July 2002 Monthly Operating Report for McGuire Units 1 & 2
ML022330168
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/14/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022330168 (9)


Text

S Duke Duke Power 526 South Church Street RO. Box 1006 A Dkk E-, C Charlotte, NC 2820 1-1006 August 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-July, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of July, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector j'*9

Document Control Desk U.S. NRC - McGuire bxc:

C. J. Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No. 50-369 Date August 14,2002 Completed By Roper Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 1
2. Reporting Period: July 1, 2002 -July 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000 1144 MVA * .90 power
6. Maximum Dependable Capacity (Gross MWe):

factor per Page iii,

7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative 744.0 5087.0 181151.0

11. Hours in Reporting Period 744.0 5025.1 139956.2
12. Number of Hours Reactor was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 744.0 5018.7 138699.3
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 2535696 53858929 483510675
16. Gross Thermal Energy Generated (MWH) 857814 5933388 153987138
17. Gross Electrical Energy Generated (MWH) 826149 5719485 147534495
18. Net Electrical Energy Generated (MWH) 100.0 98.7 76.6
19. Unit Service Factor 100.0 98.7 76.6
20. Unit Availability Factor 100.9 102.2 71.8
21. Unit Capacity Factor (Using MDC Net) 94.1 95.3 69.0
22. Unit Capacity Factor (Using DER Net) 0.0 1.3 9.6
23. Unit Forced Outage Rate
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 8/14/2002

Page: 4 of 7 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: August 14, 2002 COMPLETED BY: Rogzer Williams TELEPHONE: 704-382-5346 REPORT MONTH: July. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram A - Equipment failure (Explain)

F - Administrative 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C- 8/14/2002

MONTHLY REFIJELING INFORMATION REOUEST

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: September 2002
3. Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be'?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --__
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: August 14, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No. 50-370 Date August 14,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 2
2. Reporting Period: July 1, 2002 - July 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000 1144 MVA * .90 power
6. Maximum Dependable Capacity (Gross MWe):

factor per Page iii,

7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative 744.0 5087.0 161447.0

11. Hours in Reporting Period 744.0 4329.7 132148.5
12. Number of Hours Reactor was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 744.0 4311.6 130903.4
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 2533946 68373251 485764242
16. Gross Thermal Energy Generated (MWH) 859588 5029586 150326125
17. Gross Electrical Energy Generated (MWH) 827840 4842618 144311897
18. Net Electrical Energy Generated (MWH) 100.0 84.8 81.1
19. Unit Service Factor 100.0 84.8 81.1
20. Unit Availability Factor 101.2 86.5 79.2
21. Unit Capacity Factor (Using MDC Net) 94.3 80.7 75.8
22. Unit Capacity Factor (Using DER Net) 0.0 2.9 5.6
23. Unit Forced Outage Rate
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 8/14/2002

Page: 5 of 7 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: August 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: July, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 8/14/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: September 2003
3. Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action. and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: __ --
9. Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: August 14, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JUNE 2002

1. Personnel Exposure The total station liquid release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.