Only Page 123

Question #70 McGuire Nuclear Station RO Exam

Bank Question: 882 Answer. B

1 Pt(s) Unit 2 is operating at 100% power. Given the following events and

conditions:

"* Operators started RV pumps A & B due to rising containment

temperatures.

"* Containment Upper temperature is 90 'F, decreasing.

"* Containment Lower temperature is 128 'F, decreasing.

"* At 0200, a loss of off-site power occurs on Units I and 2

"* Operators implement the appropriate procedures.

Which one of the following pumps provides the assured source of cooling

water to maintain containment temperature within Tech Spec limits'?

A. 2C RV pump

B. 2A RN pump

C. 2B RN pump

D. 2A or 2B RN pumps.


Distracter Analysis:

A. Incorrect: RN pump 2A supplies. RV pumps could lose power post

blackout.

Plausible: RV pump C could be considered the supply since it will

try to start on loss of cooling water pressure.

B. Correct: on blackout signal, B train RN supply valves close, but the

42A does not, leaving cooling from the A RN pump.

C. Incorrect: RN pump 2A supplies RV post blackout.

Plausible: if the candidate thinks supply comes from the B RN train.

D. Incorrect: RN pump 2A supplies RV post blackout.

Plausible: if the candidate does not realize one train of valves close

on blackout.

Level: RO Only

KA: SYS 076 K2.04 (2.5/2.6)

Lesson Plan Objective: CNT-RV SEQ 13

Source: New

Level of knowledge: memory

For Official Use Only Page 124

Ques_882

Question #70 McGuire Nuclear Station RO Exam

References:

1. OP-MC-PSS-RN pages 57, 85

2. OP-MC-CNT-RV page 29

Ques_882 For Official Use Only Page 125

Question #71 McGuire Nuclear Station RO Exam

Bank Question: 883 Answer: A

1 Pt(s) A diesel powered VI compressor has auto-started due to decreasing VI

pressure. Given the following events and conditions:

"* VI system pressure has returned to 93 psig.

"* The operator presses the blue RESET button on the compressor control

panel.

Which one of the following statements correctly describes the expected

status of the VI compressor?

A. No response, the compressor remains running because pressure

is less than 95 psig.

B. The VI compressor remains running, but now can be shutdown

and returned to auto by the operator and remain shutdown

unless pressure decreases below 90 psig.

C. The VI compressor remains running, but now will automatically

stop when pressure is greater than 95 psig.

D. The VI compressor automatically shuts down immediately but

will restart if returned to automatic by the operator.

-- ----------------------------------------------------------

Distracter Analysis:

A. Correct: The compressor will not shutdown. Control of the

compressor can be regained when pressure is above 95 psig, then the

reset can be accomplished and the compressor shutdown.

B. Incorrect: The compressor does not shutdown and the operator

cannot take control

Plausible: candidate believes the control is returned to the operator

and can be returned to auto. This is not true, if returned to auto below

95 psig, it will restart.

C. Incorrect:

Plausible: if the candidate thinks the reset button allows the

compressor to automatically shutdown.

D. Incorrect:

Plausible: candidate believes the compressor will stop, the

compressor if returned to auto (after shutdown by the operator),

would restart.

Level: RO&SRO

KA: SYS 078 K4.01 (2.7/2.9)

For Official Use Only Page 126

Ques_883

Question #71 McGuire Nuclear Station RO Exam

Lesson Plan Objective: SS-VI SEQ 4

Source: New

Level of knowledge: comprehension

References:

1. OP-MN-SS-VI page 57,61

Ques_883 For Official Use Only Page 127

Question #72 McGuire Nuclear Station RO Exam

Bank Question: 884 Answer. B

I Pt(s) Which one of the following statements correctly describes how the train B

manual reactor trip and automatic reactor trip signals input to the trait B

reactor trip bypass breaker'?

A. Manual de-energizes the bypass breaker UV coil through SSPS.

Auto does not input to the bypass breaker circuit.

B. Manual energizes the bypass breaker shunt coil.

Auto does not input to the bypass breaker circuit.

C. Manual de-energizes the bypass breaker UV coil through SSPS.

Auto energizes the bypass breaker shunt coil.

D. Manual energizes the bypass breaker shunt coil.

Auto de-energizes the bypass breaker UV coil through the SSPS.

-- ------------------------------------------------------------

Distracter Analysis:

A. Incorrect: manual energizes the shunt trip coil.

Plausible: if the candidate knows auto does not input to the circuitry,

but confuses which action the manual trip performs.

B. Correct:

C. Incorrect: manual energizes the shunt trip coil, and auto performs no

function for the corresponding train.

Plausible: auto performs this action for the opposite train bypass

breaker.

D. Incorrect: auto de-energizes the opposite bypass breaker UV coil.

Plausible: close to the normal RTB response to trip signals.

Level: RO&SRO

KA: EPE 007EK2.02 (2.6/2.8)

Lesson Plan Objective: IC-RTB SEQ 8

Source: New

Level of knowledge: memory

References:

1. OP-MC-IC-RTB page 29, 31, 65

Ques_884 For Official Use Only Page 128

Question #73 McGuire Nuclear Station RO Exam

Bank Question: 885 Answer. D

I Pt(s) Unit I is operating at 60% power. PZR level and pressure control are selected

to the (3-2) combination. Given the following events and conditions:,

0 Inverter IEVID fails.

Assuming no operator action, which one of the following statements correctly

describes the effect of this failure on charging and letdown control?

REFERENCES PROVIDED:AP-15 pages 135-138

A. 1NV-238 (CHARGINGLINE FLOW CONTROL) opens, INV-2A (NC LID

ISOL TO REGENHX) closes, and actual PZR level increases.

B. 1NV-238 closes, INV-IA (NC LDISOL TOREGENHX) closes, and

actual PZR level increases.

C. 1NV-238 closes, 1NV-1&2A close, and actual PZR level decreases.

D. There is no effect on charging or letdown control.


Distracter Analysis:

A. Incorrect: Channel 4 will fail low.

Plausible: This is the response to a controlling channel failed low.

B. Incorrect: Channel 4 will fail low.

Plausible: This is the response to a backup channel failed low.

C. Incorrect: Channel 4 will fail low.

Plausible: if the candidate thinks that the output fails high on loss of

power.

D. Correct:

Level: RO&SRO

KA: SYS 004K2.06(2.6/2.7)

Lesson Plan Objective: EP-EPL SEQ 6

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-PS-ILE pages 15, 23, 25

2. AP/I/A/5500/15 pages 135-138 - PROVIDED

For Official Use Only Page 129

Ques_885

Question #74 McGuire Nuclear Station RO Exam

Bank Question: 886 Answer: A

I Pt(s) Unit 2 is operating at 100% power on 8/3/01. Given the following events

and conditions:

"* All systems are aligned for normal operation.

