July 2002 Monthly Operating Report for McGuire Units 1 & 2
ML022330168
Person / Time
Site: McGuire, Mcguire  
Issue date: 08/14/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022330168 (9)


Text

S Duke Duke Power 526 South Church Street RO. Box 1006 A Dkk E-, C Charlotte, NC 2820 1-1006 August 14, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-July, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of July, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L.

A. Reyes, Regional Administrator

USNRC, Region II Frank Rinaldi, Project Manager
USNRC, ONRR INPO Records Center Ms.

Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector j'*9

Document Control Desk U.S.

NRC -

McGuire bxc:

C.

J.

Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

July 1, 2002 -July 31, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 August 14,2002 Roper Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2535696
17. Gross Electrical Energy Generated (MWH) 857814
18. Net Electrical Energy Generated (MWH) 826149
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 100.9
22. Unit Capacity Factor (Using DER Net) 94.1
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 5087.0 5025.1 0.0 5018.7 0.0 53858929 5933388 5719485 98.7 98.7 102.2 95.3 1.3 Cumulative 181151.0 139956.2 0.0 138699.3 0.0 483510675 153987138 147534495 76.6 76.6 71.8 69.0 9.6 Achieved 3A - 8/14/2002

Page: 4 of 7 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: August 14, 2002 COMPLETED BY: Rogzer Williams TELEPHONE: 704-382-5346 REPORT MONTH: July. 2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-8/14/2002

MONTHLY REFIJELING INFORMATION REOUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: September 2002

3.

Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be'?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: August 14, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

July 1, 2002 - July 31, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 August 14,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2533946
17. Gross Electrical Energy Generated (MWH) 859588
18. Net Electrical Energy Generated (MWH) 827840
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 101.2
22. Unit Capacity Factor (Using DER Net) 94.3
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 5087.0 4329.7 0.0 4311.6 0.0 68373251 5029586 4842618 84.8 84.8 86.5 80.7 2.9 Cumulative 161447.0 132148.5 0.0 130903.4 0.0 485764242 150326125 144311897 81.1 81.1 79.2 75.8 5.6 Achieved 3A - 8/14/2002

Page: 5 of 7 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: August 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: July, 2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 8/14/2002

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: September 2003

3.

Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action. and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: August 14, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JUNE 2002

1.

Personnel Exposure The total station liquid release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.