Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20240102024-03-13013 March 2024 Comprehensive Engineering Team Inspection Report 05000369/2024010 and 05000370/2024010 IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 2024-08-26
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0521003182005-07-14014 July 2005 June 2005 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, and Catawba Nuclear Station ML0517902042005-06-14014 June 2005 May 2005 Monthly Operating Report for Catawba, McGuire and Oconee Nuclear Stations ML0514403692005-05-16016 May 2005 April 2005 Monthly Operating Report for Oconee, McGuire & Catawba Stations ML0511003162005-04-13013 April 2005 March 2005 Monthly Operating Reports for Oconee McGuire and Catawba ML0508105952005-03-15015 March 2005 February 2005 Monthly Operating Report for Oconee, McGuire & Catawba Stations ML0505405242005-02-15015 February 2005 January 2005 Monthly Operating Report for Oconee McGuire and Catawba Nuclear Stations ML0502402402005-01-13013 January 2005 December 2004 Monthly Operating Report for Oconee McGuire and Catawba Nuclear Stations ML0436403082004-12-15015 December 2004 November 2004 Monthly Operating Report for Oconee Units 1 2 and 3 McGuire Units 1 and 2 and Catawba Units 1 and 2 ML0432804102004-11-15015 November 2004 October 2004 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, & Catawba Nuclear Station ML0429405112004-10-14014 October 2004 September 2004 Monthly Operating Report for Oconee Units 1 2 & 3 and McGuire & Catawba Units 1 & 2 ML0426600702004-09-15015 September 2004 August 2004 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, and Catawba Nuclear Station ML0420402632004-07-15015 July 2004 June 2004 Monthly Operating Report for Oconee, Units 1, 2 and 3, McGuire, Units 1 and 2 & Catawba, Units 1 and 2 ML0414103042004-05-13013 May 2004 April 2004 Monthly Operating Report for Oconee, McGuire and Catawba Nuclear Power Plants ML0411203552004-04-14014 April 2004 March 2004 Monthly Operating Report for Oconee, Units 1, 2 & 3, McGuire, Units 1 & 2, & Catawba, Units 1 & 2 ML0408305882004-03-15015 March 2004 February 2004 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations ML0405503282004-02-16016 February 2004 January 2004 Monthly Operating Report for Oconee McGuire and Catawba Nuclear Stations ML0402303352004-01-15015 January 2004 December 2003 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations ML0335703982003-12-15015 December 2003 November 2003 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations ML0332904342003-11-17017 November 2003 October 2003 Monthly Operating Reports for Oconee McGuire and Catawba Nuclear Stations ML0329406282003-10-14014 October 2003 September 2003 Monthly Operating Report for Oconee Units 1, 2 & 3 and McGuire & Catawba, Units 1 & 2 ML0326711292003-09-15015 September 2003 August 2003 Monthly Operating Report for Oconee, Units 1, 2 & 3, McGuire and Catawba, Units 1 & 2 ML0328105852003-09-0202 September 2003 July 2003 Monthly Operating Report for Oconee McGuire & Catawba ML0321205172003-07-17017 July 2003 June 2003 Monthly Operating Report for Oconee, McGuire and Catawba ML0314105042003-05-15015 May 2003 April 2003 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2 ML0311203822003-04-15015 April 2003 March 2003 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2 ML0307903622003-03-13013 March 2003 February 2003 Monthly Operating Report for McGuire, Units 1 & 2 ML0305506842003-02-13013 February 2003 January 2003 Monthly Operating Report for McGuire Nuclear Station Units 1 & 2 ML0302204402003-01-13013 January 2003 December 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2 ML0235404112002-12-13013 December 2002 November 2002 Monthly Operating Report for Duke Energy Corporation ML0232501802002-11-14014 November 2002 October 2002 Monthly Operating Report for McGuire Nuclear Station & Revision 1 of Monthly Refueling Information Page for McGuire Unit 1 for Month of September 2002 ML0229603212002-10-15015 October 2002 September 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2 ML0226305352002-09-13013 September 2002 August 2002 Monthly Operating Report for McGuire Units 1 & 2 ML0223301682002-08-14014 August 2002 July 2002 Monthly Operating Report for McGuire Units 1 & 2 ML0219804992002-07-11011 July 2002 June 2002 Monthly Operating Report for McGuire Units 1 & 2 ML0217204292002-06-13013 June 2002 May 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2 ML0215504062002-05-15015 May 2002 April 2002 Monthly Operating Report for McGuire Nuclear Station Units 1 & 2 ML0211403672002-04-15015 April 2002 March 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2 ML0208403742002-03-13013 March 2002 February 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2 ML0207804002002-02-14014 February 2002 January 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2 ML0204203402002-01-15015 January 2002 December 2001 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2 2005-07-14