"* A waste monitoring tank is being released with 4 RC pumps in operation.

"* The RS pump is tagged for seal replacement.

Assuming no operator action, which one of the following statements

correctly describes the plant response to a massive debris entrainment of the

Unit 2 intake structure?

A. The unit will trip on low condenser vacuum due to loss of RC

flow.

B. The unit would continue to operate because the screen wash flow

will be supplied from the RF system.

C. The unit would trip when the RC pumps cavitate at 745' level in

the intake structure.

D. The unit would continue to operate due to circulating water

being supplied by the low level water supply system.



Distracter Analysis:

A. Correct: Intake level will drop due to clogging, causing loss of RC

flow.

B. Incorrect: There is no procedural methodology to supply RS from

the RF system.

Plausible: The piping exists to perform this crossover.

C. Incorrect: pump cavitation will not cause the unit to trip.

Plausible: The pumps will cavitate at about the 745' level.

D. Incorrect: There is no low level supply for unit 2.

Plausible: If the candidate does not know the unit 2 RC system

alignment.

Level: RO Only

KA: SYS 075A2.01(3.0/3.2)

Lesson Plan Objective: MT-RC SEQ 7

Source: New

For Official Use Only Page 130

Ques_886

Question #74 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

I. OP-MC-MT-RC pages 21,23, 29, 31, 43

For Official Use Only Page 131

Ques_886

Question #75 McGuire Nuclear Station RO Exam

Bank Question: 887 Answer, B

I Pt(s) Unit 1 is conducting a reactor startup following a plant trip due to an IAE

error during instrument calibration. Given the following data:

"* Time of shutdown 1520 on 01/27/02

"* Anticipated time of criticality 0100 on 01/28/02

"* Core bumup 250 EFPD

"* NCS Boron 750 ppm

"* Estimated critical position 105 steps on Bank C

"* Control rod position at 0200 40 steps on Bank C

Which one of the following statements correctly describes the required

operator actions?

REFERENCES PROVIDED: Unit 1 Databook Table 6.3B and Graph 1.2,

OP/O/A/6100/006

A. Recalculate the ECP if the reactor is not yet critical at 175 steps

of Bank C.

B. Insert the rods and recalculate the ECP if criticality will be

achieved at 40 steps of Bank C.

C. Recalculate the ECP because it is past the anticipated criticality

time.

D. Insert the rods and recalculate the ECP because it is past the

anticipated criticality time.

-............................................---------------------------------........

Distracter Analysis: TSIL - 47 steps on Bank C. ECP +750pcm - 195

steps on Bank C. ECP - 750 pcm = 25 steps on Bank C.

A. Incorrect: Can pull rods to 195 steps before recalculating.

Plausible: If the candidate misreads the integral rod worth table.

B. Correct: Critical rod position is < TSIL

C. Incorrect: The rods must be inserted.

Plausible: This could be the answer at 0300, if Xenon was not

decaying rapidly.

D. Incorrect: Wrong reason (not 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> from calculated time).

Plausible: This could be the answer at 0300.

Level: RO Only

KA: G2.2.34(2.8/3.2)

For Official Use Only Page 132

Ques_887

Question #75 McGuire Nuclear Station RO Exam

Lesson Plan Objective: RT-RB SEQ 4

Source: New

Level of knowledge: analysis

References:

1. OP-MC-RT-RB pages 8-9, 16, 18

2. OP/O/A/6100/006 pages 2,3 - PROVIDED

3. Unit I Databook Graph 1.2 and Table 6.3B - PROVIDED

Ques_887 For Official Use Only Page 133

Question #76 McGuire Nuclear Station RO Exam

Bank Question: 888 Answer: B

I Pt(s) Unit 1 is responding to a steam break inside containment from full power.

Given the following events and conditions:

"* All systems operate as designed.

"* Narrow range S/G level is 15% for each intact S/G

"* CA flow is 100 GPM to each intact S/G.

"* The NCPs were tripped.

"* The crew entered FR-P. I (Response to Imminent Pressurized Thermal

Shock Condition) due to low temperature.

"* NCS temperature is now stable.

"* NCS pressure is stable with only the control group of pressurizer heaters

energized.

"* Letdown has been restored

If the crew has determined that a I hour soak is required, which of the

following evolutions could be performed by the crew in the next hour while

continuing on through the EP procedures?

A. Start ID NCP

B. Place auxiliary spray in service

C. Increase CA flow to one intact S/G to raise NR level to 50%

D. Commence a 25-degree/hour cooldown to Mode 5


Distracter Analysis:

A. Incorrect: Starting a NCP will cause a pressure transient and could

cause further cooldown.

Plausible: If the candidate does not understand the limitations during

the soak or the effects of NCP start.

B. Correct: Any actions that will not cause either a cooldown or a

pressure rise and are specified by any other procedure in effect are

permitted during this "soak" period.

C. Incorrect: Increases cooldown stressing the vessel.

Plausible: The candidate may not link raising S/G level with a

cooldown.

D. Incorrect: Cooldown is not allowed.

Plausible: The candidate may recall that a cooldown at less than

50/hr is directed after the soak.

Level: RO&SRO

For Official Use Only Page 134

Ques_888

Question #76 McGuire Nuclear Station RO Exam

KA: W/E 08 EK 3.3 (3.7/3.8)

Lesson Plan Objective: EP-FRP SEQ 3

Source: New

Level of knowledge: memory

References:

1. OP-MC-EP-FRP pages 17,43

2. EP/1/A/5000/FR-P.1 page 28

Ques_888 For Official Use Only Page 135

Question #77 McGuire Nuclear Station RO Exam

Bank Question: 889 Answer: C

I Pt(s) A small fire has broken out in the incore instrument room as a result of

welding on a thimble support. Given the following events and conditions:

"* The control room isolated the VT systems (breakers are tagged open).

"* The fire watch exhausted a portable CO 2 fire extinguishers on the burning

insulation before leaving the area,

"* The area is posted as a radiological surface

2

contamination area with the

maximum level of I 0E5 dpm/ 100 cm

Which one of the following would be the preferred method for the fire

brigade to extinguish this fire?

A. Actuate the incore instrument room Halon system

B. Portable CO 2 extinguishers due to the potential for electrical

hazards in the area.

C. Portable water extinguishers because of their better quenching

capability in this low combustible loading area.

D. Portable dry chemical extinguishers because of their better

smothering capability.

-- -----------------------------------------------------------------

Distracter Analysis:

A. Incorrect: There is no Halon system in this room

Plausible: Some areas are equipped with Halon fire protection

systems.

