Duke Duke Energy Corporation 526 South Church Street MfrEnergy. P.O. Box 1006 Charlotte, NC 28201-1006 December 15, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Duke Energy Corporation Oconee Nuclear Station, Docket Nos. 50-269, -270, -287 McGuire Nuclear Station, Docket Nos. 50-369, -370 Catawba Nuclear Station, Docket Nos. 50-413, -414 Monthly Performance and Operation Status - November, 2003 Please find attached information concerning the performance and operation status of the Oconee, McGuire and Catawba Nuclear Stations for the month of November 2003.
Please direct any questions or comments to Roger A. Williams at (704) 382-5346.
Sincerely, W. R. McCollum, Jr.
Senior Vice President Nuclear Support I
- r" I---
21H
U.S. Nuclear Regulatory Commission Monthly Performance and Operation Status December 15, 2003 Page 2 xc: L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsythe Street SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. 0lshan, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555 R. E. Martin, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555 S. E. Peters, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555 Ms. Margaret Aucoin Nuclear Assurance Corporation 3930 E. Jones Bridge Road #300 Norcross, GA 30092-2107 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Dottie Sherman, ANI Library American Nuclear Insurers Town Center, Suite 300S 29 South Main Street West Hartford, CT 06107-2445 M. Shannon, Senior Resident Inspector, Oconee Nuclear Station J. Brady, Senior Resident Inspector, McGuire Nuclear Station E. Guthrie, Senior Resident Inspector, Catawba Nuclear Station
U.S. Nuclear Regulatory Commission Monthly Performance and Operation Status December 15, 2003 Page 3 bxc: R. L. Gill - EC05P B. G. Davenport - ON03RC C. J. Thomas - MG01 RC L. A. Keller - CN01 RC R. A. Williams - ECO5Z (2 copies)
L. B. Jones - ECO50 Catawba Date File - CN01 RC (Attn: Jill Ferguson)
North Carolina Municipal Power Piedmont Municipal Power Agency North Carolina Electric Membership Corp.
Saluda River Electric Catawba File 801.01 - CN04DM McGuire File 801.01 - MG01 DM Oconee File 801.01 - ON03DM ELL - ECO50
Operating Data Report Docket No. 50-269 Date December 15,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 1
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date and cumulative
- 4. Nameplate Rating (Gross MWe): 934 capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 266281.0
- 12. Number of Hours Reactor was Critical 0.0 6289.1 209852.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 6288.0 206348.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 15701986 510904640
- 17. Gross Electrical Energy Generated (MWH) 0 5497806 176749113
- 18. Net Electrical Energy Generated (MWH) 0 5253052 168127098
- 19. Unit Service Factor 0.0 78.4 77.5
- 20. Unit Availability Factor 0.0 78.4 77.5
- 21. Unit Capacity Factor (Using MDC Net) 0.0 77.5 74.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 74.0 71.3
- 23. Unit Forced Outage Rate 0.0 0.0 9.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 12/15/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-269 UNIT NAME: Oconee I DATE: December 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November, 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
END OF CYCLE 21 REFUELING AND STEAM GENERATOR/REACTOR 1 l 11/01/03 1 5 1 720. 0l C 1 4 l VESSEL HEAD REPLACEMENT OUTAGE Summary:
Oconee unit I began the month of November in a outage due to end-of-cycle 21 refueling and steam generator/reactor vessel head replacement. The unit remained in the end-of-cycle 21 refueling and steam generator/reactor vessel head replacement outage for the remainder of the month.
(I) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12115/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit I
- 2. Scheduled next refueling shutdown: Currently Refueling
- 3. Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 938*
(c) in the ISFSI: 1848****
- 8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: Decemeber 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
- Represents the combined total for Units I and 2
- On March 29, 1990, received a site specific license for ISFSI which will store 2112 assemblies (88 modules). Forty (40) site specific modules were constructed and loaded.