[Table view] |
Text
Duke Energy Corporation P Duke 526 South Church Street 9 Energy. P.O. Box 1006 Charlotte, NC 28201-1006 February 13, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-January, 2003 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of January, 2003.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmey, Manager Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector
Document Control Desk U.S. NRC - McGuire bxc:
C. J. Thomas (MG01RC)
RGC Site Licensing File ELL (EC050)
Operating Data Report Docket No. 50-369 Date February 13,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: McGuire 1
- 2. Reporting Period: January 1, 2003 - January 31, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- 5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 744.0 744.0 185568.0
- 12. Number of Hours Reactor was Critical 744.0 744.0 143769.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 744.0 744.0 142468.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2489866 8219177 465124432
- 17. Gross Electrical Energy Generated (MWH) 874432 874432 158377090
- 18. Net Electrical Energy Generated (MWH) 844406 844406 151760249
- 19. Unit Service Factor 100.0 100.0 76.8
- 20. Unit Availability Factor 1000 1000 76.8
- 21. Unit Capacity Factor (Using MDC Net) 103.2 103.2 72.1
- 22. Unit Capacity Factor (Using DER Net) 96.2 96.2 69.3
- 23. Unit Forced Outage Rate 0.0 0.0 9.3
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 2/13/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire 1 DATE: February 13,2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C - 2/13/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: McGuire Unit I
- 2. Scheduled next refueling shutdown: March 2004
- 3. Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1107
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: February 13, 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No. 50-370 Date February 13,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: McGuire 2
- 2. Reporting Period: January 1, 2003- January 31, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- 5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 744.0 744.0 165864.0
- 12. Number of Hours Reactor was Critical 744.0 744.0 136530.8
- 13. Reactor Reserve Shutdown Hours 0.0 00 0.0
- 14. Hours Generator On-Line 744.0 7440 135277.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 00
- 16. Gross Thermal Energy Generated (MWH) 2463007 10682184 454870544
- 17. Gross Electrical Energy Generated (MWH) 863537 863537 155419642
- 18. Net Electrical Energy Generated (MWH) 832889 832889 149215683
- 19. Unit Service Factor 100.0 100.0 81.6
- 20. Unit Availability Factor 100.0 100.0 81.6
- 21. Unit Capacity Factor (Using MDC Net) 101.8 101.8 79.7
- 22. Unit Capacity Factor (Using DER Net) 94.9 94.9 76.2
- 23. Unit Forced Outage Rate 0.0 0.0 5.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 2/13/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: February 13, 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: Januarv, 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown RMX Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C - 2/13/2003
MONTHLY REFUELING INFORMATION RPQUEST
- 1. Facility name: McGuire Unit 2
- 2. Scheduled next refueling shutdown: September 2003
- 3. Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1093 (c) in the ISFSI: 192
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: February 13, 2003 Name of
Contact:
R. A Williams Phone: (704) - 382-5346
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT DECEMBER 2002
- 1. Personnel Exposure The total station liquid release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.