B. Incorrect: Portable water extinguishers would be preferred.

Plausible: C02 is preferred for electrical fires.

C. Correct: A hose would be overkill and spread contamination.

D. Incorrect: Portable water extinguishers would be preferred.

Plausible: Dry chemical extinguishers smother oil fires better.

Level: RO&SRO

KA: G2.4.26 (2.9/3.3)

Lesson Plan Objective: None

Source: New

Level of knowledge: memory

Ques_889 For Official Use Only Page 136

Question #77 McGuire Nuclear Station RO Exam

References:

1. None

Ques_889 For Official Use Only Page 137

Question #78 McGuire Nuclear Station RO Exam

Bank Question: 890 Answer. C

I Pt(s) Unit 2 was operating at 85 % power. Given the following events and

conditions:

"* Loop C Tavy is bypassed due to a failed T, RTD

"* Loop A Tho fails high causing a reactor trip

"* All other systems perform their design functions

Which one of the following statements correctly describes the system

response to this event?

A. The MSIVs close

B. All steam dumps close after the NCS reaches 557°F

C. FWI occurs at 553'F

D. The main feed pumps trip.


Distracter Analysis:

A. Incorrect: MSIVs do not close.

Plausible: This would be a prudent response to excess steam demand

due to Tave failures

B. Incorrect: All dumps are closed at 553°F by the P12 interlock.

Plausible: If the candidate overlooks FWI and/or the RTD failures

affect on the trip controller - the reason is correct.

C. Correct:

D. Incorrect: No SI or Hi-Hi S/G level

Plausible: If the candidate does not remember the initial conditions

Level: RO Only

KA: SYS 059K1.05(3.1/3.2)

Lesson Plan Objective: CF-CF SEQ 12

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-CF-CF page 33

2. OP-MC-STM-IDE pages 21, 23, and 27

Ques_89o For Official Use Only Page 138

Question #79 McGuire Nuclear Station RO Exam

Bank Question: 891 Answer. B

I Pt(s) Unit 1 has experienced a loss of coolant accident. Emergency procedures

prescribe successful response mechanisms if containment water level

remains between 3.5 and 10.5 feet.

What is the reason why safe plant recovery is not assured when level exceeds

10.5 feet?

A. Operation of the ND system is compromised by high suction

pressure.

B. Operation of critical components needed for safe recovery is

endangered by submersion.

C. Operation of the KC system is compromised by loss of water to

the containment.

D. Operation of critical components needed for safe plant recovery

is endangered by high humidity.


...-

-.--.-.-.. . ... -- ............--------


..............

Distracter Analysis:

A. Incorrect: 10.5 feet of water will not lift the ND suction relief, or if it

did the relief returns to the PRT.

Plausible: High containment level increases ND suction pressure.

B. Correct:

C. Incorrect: KC is a closed system that provides limited source of

water inside containment.

Plausible: the KC system is a possible source of flooding inside

containment.

D. Incorrect: Critical components inside containment are protected

from high humidity (EQ program).

Plausible: Non-critical components will be endangered by high

humidity.

Level: RO&SRO

KA: EPE WE 15 EK2.2 (2.7/2.9)

Lesson Plan Objective: EP-FRZ SEQ 4

Source: New

Level of knowledge: memory

Ques_891 For Official Use Only Page 139

Question #79 McGuire Nuclear Station RO Exam

References:

1. OP-MC-EP-FRZ page 47

Ques_891 For Official Use Only Page 140

Question #80 McGuire Nuclear Station RO Exam

Bank Question: 892 Answer: A

I Pt(s) Unit 1 is operating at 100% power when the OAC registers a low spent fuel

pool level alarm. Given the following events and conditions:

"* The operators read 2.1 ft SFP level and steady on the main control

board.

"* The operating KF pump has tripped.

"* An NLO reports a large leak in the auxiliary building.

"* Normal SFP makeup is not available.

Which one of the following statements correctly describes the corrective

action for this event?

A. Find and isolate the leak on the KF discharge piping.

B. Find and isolate the leak on the KF suction piping.

C. Initiate assured makeup due a leak on the discharge piping.

D. Initiate assured makeup due to a leak on the suction piping.


-- --------

Distracter Analysis:

A. Correct:

B. Incorrect: The leak is on the discharge piping.

Plausible: If the candidate confuses the piping immersion depth with

the suction pipes, which are at 4 feet.

C. Incorrect: Do not use assured source unless radiological hazard is

imminent.

Plausible: If the candidate does not recognize the hazard associated

with adding raw water to the SFP.

D. Incorrect: Do not use the assured source, and the leak is on the

discharge piping.

Plausible: If the candidate does not recognize the hazard associated

with adding raw water to the SFP, and confuses the piping immersion

depth with the suction pipes.

Level: RO Only

KA: SYS 033A3.02(2.9/3.1)

Lesson Plan Objective: FH-KF SEQ 5/14

Source: New

Ques_892 For Official Use Only Page 141

Question #80 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MC-FH-KF pages 19, 23, 41,49

Ques_892 For Official Use Only Page 142

Question #81 McGuire Nuclear Station RO Exam

Bank Question: 893.1 Answer: C

1 Pt(s) Unit I is operating at 80 % power, steady state. Given the following events and

conditions:

"* Rod control is in manual for testing.

"* Control bank D is at 155 steps.

"* IAD-2, A9 & B9 (CONTROL BANK LO &LO-LO LIMIT) alarms actuate.

Which one of the following conditions could be the cause of these two

alarms?

A. Turbine impulse pressure channel failed high.

B. NIS channel N42 failed high.

C. Loop lB T, instrument failed high.

D. Loop 1A Ta,, failed high.


Distracter Analysis:

A. Incorrect: D/T controls RIL.

Plausible: Impulse pressure (Tref) is proportional to power and could

be used to calculate RIL.

B. Incorrect: D/T controls RIL.

Plausible: NIS power could be used to calculate RIL (and is at some

plants).

C. Correct: Control bank D is above the RIL alarms, but when D/T

goes high, RIL goes to 161 and the alarms actuate.

D. Incorrect: D/T controls RIL.

Plausible: Tave is proportional to power and could be used to

calculate RIL.

Level: RO&SRO

KA: SYS 014K1.02(3.0/3.3)

Lesson Plan Objective: IC-IRE SEQ I1

Source: New

Level of knowledge: comprehension

References:

Ques_893.1 For Official Use Only Page 143

Question #81 McGuire Nuclear Station RO Exam

1. OP-MC-IC-IRE pages 17, 37, 55, 63

2. OP-MC-PS-NC pages 45, 47

3. Unit I Databook Graph 1.2

4. OP/1/A/6100/010C, A9 Control Bank Lo Limit

5. OP/I/A/6 100 /01OC, B9 Control Bank Lo-Lo Limit

Ques_893.1 For Official Use Only Page 144

Question #82 McGuire Nuclear Station RO Exam

Bank Question: 894 Answer: B

I Pt(s) Unit 2 is operating at 100 % power. Given the following events and

conditions:

"* "B" essential train is in service.