- In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- Represents the combined total for Units 1,2, and 3
Operating Data Report Docket No. 50-270 Date December 15.2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 2
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date
- 4. Nameplate Rating (Gross MWe): 934 and cumulative capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 256201.0
- 12. Number of Hours Reactor was Critical 720.0 8016.0 209101.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 8016.0 206522.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1849576 20583855 511137410
- 17. Gross Electrical Energy Generated (MWH) 651582 7227117 175880101
- 18. Net Electrical Energy Generated (MWH) 623979 6926266 167652584
- 19. Unit Service Factor 100.0 100.0 80.6
- 20. Unit Availability Factor 100.0 100.0 80.6
- 21. Unit Capacity Factor (Using MDC Net) 102.4 102.1 76.7
- 22. Unit Capacity Factor (Using DER Net) 97.8 97.5 73.9
- 23. Unit Forced Outage Rate 0.0 0.0 8.3
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDowvn At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 12/15/2003
Page: of 1 UNIT SHUTDOWNS DOCKET NO. 50-270 UNIT NAME: Oconee 2 DATE: December 15.2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown RIX Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12/15/2003
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Oconee Unit 2
- 2. Scheduled next refueling shutdown: March, 2004
- 3. Scheduled restart following refueling: June, 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 938*
(c) in the ISFSI: See unit I ****
- 8. Present licensed fuel pool capacity: 1312 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: Decemeber 15. 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
- Represents the combined total for Units I and 2
- See footnote on Unit 1
- I'~~ In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- ' See footnote on Unit I
Operating Data Report Docket No. 50-287 Date December 15,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Oconee 3
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 2568 Notes: Year-to-date and cumulative
- 4. Nameplate Rating (Gross MWe): 934 capacity factors are
- 5. Design Electrical Rating (Net Mwe): 886 calculated using a
- 6. Maximum Dependable Capacity (Gross MWe): 886 weighted average for
- 7. Maximum Dependable Capacity(Net MWe): 846 maximum dependable
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: capacity.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 253848.0
- 12. Number of Hours Reactor was Critical 720.0 6822.7 201875.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 6723.9 199130.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1847727 17005500 498265160
- 17. Gross Electrical Energy Generated (MWH) 646557 5936884 172486159
- 18. Net Electrical Energy Generated (MWH) 619026 5671489 164571134
- 19. Unit Service Factor 100.0 83.9 78.4
- 20. Unit Availability Factor 100.0 83.9 78.4
- 21. Unit Capacity Factor (Using MDC Net) 101.6 83.6 76.0
- 22. Unit Capacity Factor (Using DER Net) 97.0 79.9 73.2
- 23. Unit Forced Outage Rate 0.0 6.3 8.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation NRC Calculated from Generator Nameplate Data:
1 037 937 KVA x 0.90 Pf=934 MW 3A - 12/15/2003
Page: of I UNIT SHUTDOWNS DOCKET NO. 50-287 UNIT NAME: Oconee 3 DATE: December 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November, 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F -Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12/15/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 3
- 2. Scheduled next refueling shutdown: October 2004
- 3. Scheduled restart following refueling: January 2005 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 476 (c) in the ISFSI: See Unit I ****
- 8. Present licensed fuel pool capacity: 825 Size of requested or planned increase: **
- 9. Projected date of last refueling which can be accommodated by present capacity: January 2005***
DUKE POWER COMPANY DATE: Decemeber 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
- See footnote of Unit I
- In 1999 Oconee transitioned to its general license. Forty-four (44) general license modules were installed and 30 modules have now been loaded.
Additional modules will be installed on an as-needed basis.
