ML023540411

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Duke Energy Corporation
ML023540411
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/13/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023540411 (9)


Text

M Duke f

Powere A Duke Energy Company Duke Power 526 South Church Street PO Box 1006 Charlotte, NC 28201-1006 December 13, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-November, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of

November, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, 5ký Iah.eý ý

.P4-,

Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L.

A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi, Project Manager

USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers

<2Ž Scott Schaeffer, Senior Resident Inspector

Document Control Desk U.S.

NRC -

McGuire bxc:

C.

J.

Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

November 1, 2002 - November 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 December 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 720.0
12. Number of Hours Reactor was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 720.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2453092
17. Gross Electrical Energy Generated (MWH) 859919
18. Net Electrical Energy Generated (MWH) 829553
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 104.7
22. Unit Capacity Factor (Using DER Net) 97.6
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

YTD 8016.0 7350.5 0.0 7299.9 0.0 80943838 8557468 8239448 91.1 91.1 93.4 87.1 1.1 Cumulative 184080.0 142281.5 0.0 140980.5 0.0 510595584 156611218 150054458 76.6 76.6 71.9 69.1 9.4

25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: December 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2002 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-12/13/2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: March 2004

3.

Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool. 1107

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: December 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

November 1, 2002 -November 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 December 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:
11. Hours in Reporting Period
12. Number of Hours Reactor was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

This Month 720.0 720.0 0.0 720.0 0.0 2452141 856100 824789 100.0 100.0 104.1 97.1 0.0 YTD 8016.0 7224.0 0.0 7197.1 0.0 105265426 8393582 8078508 89.8 89.8 91.6 85.4 2.3 Cumulative 1643760 135042.8 0.0 133789.0 0.0 522656417 "153690121 S147547787 81.4 81.4 79.5 76.1 5.5

25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/13/2002

Page: 1 of t UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: December 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November, 2002 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-12/13/2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: September 2003

3.

Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a techmcal specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: December 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT OCTOBER 2002

1.

Personnel Exposure The total station liquid release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.