"* 2A RN train is in operation for testing.

"* The RN trains are split with 2RN-41B, (TRAiNB ToNoN-ESSHDRISOL)

closed.

Which of the following statements correctly describes the potential

consequence if 2RN- I90B (RN To B KC H.V CONTROL) failed to perform its

automatic function associated with decreasing B train RN flow?

A. Flashing in the 2B KC heat exchanger.

B. Overheating 2B RN pump.

C. Overheating the running B train KC pumps.

D. 2RN-41B will open to restore flow to the heat exchanger.


Distracter Analysis:

A. Incorrect: no flashing should occur, pressure is not changing.

Plausible: candidate believes that like the letdown regen heat

exchanger, flashing on loss of cooling could occur

B. Correct: Lose mini-flow protection for RN pump 2B.

C. Incorrect: B train pumps cooled by separate supply.

Plausible: candidate believes heat exchanger and pump cooling come

from the same place.

D. Incorrect: no auto open signal for RN41 B.

Plausible: candidate feels there is some reason for the stated position

of 41B in the setup and guesses it can auto open. Valve closes on

blackout signal.

Level: RO&SRO

KA: APE 062AK3.04(3.5/3.7)

Lesson Plan Objective: PSS-RN SEQ 7

Source: New

Ques_894 For Official Use Only Page 145

Question #82 McGuire Nuclear Station RO Exam

Level of knowledge: comprehension

References:

1. OP-MC-PSS-RN pages 23, 41,73, 85

2. OP-MC-PSS-KC page 39

Ques_894 For Official Use Only Page 146

Question #83 McGuire Nuclear Station RO Exam

Bank Question: 895 Answer: B

I Pt(s) Unit I is operating at 100% power with no TSAIL entries.

Subsequently, the IA emergency diesel generator battery is disconnected

from battery charger IEDGA

Which one of the following statements correctly describes the status of the

IA emergency diesel generator?

REFERENCES PROVIDED: Tech Spec 3.8.1

A. The IA emergency diesel generator is inoperable and must be

returned to service in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

B. The IA emergency diesel generator is inoperable and must be

returned to service in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

C. The IA emergency diesel generator is operable because the

battery charger has a vital power supply, and will supply the bus

without a battery.

D. The IA emergency diesel generator is operable because the

battery supplies auxiliary loads that are not needed for diesel

operation.


Distracter Analysis:

A. Incorrect: DG can be out of service for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Plausible: Several TS 3.8.1 TSASs specified 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AOTs.

B. Correct:

C. Incorrect: DG is inoperable.

Plausible: The rest of the answer is correct.

D. Incorrect: DG is inoperable.

Plausible: Some DG auxiliaries are not required for operability.

Level: RO Only

KA: APE 056 G2.2.23 (2.6/3.8)

Lesson Plan Objective: DG-DG SEQ II

Source: New

Level of knowledge: comprehension

Ques_895 For Official Use Only Page 147

Question #83 McGuire Nuclear Station RO Exam

References:

1. OP-MC-DG-DG pages 31,49

2. Tech Spec 3.8.1 - PROVIDED

Ques_895 For Official Use Only Page 148

Question #84 McGuire Nuclear Station RO Exam

Bank Question: 896 Answer. D

I Pt(s) Unit I is operating in mode 4. Given the following events and conditions:

"* Pressurizer level is at 25% (INCP-5173) (COLD CAL)

" IlB NCP is in operation

"* All steam generator narrow range levels are approximately 45%

" 1A ND pump and its associated heat exchanger are in service

"* "B" Train of ND is operable.

"* NCS temperature currently at 280'F

"* Cooling water is lost to the IB KC heat exchanger,

How much time does the crew have to restore inoperable equipment or loops

to service?

REFERENCES PROVIDED: Tech Spec 3.4.6, 3.7.6

A. No time: an NCS loop must be restored immediately

B. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

C. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

D. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />


Distracter Analysis:

A. Incorrect: There are 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed to restore KC loop B.

Plausible: if the candidate believes loss of KC loop B results in loss

of cooling to the D NCP. Tech Spec 3.4.6 requires immediate action

B. Incorrect: There are 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed to restore KC loop B.

Plausible: if the candidate believes TS 3.0.3 applies

C. Incorrect: There are 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed to restore KC loop B.

Plausible: if the candidate applies time to be in MODE 5 instead of

the AOT of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

D. Correct: B KC loop is out of service, TS 3.4.6 does not apply. Crew

has 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore KC to operable status.

Level: RO&SRO

KA: APE 026 G2.2.23 (2.6/3.8)

Lesson Plan Objective: PSS-KC SEQ 15

Source: New

Level of knowledge: comprehension

Ques-896 For Official Use Only Page 149

Question #84 McGuire Nuclear Station RO Exam

References:

1. Tech Spec 3.7.6

2. Tech Spec 3.4.6

Ques_896 For Official Use Only Page 150

Question #85 McGuire Nuclear Station RO Exam

Bank Question: 897 Answer. C

I Pt(s) Unit I is about to commence refueling.

Given the following conditions at 0100:

"* Currently no fuel is being moved.

"* Source range channel N3 I is out of service for testing.

"* Channel IA of the wide range neutron flux monitoring system is out of

service for calibration.

"* Channel IB of the wide range neutron flux monitoring system is

operable.

Given the following events and times:

  • 0200 NIS source range channel N32 instrument power fuse blows.
  • 0300 Wide range neutron flux monitor channel IA is restored to operable

status.

  • 0400 NIS source range channel N32 is restored to operable status.
  • 0500 NIS source range channel N3 1 is restored to operable status.

What is the earliest time that refueling can commence?

A. 0200

B. 0300

C. 0400

D. 0500

......................................------------------------------------------------

Distracter Analysis: Wide range flux monitors (gamma metrics) are

allowed to substitute for NIS source flux monitors per tech spec 3.9.3 bases.

BUT the gamma metrics do not provide an input to the containment

evacuation alarm or the CNMT audible count instrument - which are

required by admin controls for refueling operations. Candidates are required

to know Tech Spec LCOs with immediate action statements.

A. Incorrect: one NIS SR monitor is required to provide input to

containment evacuation alarms

Plausible: one gamma metrics monitor is operable

B. Incorrect: administratively, one SR is required for the audible alarm

Plausible: gamma metrics monitors can substitute for NIS SR

channel for monitoring neutron flux.