- See footnote on Unit I
OCONEE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT OCTOBER 2003
- 1. Personnel Exposure -
The total station liquid release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
Operating Data Report Docket No. 50-369 Date December 15.2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: McGuire 1
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- Rating (GrossM We)
- 5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
- 7. Maximum Dependable Capacity(Net MWe): 1100 factor per Page iii, NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 192840.0
- 12. Number of Hours Reactor was Critical 720.0 8016.0 151041.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 8016.0 149740.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2454636 27203492 484108747
- 17. Gross Electrical Energy Generated (MWH) 848917 9392717 166895375
- 18. Net Electrical Energy Generated (MWH) 817776 9054747 159970590
- 19. Unit Service Factor 100.0 100.0 77.7
- 20. Unit Availability Factor 100.0 100.0 77.7
- 21. Unit Capacity Factor (Using MDC Net) 103.3 102.7 73.2
- 22. Unit Capacity Factor (Using DER Net) 96.3 95.7 70.3
- 23. Unit Forced Outage Rate 0.0 0.0 8.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/15/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: December 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12/15f2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: McGuire Unit 1
- 2. Scheduled next refueling shutdown: March 2004
- 3. Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1011
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: Decemeber 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No. 50-370 Date December 15,2003 Completed By Rouer Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: McGuire 2
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- Rating (GrossMNVe)
- 5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
- 7. Maximum Dependable Capacity(Net MWe): 1100 factor per Page iii, NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 173136.0
- 12. Number of Hours Reactor was Critical 720.0 7280.7 143067.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 7280.7 141813.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2454157 24477933 468666293
- 17. Gross Electrical Energy Generated (MWH) 856270 8480602 163036707
- 18. Net Electrical Energy Generated (MWH) 825831 8169374 156552168
- 19. Unit Service Factor 100.0 90.8 81.9
- 20. Unit Availability Factor 100.0 90.8 81.9
- 21. Unit Capacity Factor (Using MDC Net) 104.3 92.6 80.2
- 22. Unit Capacity Factor (Using DER Net) 97.2 86.4 76.6
- 23. Unit Forced Outage Rate 0.0 0.6 5.3
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/15/2003
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: December 15.2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12/15/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: McGuire Unit 2
- 2. Scheduled next refueling shutdown: March 2005
- 3. Scheduled restart following refueling: April 2005 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1138 (c) in the ISFSI: 320
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =-
- 9. Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: Decemeber 15. 2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT OCTOBER 2003
- 1. Personnel Exposure -
The total station liquid release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
Operating Data Report Docket No. 50-413 Date December 15,2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Catawba 1
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- Rating (GrossMWe)
- 5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power
- 7. Maximum Dependable Capacity(Net MWe): 1129 factor per Page iii, NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 161497.0
- 12. Number of Hours Reactor was Critical 169.1 7171.4 134276.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 168.9 7159.6 132755.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 550978 24234194 439098679
- 17. Gross Electrical Energy Generated (MWH) 196437 8653939 155899862
- 18. Net Electrical Energy Generated (MWH) 182907 8198521 147096207
- 19. Unit Service Factor 23.5 89.3 82.2
- 20. Unit Availability Factor 23.5 89.3 82.2
- 21. Unit Capacity Factor (Using MDC Net) 22.5 90.6 80.5
- 22. Unit Capacity Factor (Using DER Net) 22.2 89.3 79.5
- 23. Unit Forced Outage Rate 0.0 4.1 5.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/15/2003
Page: I of 1 UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba I DATE: December 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled . No.
END OF CYCLE 14 REFUELING OUTAGE AND GENERATOR REWIND 3 11/08/03 5 551.15 C I OUTAGE Summary:
Catawba unit I began the month of November operating at 100% power. On 11/05/03 at 2007 the unit began decreasing power and held at 95% power from 11/06/03 at 0033 to to 11/07/03 at 1600 to perform main steam safety valve testing. The unit began decreasing power on 11/07/03 at 1600 and was taken off-line on 11/08/03 at 0051 to begin end-of-cycle 14 refueling and generator rewind outage. The unit remained in the end-of-cycle 14 refueling and generator rewind outage the remainder of the month.
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12115/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: Currently Refueling
- 3. Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1021
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =-
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: Decemeber 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No. 50-414 Date December 15.2003 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Catawba 2
- 2. Reporting Period: November 1, 2003 - November 30, 2003
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
- 4. Nameplate Rating (Gross MWe): 1305
- Rating (GrossMWe)
- 5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
- 6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power
- 7. Maximum Dependable Capacity(Net MWe): 1129 factor per Page iii, NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 151513.0
- 12. Number of Hours Reactor was Critical 720.0 7404.5 127209.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 7373.0 125753.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2410442 24853188 413823015
- 17. Gross Electrical Energy Generated (MWH) 865746 8903432 147549481
- 18. Net Electrical Energy Generated (MWH) 820612 8452137 139436952
- 19. Unit Service Factor 100.0 92.0 83.0
- 20. Unit Availability Factor 100.0 92.0 83.0
- 21. Unit Capacity Factor (Using MDC Net) 101.0 93.4 81.4
- 22. Unit Capacity Factor (Using DER Net) 99.5 92.1 80.4
- 23. Unit Forced Outage Rate 0.0 0.1 6.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/15/2003
Page: 1 of I UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: December 15.2003 COIPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2003 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram
- Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 12/15/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: September 2004
- 3. Scheduled restart following refueling: October 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 917
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: _
- 9. Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: Decemeber 15,2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT OCTOBER 2003
- 1. Personnel Exposure -
The total station liquid release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.