December 2001 Monthly Operating Report for McGuire Nuclear Station, Units 1 & 2
ML020420340
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/15/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020420340 (9)


Text

P Duke 0 Power.

A Duke Energy Company Duke Power 526 South Church Street P.O. Box 1006 Charlotte, NC 28201-1006 January 15, 2002 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-December, 2001 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of

December, 2001.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L.

A.

Reyes, Regional Administrator

USNRC, Region II Frank Rinaldi, Project Manager
USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector

/

Document Control Desk U.S.

NRC -

McGuire bxc:

M. T.

Cash (MGO0RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 1

2. Reporting Period:

December 1, 2001 - December 31, 2001

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-369 January 15,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2535813
17. Gross Electrical Energy Generated (MWH) 890955
18. Net Electrical Energy Generated (MWH) 859414
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 105.0
22. Unit Capacity Factor (Using DER Net) 97.9
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 8760.0 7756.8 0.0 7709.1 0.0 83245444 9016884 8684941 88.0 88.0 90.1 84.0 1.7 Cumulative 176064.0 134931.0 0.0 133680.7 0.0 486908920 148053750 141815010 75.9 75.9 70.9 68.3 9.8 Achieved 3A - 1/15/2002

Page: I of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: January 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: December. 2001 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-1/15/2002

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 1

2.

Scheduled next refueling shutdown: September 2002

3.

Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: January 15, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

December 1, 2001 - December 31, 2001

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1180

6. Maximum Dependable Capacity (Gross MWe):

1144

7. Maximum Dependable Capacity(Net MWe):

1100

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-370 January 15,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2498622
17. Gross Electrical Energy Generated (MWH) 871750
18. Net Electrical Energy Generated (MWH) 840396
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 102.7
22. Unit Capacity Factor (Using DER Net) 95.7
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 8760.0 8702.8 0.0 8698.8 0.0 112814024 10252024 9878043 99.3 99.3 102.5 95.6 0.7 Cumulative 156360.0 127818.9 0.0 126591.8 0.0 500636435 145296539 139469279 81.0 81.0 78.9 75.6 5.7 Achieved 3A - 1/15/2002

Page: I of 1 UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: January 15, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: December. 2001 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-1/15/2002

MONTHLY REFUELING INFORMATION REQUEST

1.

Facility name:

McGuire Unit 2

2.

Scheduled next refueling shutdown: February 2002

3.

Scheduled restart following refueling: March 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160

8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: January 15, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT NOVEMBER 2001

1.

Personnel Exposure The total station liquid release for NOVEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for NOVEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.