C. Correct: This restores one NIS SR channel the operable gamma

metrics channels more than satisfy Tech Spec 3.9.3

D. Incorrect: can start refueling at 0400

Ques_897 For Official Use Only Page 151

Question #85 McGuire Nuclear Station RO Exam

Plausible: if the candidate does not know that gamma metrics

monitors can be substituted for NIS SR monitors to comply with

Tech Specs

Level: RO Only

KA: SYS 015 K3.03 (2.7/3.4)

Lesson Plan Objective: ENB SEQ 21

Source: New

Level of knowledge: comprehension

References:

1. AP- 16 Background Document pages 4 and 6

2. Tech Spec 3.9.3 and Bases

3. OP-MC-IC-ENB pages 19, 21, 23, 41,43

For Official Use Only Page 152

Ques-897

Question #86 McGuire Nuclear Station RO Exam

Bank Question: 898 Answer. C

I Pt(s) Which one of the following electrical sources provides control and indication

power to the RESET/RETRANSFER switches for the lower containment

ventilation air handling units (AHUs)?

A. Vital 125 VDC

B. The normal power supply

C. The emergency power supply

D. The power supply providing power to the AHU

.................................-----------------------------------------------------...

Distracter Analysis:

A. Incorrect: Power supplied from emergency power supply

Plausible: many controls are DC powered

B. Incorrect: Power supplied from emergency power supply

Plausible: If candidate believes normal should be the logical choice

C. Correct: Emergency power supply is the source of power.

D. Incorrect: Power supplied from emergency power supply

Plausible: Logical that transfer power comes from the selected

source.

Level: RO&SRO

KA: SYS 022 K2.01 (3.0/3.1)

Lesson Plan Objective: CNT-VUL SEQ 6

Source: New

Level of knowledge: memory

References:

1. OP-MN-CNT-VUL page 29

Ques_898 For Official Use Only Page 153

Question #87 McGuire Nuclear Station RO Exam

Bank Question: 899 Answer: D

I Pt(s) Unit I is at full power. Given the following events and conditions:

  • 1NC-34A (PzR PORv) was leaking has been isolated in accordance with

Technical Specifications.

  • NC pressure is 2345 psig.
  • INCV-36B (PZR PORV) is slightly open.
  • Master controller output is stuck at 83%.

Which one of the following statements correctly describes when INC-36B will

automatically close and if it does not, what action is required to isolate the

valve?

A. INC-36B will not close. The operator must close the block valve by

taking the control switch to "CLSD".

B. INC-36B will not close. The operator must close the block valve by

taking the control switch to "OVERRIDE".

C. INC-36B will close when pressure decreases to 2315 psig. If

necessary to close the block valve, take the control switch to

"CLSD".

D. 1NC-36B will close when pressure decreases to 2315 psig. If

necessary to close the block valve, take the control switch to

"OVERRIDE".

S------------------------------------

Distracter Analysis:

A. Incorrect: INCV-36B will close and must take the block valve to

override.

Plausible: if the candidate does recognize the multiple block valve

protection and assumes control for INV-36B is off the pressure

controller.

B. Incorrect: INC-36B will close.

Plausible: if the candidate does not realize that control for INV-36 B is

not from the pressure controller.

C. Incorrect: must take the block valve to override.

alve

Plausible: if the candidate does not recognize the multiple block va

protection.

D. Correct:

Level: RO&SRO

KA: APE 008AA1.07 (4.0/4.2)

Ques_899 For Official Use Only Page 154

Question #87 McGuire Nuclear Station RO Exam

Lesson Plan Objective: AP- I I SEQ 2

Source: New

Level of knowledge: comprehension

References:

1. AP- II background document page 5

Ques_899 For Official Use Only Page 155

Question #88 McGuire Nuclear Station RO Exam

Bank Question: 900 Answer. B

I Pt(s) The operator has just opened IVI-820 (VI SuPPLY TO VS CONTROL). The

switch is left in the OPEN position.

Which one of the following statements correctly describes the adverse effect

of leaving the CLOSE/A UTO/OPEN switch in the OPEN position?

A. The valve will not close on decreasing VI pressure.

B. The valve closes on decreasing VI pressure, but immediately

reopens if pressure increases above 90 psig.

C. The valve will not close on decreasing VS pressure.

D. The valve closes on decreasing VS pressure, but immediately

reopens if pressure increases above 90 psig.


-----

-- ------

Distracter Analysis:

A. Incorrect: The valve will close.

Plausible: if the candidate believes that if not in auto, the valve will

not respond to decreasing pressure.

B. Correct: the opening will not be under the control of the operator.

C. Incorrect: The valve will close on low VI pressure.

Plausible: if the candidate confuses which system is being protected,

and believes that if not in auto, the valve will not respond to

decreasing pressure.

D. Incorrect: The valve responds to VI pressure.

Plausible: candidate believes that the valve will receive an open

signal once it is fully closed

Level: RO&SRO

KA: SYS 079A2.01 (2.9/3.2)

Lesson Plan Objective: SS-VI SEQ 7

Source: New

Level of knowledge: memory

References:

1.OP-MC-SS-VL page 67

For Official Use Only Page 156

Ques_900

Question #89 McGuire Nuclear Station RO Exam

Bank Question: 902 Answer: A

I Pt(s) Unit 2 is at full power preparing to shutdown for refueling. Given the

following events and conditions:

  • Pressurizer level is on program and in automatic.
  • The controlling pressurizer level transmitter fails at its current output.
  • No operator action is taken.

Which one of the following statements correctly describes the system

response as plant load is reduced?

A. Charging flow decreases

Letdown isolates

Pressurizer heaters turn off

B. Charging flow increases

Pressurizer heaters energize

Pressurizer level increase to the trip setpoint

C. Charging flow decreases

Letdown will not isolate

Pressurizer level decreases until the pressurizer is empty

D. Charging flow increases

Pressurizer heaters will not energize

Pressurizer level increases to the trip setpoint.


Distracter Analysis: As load is reduced, Tave will decrease, Program

Pressurizer level will decrease. The system will see the controlling channel

maintaining a high level and decrease charging in an effort to reduce level.

Actual level will decrease. The backup channel will decrease and at 17%,

letdown will isolate and heaters will de energize.

A. Correct:

B. Incorrect: charging flow will decrease.

Plausible: candidate believes charging flow will increase in an effort

to maintain the higher level

C. Incorrect: letdown will isolate from the bakup channel.

Plausible: if the candidate believes the low level interlock will not be

satisfied only from the controlling channel.

