February 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2
ML020840374
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/13/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020840374 (9)


Text

Duke Power Duke Power. 526 South Church Street Palk~ wer.RO. Box 1006 A Dk E-gy C*pay Charlotte, NC 28201-1006 March 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-February, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of February, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

ce~rel{k)

ASi er imme y, Manager Nuc ear BusiŽn ss Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation (,V Dottie Sherman, ANI Library /

American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector

Document Control Desk U.S. NRC - McGuire bxc:

C. J. Thomas (MG01RC)

RGC Site Licensing File ELL (ECO50)

Operating Data Report Docket No. 50-369 Date March 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 1
2. Reporting Period: February 1, 2002 - February 28, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000 1144 MVA * .90 power
6. Maximum Dependable Capacity (Gross MWe):

factor per Page iii,

7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative 672.0 1416.0 177480.0

11. Hours in Reporting Period 672.0 1416.0 136347.0
12. Number of Hours Reactor was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 672.0 1416.0 135096.7
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 2290779 15728912 445380658
16. Gross Thermal Energy Generated (MWH) 806200 1698951 149752701
17. Gross Electrical Energy Generated (MWH) 778005 1640781 143455791
18. Net Electrical Energy Generated (MWH) 100.0 100.0 76.1
19. Unit Service Factor 100.0 100.0 76.1
20. Unit Availability Factor 105.2 105.3 71.2
21. Unit Capacity Factor (Using MDC Net) 98.1 98.2 68.5
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 9.7
23. Unit Forced Outage Rate
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 3/13/2002

Page: l of t UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: March 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: February, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 3/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: September 2002
3. Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: March 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No. 50-370 Date March 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 2
2. Reporting Period: February 1, 2002 - February 28, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power factor per Page iii,
7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 672.0 1416.0 157776.0
12. Number of Hours Reactor was Critical 527.0 1271.0 129089.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 527.0 1271.0 127862.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1765305 20029535 437420526
17. Gross Electrical Energy Generated (MWH) 618881 1507261 146803800
18. Net Electrical Energy Generated (MWH) 595590 1453413 140922692
19. Unit Service Factor 78.4 89.8 81.0
20. Unit Availability Factor 78.4 89.8 81.0
21. Unit Capacity Factor (Using MDC Net) 80.6 93.3 79.1
22. Unit Capacity Factor (Using DER Net) 75.1 87.0 75.7
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 3/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: March 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: February, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

1 02/22/02 S 145.00 C 1 END-OF-CYCLE 14 REFUELING OUTAGE Summary:

McGuire unit 2 began the month of February operating at approximately 100% full power. The unit began coasting down to end-of-cycle 14 refueling outage on 02/16/02 at 1000.

The unit held at 98% power from 1300 to 02/18/02 at 0028. The unit continued load decrease and held at 97% power from 02/18/02 at 0230 to 02/22/02 at 1200. The unit commenced load decrease to begin the end-of-cycle 14 refueling outage. The unit was taken off-line 02/22/02 at 2300 to begin end-of-cycle 14 refueling outage. The unit was in the refueling outage the remainder of the month.

(1) Reason (2) Method E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram A - Equipment failure (Explain)

F - Administrative 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 3/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: Currently Refueling
3. Scheduled restart following refueling: March 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
9. Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: March 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JANUARY 2002

1. Personnel Exposure The total station liquid release for JANUARY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for JANUARY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.