k Duke UWPower.
A Dk,e E-C--
Duke Power 526 South Church Street P.O. Box 1006 Charlotte, NC 28201-1006 September 13, 2002 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-August, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of August, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator
- USNRC, Region II Frank Rinaldi, Project Manager
- USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector
Document Control Desk U.S.
NRC -
McGuire bxc:
C.
J.
Thomas (MG01RC)
RGC Site Licensing File ELL (ECO5O)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 1
- 2. Reporting Period:
August 1, 2002-August 31, 2002
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWe):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-369 September 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2533821
- 17. Gross Electrical Energy Generated (MWH) 858557
- 18. Net Electrical Energy Generated (MWH) 826891
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 101.0
- 22. Unit Capacity Factor (Using DER Net) 94.2
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 5831.0 5769.1 0.0 5762.7 0.0 61910046 6791945 6546376 98.8 98.8 102.1 95.1 1.2 Cumulative 181895.0 140700.2 0.0 139443.3 0.0 491561792 154845695 148361386 76.7 76.7 71.9 69.1 9.5 Achieved 3A - 9/13/2002
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire 1 DATE: September 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: Aueust. 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 9/13/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
McGuire Unit 1
- 2.
Scheduled next refueling shutdown: September 2002
- 3.
Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: September 13, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 2
- 2. Reporting Period:
August 1, 2002-August 31, 2002
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWe):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
.50-370 September 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 709.3
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 700.6
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2361820
- 17. Gross Electrical Energy Generated (MWH) 796750
- 18. Net Electrical Energy Generated (MWH) 764986
- 19. Unit Service Factor 94.2
- 20. Unit Availability Factor 94.2
- 21. Unit Capacity Factor (Using MDC Net) 93.5
- 22. Unit Capacity Factor (Using DER Net) 87.1
- 23. Unit Forced Outage Rate 5.8
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 5831.0 5039.0 0.0 5012.1 0.0 78786188 5826336 5607604 86.0 86.0 87.4 81.5 3.3 Cumulative 162191.0 132857.8 0.0 131604.0 0.0 496177179 151122875 145076883 81.1 81.1 79.2 75.8 5.6
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 9/13/2002
Page: 1 of I UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: September 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: August, 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
MANUAL REACTOR TRIP DUE TO LOSS OF MAIN GENERATOR 4 08/22/02 F
43.45 A
HYDROGEN COOLING Summary:
McGuire unit 2 began the month of August operating at 98% power holding due to throttle valve #1 servo card repair. The unit resume power escalation on 08/01/02 at 0151.
The unit returned to 100% full power on 08/01/02 at 0359. On 08/22/02 at 1637 a manual reactor trip occurred from 99.3% due to main generator hydrogen cooling. The unit was placed on-line 08/24/02 at 1204. During power escalation, the unit held at 90% power for thermal power verification. The unit returned to 100% full power 08/26/02 at 0206 and operated at or near 100% full power the remainder of the month.
3C-9/13/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
McGuire Unit 2
- 2.
Scheduled next refueling shutdown: September 2003
- 3.
Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: September 13, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JULY 2002
- 1.
Personnel Exposure The total station liquid release for JULY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for JULY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.