D. Incorrect: charging flow will decrease.

Plausible: candidate believes charging flow will increase to

maintain the higher level

Ques_9O2 For Official Use Only Page 157

Question #89 McGuire Nuclear Station RO Exam

Level: RO&SRO

KA: APE 028 AA2.02 (3.4/3.8)

Lesson Plan Objective: PS-ILE SEQ 12

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-PS-ILE page 33 (Figure 7.2)

Ques_902 For Official Use Only Page 158

Question #90 McGuire Nuclear Station RO Exam

Bank Question: 903 Answer. B

I Pt(s) Why is it important for the source range high voltage to be properly set?

A. To ensure that the detector operates in the ionization region

where the flow of detector current reflects exactly the flow of

ionizing radiation and secondary multiplication is prevented.

B. To ensure the detector operates in the proportional region where

secondary ionizations cause gas multiplication to occur.

C. To ensure that detector operates in the recombination region

where the recombination effect prevents the smaller pulses from

gamma interactions from being detected.

D. To ensure that the detector operates in the Geiger Muller region

where each ionization event results in a complete discharge of the

detector tube.

Distracter Analysis:

A. Incorrect: This describes the ionization range. The SR is a

proportional counter.

Plausible: If the candidate does not understand detector theory or

confuses what region the SR operate in.

B. Correct: SR operates in the proportional region of the detector curve

where gas amplification causes secondary ionizations.

C. Incorrect: This describes the recombination range.

Plausible: Gamma interactions are discriminated by a pulse-height

discriminator circuit. If the candidate does not understand detector

theory or confuses what region the SR operate in.

D. Incorrect: This describes the G-M region.

Plausible: If the candidate is unfamiliar with what region SR

operates in.

Level: RO&SRO

KA: APE 032 AKI.01 (2.5/3.1)

Lesson Plan Objective: IC-ENB SEQ 3

Source: New

Level of knowledge: memory

References:

1. OP-MC-IC-ENB page 17-19

Ques_9O3 For Official Use Only Page 159

Question #91 McGuire Nuclear Station RO Exam

Bank Question: 904 Answer: D

I Pt(s) The unit I operating crew has entered AP-15 (LossOF VITAL ORAUX

CONTROL POWER) due to a loss of I EVDA.

Why will the crew have to diligently monitor containment pressure while

IEVDA is dce-energized?

A. Decreased cooling will increase containment pressure because the

VL and VU system is inoperable.

B. IVQ-IA (CONTAIR REL INSIDEISOm) will fail open on a loss of

power and containment pressure may change rapidly resulting in

a release path.

C. The PRT will slowly pressurize and rupture causing an increase

in containment pressure because of Nitrogen in-leakage.

D. VI system leaks will increase containment pressure because the

VQ system is inoperable.


Distracter Analysis: Loss of DC control power causes IVQ- IA to fail

closed and prevents using the VQ system for an air release to lower

containment pressure. Pressure increases due to VI leaks inside containment.

A. Incorrect: VL and VU systems are operable under these conditions

Plausible: contingency action is to increase cooling flow in an

attempt to cool the containment air mass, slowing the pressure

increase.

B. Incorrect: IVQ-IA will fail closed not open

Plausible: if the candidate does not recognize that this containment

isolation valve always fails closed.

C. Incorrect: N2 will not leak into the PRT

Plausible: loss of DC will cause a loss of power to many valves if

the candidate thinks that a loss of DC control power could cause the

N2 sparging valves to fail open or leak by.

D. Correct: numerous VI leaks inside containment will slowly increase

containment pressure with the VQ system unable to release to the

unit I stack. VQ-1A fails closed due to a loss of power.

Level: RO&SRO

KA: APE 058 AK3.02 (4.0/4.2)

Lesson Plan Objective: AP15 SEQ 3

Source: New

Ques_9o4 For Official Use Only Page 160

Question #91 McGuire Nuclear Station RO Exam

Level of knowledge: memory

References:

1.AP-15 Background Document pages 16, 18, 19

2. AP-15 pages 10, 13, 14

Ques_9O4 For Official Use Only Page 161

Question #92 McGuire Nuclear Station RO Exam

Bank Question: 905 Answer. A

I Pt(s) The selector switches for the 1A and IB Boric Acid pumps are in LOCAL at

the Auxiliary Shutdown Panel (ASP). The operator is starting the IA Boric

Acid pump at the ASP.

Which one of the following statements describes ALL the indication(s) that

the operator has at the ASP indicating that the boric acid pump is running?

A. Red "ON" light LIT.

B. Red "ON" light LIT and pump amps registering.

C. Pump amps registering and boric acid flow indicating when

INV-265B (BORICACID ToNVPuMPS) is opened.

D. Red "ON" light LIT and boric acid flow indicating when INV-265B

is opened.


Distracter Analysis:

A. Correct: Both BA pumps have LOCAL/CR selector switches,

Red/green indicator lights, and start controls on the ASP.

B. Incorrect: There are no pump amps indicators on the ASP.

Plausible: These are normal indications checked when a pump is

started.

C. Incorrect: There is no flow indication on the ASP.

Plausible: NV-265B is controlled (with Red/Green lights) from the

ASP

D. Incorrect: BA flow is not indicated at the ASP

Plausible: This valve can be controlled from the ASP

Level: RO&SRO

KA: APE 068 AAI.19 (3.7/3.9)

Lesson Plan Objective: CP-ASP SEQ 2

Source: New

Level of knowledge: memory

References:

1. OP-MC-CP-ASP page 25, 31

Ques_905 For Official Use Only Page 162

Question #93 McGuire Nuclear Station RO Exam

Bank Question: 906 Answer. B

I Pt(s) A station emergency battery is supplying DC bus loads without a battery

charger online. If the equipment on the DC bus does not change, which one

of the following statements correctly describes a vital battery's discharge rate

(amps) as the battery is expended?

A. The discharge rate will be fairly constant until the design battery

capacity (amp-hours) is exhausted and then will rapidly decrease.

B. The discharge rate will increase steadily until the design battery

capacity is exhausted.

C. The discharge rate will decrease steadily until the design battery

capacity is exhausted.

D. The discharge rate will initially decrease until approximately

50% design capacity had been expended and then increase until

the battery has been exhausted.

Distracter Analysis:

A. Incorrect: The discharge rate increases.

Plausible: This is a typical response for many design systems - If the

candidate does not recall that V= lxR.

B. Correct:

C. Incorrect: The discharge rate increases.

Plausible: If the candidate reverses the effect of decreasing vo Itage

on discharge rate.

D. Incorrect: The discharge rate increases.

Plausible: If the candidate does not understand battery theory.

