June 2002 Monthly Operating Report for McGuire Units 1 & 2
ML021980499
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/11/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021980499 (9)


Text

I Duke wPower A Duke Energy Company Duke Power Company A Duke Energy Company Energy Center P.O. Box 1006 Charlotte, NC 28201-1006 July 11, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-June, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of

June, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

bSi cerely 1e rr Dm Manager Nuc ear Business Support Attachment XC:

L.

A. Reyes, Regional Administrator

USNRC, Region II Frank Rinaldi, Project Manager
USNRC, ONRR INPO Records Center Ms.

Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector

/_

Document Control Desk U.S.

NRC -

McGuire bxc:

C.

J.

Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

June 1, 2002 - June 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 July 11,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossM We) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 720.0
12. Number of Hours Reactor was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 720.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2456193
17. Gross Electrical Energy Generated (MWH) 841586
18. Net Electrical Energy Generated (MWH) 810931
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 102.4
22. Unit Capacity Factor (Using DER Net) 95.4
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 4343.0 4281.1 0.0 4274.7 0.0 45597620 5075574 4893336 98.4 98.4 102.4 95.5 1.6 Cumulative 180407.0 139212.2 0.0 137955.3 0.0 475249366 153129324 146708346 76.5 76.5 71.7 68.9 9.6 Achieved 3A - 7/11/2002

Page: l of t UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire 1 DATE: July 11, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: June, 2002 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 7/11/2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: September 2002

3.

Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: July 11, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

June 1, 2002 - June 30, 2002

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 July 11,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 720.0
12. Number of Hours Reactor was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 720.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2455410
17. Gross Electrical Energy Generated (MWH) 844920
18. Net Electrical Energy Generated (MWH) 814334
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 102.8
22. Unit Capacity Factor (Using DER Net) 95.8
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 4343.0 3585.7 0.0 3567.6 0.0 57577996 4169998 4014778 82.1 82.1 84.0 78.3 3.4 Cumulative 160703.0 131404.5 0.0 130159.4 0.0 474968987 149466537 143484057 81.0 81.0 79.1 75.7 5.7 Achieved 3A - 7/11/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: July 11, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: June, 2002 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 7/11/2002

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: September 2003

3.

Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:.-

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: July 11, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT MAY 2002

1.

Personnel Exposure The total station liquid release for MAY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for MAY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.