September 2002 Monthly Operating Report for McGuire Nuclear Station, Units 1 and 2
ML022960321
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/15/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022960321 (9)


Text

M Duke t

Power A Duke Energy Company Duke Power 526 South Church Street PO. Box 1006 Charlotte, NC 28201-1006 October 15, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-September, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of September, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L.

A. Reyes, Regional Administrator

USNRC, Region II Frank Rinaldi, Project Manager
USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector

Document Control Desk U.S.

NRC -

McGuire bxc:

C.

J.

Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

September 1, 2002 - September 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 October 15,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 7200
12. Number of Hours Reactor was Critical 310.8
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 310.8
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 1037628
17. Gross Electrical Energy Generated (MWH) 350180
18. Net Electrical Energy Generated (MWH) 334819
19. Unit Service Factor 43.2
20. Unit Availability Factor 43.2
21. Unit Capacity Factor (Using MDC Net) 42.3
22. Unit Capacity Factor (Using DER Net) 39.4
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 6551.0 6079.9 0.0 6073.5 0.0 68491473 7142125 6881195 92.7 92.7 95.5 89.0 1.1 Cumulative 182615.0 141011.0 0.0 139754.1 0.0 498143219 155195875 148696205 76.5 76.5 71.8 69.0 9.5 Achieved 3A - 10/15/2002

Page: l of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: October 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: September, 2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

2 09/13/02 S

409.20 C

1 END OF CYCLE 15 REFUELING OUTAGE Summary:

McGuire unit I began the month of September operating at approximately 100% power until 09/05/02 at 0400 when the unit began phase II T-AVG coastdown to end-of-cycle 15 refueling outage. On 09/13/02 at 1500 the unit ended the coastdown and began decreasing power to end-of-cycle 15 refueling outage. The unit was taken offline on 09/13/02 at 2248 to begin end-of-cycle 15 refueling outage. The unit remained in the end-of-cycle 15 refueling outage the remainder of the month (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 10/15/2002 I

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: September 2002

3.

Scheduled restart following refueling: Currently Refueling THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1205

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: October 15, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

September 1, 2002 - September 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 October 15,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 720.0
12. Number of Hours Reactor was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 720.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2454066
17. Gross Electrical Energy Generated (MWH) 837312
18. Net Electrical Energy Generated (MWH) 804973
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 101.6
22. Unit Capacity Factor (Using DER Net) 94.7
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

YTD 6551.0 5759.0 0.0 5732.1 0.0 87821681 6663648 6412577 87.5 87.5 89.0 83.0 2.9 Cumulative 162911.0 133577.8 0.0 132324.0 0.0 505212672 151960187 145881856 81.2 81.2 79.3 75.9 5.6

25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 10/15/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: October 15. 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: September, 2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-10/15/2002

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: September 2003

3.

Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: October 15, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT AUGUST 2002

1.

Personnel Exposure The total station liquid release for AUGUST has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for AUGUST has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

I I ?

.