Level: RO&SRO

KA: EPE 055 EK1.01 (3.3/3.7)

Lesson Plan Objective: EL-EPL SEQ 12/20

Source: New

Level of knowledge: memory

References:

1. OP-MC-EP-EPL pages 65-67

Ques_9O6 For Official Use Only Page 163

Question #94 McGuire Nuclear Station RO Exam

Bank Question: 907 Answer. D

I Pt(s) Unit I is implementing FR-C. I (Response to InadequateCore Cooling).

Given the following events and conditions:

"* P-I I has been blocked.

"* Operators are preparing to open the steam dumps to depressurize intact

steam generators to 110 psig.

What guidance should be given to the operator opening the steam dumps?

A. The steam dumps should be fully opened to depressurize the

S/Gs as quickly as possible.

B. A cooldown rate of less than 100 degrees/hour should be

established to prevent exceeding Tech Spec limits.

C. A cooldown rate of less than 25 degrees/hour should be

established to prevent pressurized thermal shock concerns.

D. The steam dumps should be very slowly opened (<2 psig / see) to

prevent MSIV closure.

Distracter Analysis:

A. Incorrect: The steam dumps should be opened slowly.

Plausible: If the candidate confuses the FR-C guidance with tube

rupture guidance.

B. Incorrect: While TS limits apply, the dumps will be isolated long

before that limit is approached.

Plausible: This is the TS cooldown limit.

C. Incorrect: PTS is not the immediate concern with CETs >1200

degrees.

Plausible: PTS and limiting cooldown are reasonable concerns for

other events.

D. Correct: note in C. I informs the operator that a depressurization rate

of less than 2 psig/second will maintain the MSIVs open.

Level: RO&SRO

KA: EPE 074 EK2.06 (3.5/3.6)

Lesson Plan Objective: EP-FRC SEQ 4

Source: New

Ques_907 For Official Use Only Page 164

Question #94 McGuire Nuclear Station RO Exam

Level of knowledge: memory

References:

1.OP-MC-EP-FRC page 37

2. EP/1/A/5000/FR-C. I page 9

Ques_907 For Official Use Only Page 165

Question #95 McGuire Nuclear Station RO Exam

Bank Question: 908 Answer. C

I Pt(s) Unit I is in mode 6.

A fire has occurred in a charcoal filter in the containment ventilation system.

RP is performing actions necessary to identify the HOT ZONE.

How will the operators identify the HOT ZONE boundaries?

A. Yellow and Magenta ropes

B. Red tape

C. RP tape

D. Yellow tape

Distracter Analysis:

A. Incorrect: RP tape identifies HOT zone boundaries.

Plausible: Y&M rope is used to identify radiation area boundaries,

and RP tape shares those colors.

B. Incorrect: RP tape is used.

Plausible: Red tape marks the WARM zone boundaries.

C. Correct: The Hot zone is identified by RP tape

D. Incorrect: RP tape is used.

Plausible: Yellow tape marks the COLD zone boundarie .S.

Level: RO&SRO

KA: SYS 067 G2.3.10 (2.9/3.3)

Lesson Plan Objective: None

Source: New

Level of knowledge: memory

References:

1. RP/O/A/5700/025 enclosure 4.4

Ques_908 For Official Use Only Page 166

Question #96 McGuire Nuclear Station RO Exam

Bank Question: 909 Answer. A

I Pt(s) Unit I is at full power, steady state. Given the following events and

conditions:

  • 20 minutes later, the OSM determines that the declaration of an Unusual

Event is warranted.

  • 5 minutes after declaring the Unusual Event, the Emergency Notification

form is completed, and the OSM directs an operator to make the State

notification.

From the time of completion of the notification form, how much time does

the operator have to make the State notification?

A. 10 minutes

B. 15 minutes

C. 55 minutes

D. 60 minutes


Distracter Analysis:

A. Correct: 15 minutes from the time of declaration.

B. Incorrect: 10 minutes to the deadline.

Plausible: If the candidate believes the 15 minute deadline starts with

the completion of the form.

C. Incorrect: 10 minutes to the deadline.

Plausible: If the candidate believes that the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> NRC deadline

applies to State notification, and that it starts from the time of event

declaration.

D. Incorrect: 10 minutes to the deadline.

Plausible: If the candidate believes that the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> deadline starts

with the completion of the form.

Level: RO Only

KA: G2.4.32 (3.3/3.5)

Lesson Plan Objective: EP-EAL SEQ 4

Source: New

Level of knowledge: memory

References:

1. RP/0/A/5700/000 enclosure 4.9

Ques_909 For Official Use Only Page 167

Question #97 McGuire Nuclear Station RO Exam

Bank Question: 910 Answer: C

I Pt(s) Which one of the following procedures would be used to bring Unit I to cold

shutdown after dealing with a fire that results in a loss of plant control from

the control room?

A. AP/1/5500/A/24, (Loss of Plant Control Due to Fire)

B. OP/0/A/6100/20, (OperationalGuidelinesFollowing Fire in

Auxiliary Building or Vital Area)

C. OP/0/A/6100/21, (Shutdown Outside the Control Room Following

a Fire)

D. OP/1/A/6100/04, (Shutdown Outside the Control Room From Hot

Standby to Cold Shutdown)


Distracter Analysis:

A. Incorrect: this brings the unit to hot standby

Plausible: candidate believes this procedure will bring the unit to

mode 5.

B. Incorrect: this procedure picks up from AP/24 and takes steps to

prepare the unit for hot shutdown followed by cold shutdown after a

fire in the aux building or vital area

Plausible: candidate unfamiliar with the procedure

C. Correct: procedure provides the steps required to achieve cold

shutdown following a fire that renders the control room unusable.

D. Incorrect: used when the control room is uninhabitable.

Plausible: this procedure does bring the unit to cold shutdown, but

not applicable if there has been damage to vital equipment due to fire.

Level: RO&SRO

KA: G2.4.25 (2.9/3.4)

Lesson Plan Objective: SS SEQ 4

Source: New

Level of knowledge: memory

References:

1. OP-MN-CP-SS pages 11, 13, 25

For Official Use Only Page 168

Ques_910

Question #98 McGuire Nuclear Station RO Exam

Bank Question: 911 Answer. B

I Pt(s) The crew has verified natural circulation in ES-0. I (Reactor Trip Response)

based on decreasing core exit thermocouple readings and subcooling > 0 'F.

Ten minutes later, the operator notes that the thermocouple input to both

plasma displays is malfunctioning.

Which one of the following correctly describes a valid indication that natural

circulation is continuing?

A. S/G saturation temperatures are decreasing and REACTOR VESSEL

UR LEVEL indication is greater than 100 %.

B. S/G pressures are decreasing and TC,Id is at S/G saturation

temperature.

C. S/G pressures are decreasing and REACTOR VESSEL D/P indication

is greater than 100%.

D. S/G pressure is at saturation pressure for ToId and REACTOR

VEssEL D/P indication is greater than 100 %.


Distracter Analysis:

A. Incorrect: There is no indication of coupling between primary and

secondary.

Plausible: These are important indications during natural circulation.

B. Correct:

C. Incorrect: RVLIS is unavailable during natural circulation.

Plausible: S/G pressure decreases during natural circulation and

RVLIS is one of the other plasma display indications.

D. Incorrect: RVLIS is unavailable during natural circulation.

Plausible: S/G pressure will remain close to saturation for Tcold

during natural circulation and RVLIS is one of the other plasma

display indications.

Level: RO&SRO

KA: SYS 017 K3.01 (3.5/3.7)

Lesson Plan Objective: EP-EO SEQ 6

Source: New

Level of knowledge: memory

For Official Use Only Page 169

Ques_911

Question #98 McGuire Nuclear Station RO Exam

References:

1. OP-MC-EP-EO pages 117, 123

2. ES-0.1 page 15

3. ES-O. I Enclosure 2 page 31

Ques_911 For Official Use Only Page 170

Question #99 McGuire Nuclear Station RO Exam

Bank Question: 913 Answer: D

I Pt(s) Unit 1 was conducting a reactor start up immediately following a refueling

outage. Given the following conditions and events:

"* NCTav -551°F

"* The reactor is critical at 2x10 6amps in the intermediate range

"* A rod control failure results in control rods being withdrawn from 55 steps

to 75 steps in bank C before the withdrawal was stopped

"* The reactor is not tripped

"* Steam dumps are in manual due an unrelated failure

If the steam dump position is not adjusted, what is the final value of Tac after

the reactivity transient has stabilized?

REFERENCES PROVIDED: DatabookENCL 4.3

Table 6.3.B, Table 6.6, Table 6.10

A. T8..will decrease to less than 550.5 OF

B. T.ve will remain essentially unchanged between 550.5 and 551.5 IF

C. T,,e will increase to between 551.6 and 554.0 0 F

D. Tave will increase to greater than 554.1 OF


.-------------------

Distracter Analysis: Integral Rod Worth (IRW) is defined as the total amount

of reactivity added by the rods due to their position in the core (Rod Defect).

IRW is zero (0) when rods are fully withdrawn. The addition of positive

reactivity will cause the NCS Tave to increase to offset the positive reactivity

with negative reactivity. The increase in Tave will increase steam pressure by

-50 psig which is why the steam dumps must remain in a constant position to

avoid compensating for the change.

55 steps = 1812 PCM - Table 6.3B

65 steps = 1719PCM

APCM = + 93 PCM - change in PCM from rod withdrawal

At 0 EFPD and 550 0F, PCM/ppmb - 6.96 PCM/ppm - from Table 6.10 at 0

EFPD

93 PCM / 6.96 PCM/ppm - 13.3 ppm - change in reactivity

1372 ppm -13.3 ppm - 1358.7 ppm - 557 'F from Table 6.6 at 0 EFPD bumup

A. Incorrect: Temperature increase to 557 'F

Plausible: If the candidate reverses the logic and applies the

temperature defect correction in the opposite direction

Ques_913 For Official Use Only Page 171

Question #99 McGuire Nuclear Station RO Exam

B. Incorrect: Temperature increase to 557 'F

Plausible: If the candidate thinks that another mechanism will

compensate for the positive reactivity addition or does not recognize

that the reactor is above the point of adding heat.

C. Incorrect: Temperature increase to 557 'F

Plausible: If the candidate makes a mistake on the calculation or uses

the wrong curve. Temperature is increasing a small amount - but not

enough due to the rod worth added.

D. Correct: Temperature increase to 557 'F

Level: RO&SRO

KA: APE 001 AK1.21 (2.9/3.2)

Lesson Plan Objective: RT-RCO SEQ 23

Source: New

Level of knowledge: analysis

References:

1. OP-MN-RT-RCO page 51

2. OP-MN-RT-RCO page 59 (figure 7.2)

3. OP/l/A/6100/022 Encl 4.3

Table 6.3B - PROVIDED

Table 6.6 - PROVIDED

Table 6. 10 - PROVIDED

4. OP-MC-IC-ENB page 49

Ques_913 For Official Use Only Page 172

Question #100 McGuire Nuclear Station RO Exam

Bank Question: 914.1 Answer. A

I Pt(s) Unit I was conducting a power ascension to 100%. Given the following

events and conditions:

  • Reactor power = 10%

S1IA S/G water level = 40% for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />

SI A S/G has been fed through the CA nozzles

  • Feedwater flow has been not been initiated through the CF nozzles

Which one of the following statements correctly describes the required

operational limitation on the CF nozzles to prevent water hammer in the IA

S/G?

A. Reduce power below 1% and forward purge the CF nozzle prior

to initiating feedwater flow through the CF nozzles.

B. Prior to exceeding 15% power, initiate feedwater flow through

the CF bypass valves for one hour to warm up the gooseneck.

C. Increase IA S/G level to greater than 45% and immediately

initiate feedwater flow the CF nozzles.

D. Prior to exceeding 25% power, initiate feedwater flow through

the CF nozzles.

--- ---------------------- ...------ . .-.-.-.-.----.........-------------


-- ----

Distracter Analysis:

A. Correct: to prevent water hammer.

B. Incorrect: This will cause water hammer in the gooseneck

Plausible: 15% is the limit for feed flow through the CF bypass

valves. The one hour requirement is for the amount of time that the

S/G level must be < 45% before a forward purge and power reduction

is required.

C. Incorrect: The gooseneck has dried out and must be forward flushed

to prevent water hammer. S/G must be

Plausible: IfS/G water level had been > 45%, feedwater flow could

have been initiated as long as reactor power was < 25%.

D. Incorrect: The gooseneck has dried out and must be forward flushed

to prevent water hammer.

Plausible: These are the operating limits to prevent water hammer if

the S/G level was > 45% and the gooseneck was not dry.

Level: RO&SRO

KA: SYS 059 KI.03 (3.1/3.3)

Ques_914.1 For Official Use Only Page 173

Question #100 McGuire Nuclear Station RO Exam

Lesson Plan Objective: CF-CF Seq 11, 22

Source: New

Level of knowledge: comprehension

References:

1. OP-MC-CF-CF pages 29, 31, 47

2. OP/1/A/6250/001 page 1

References:

1. OP-MC-CF-CF pages 29, 31, 47

2. OP/1/A/6250/001 page 1

For Official Use Only Page 174

Ques_914.1