ML20058G647

From kanterella
Revision as of 07:04, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Comment on Draft NUREG/BR-0058,rev 2, Regulatory Analysis of Us Nrc. Concurs W/Numarc Comments
ML20058G647
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 11/03/1993
From: Beckham J
GEORGIA POWER CO.
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-58FR47159, RTR-NUREG-BR-0058, RTR-NUREG-BR-58 58FR47159-00006, 58FR47159-6, HL-3436, NUDOCS 9312100019
Download: ML20058G647 (2)


Text

Giapa ar1bo p ny 'N \

40 hvemess Center Pakw:y Post Of5ce Box 1295 I k

} \

p k]h]

Birmingham, Afabama 35201 Q C Telephone 2o5 877 7279 -

-a C[; 693 -

%. ec oi n j~

b&

9 l,perdtry Ab b

~

s. r. secu.=. sr.

6,\ Georgia Power Vice PresJdent - Nuclear Natch Project /[

q . si ."'s \

V' t?e 304Wo eectre t, vn Docket Nos. 50-321 50-424 HL-3436 50-366 50-425 LCV-0221 Nr. Samuel J. Chilk Secretary of the Comission U.S. Nuclear Regulatory Comission Washington, DC 20555 ATTENTION: Docketing and Service Branch Comments on Draft NUREG/BR-0058, Revision 2

" Regulatory Analysis Guidelines of the U. S. Nuclear Regulatory Commission

(58 Federal Reoister 47159 of Sectember 7. 1993)

Dear Mr. Chilk:

Georgia Power Company has reviewed the draft NUREG/BR-0058, Revision 2,

" Regulatory Analysis Guidelines of the U. S. Nu: lear Regulatory Commission," published in the Federal Register on September 7,1993. In accordance with the request for comments, Georgia Power Company is in total agreement with the NUMARC comments which are to be provided to the NRC.

Should you have any questions, please advise.

Respectfully submitted, f ,f)Yw .N_

^

~

d.T.Beckham,Jr.

JDK/jdk l

l 9312100019 931106 PDR NUREG

, BR-OSSB C PDR S/I'd 8019 028 S02 &J3M tJd3Hin05 Wd95:E0 E6, EO 330

Georgia Power A.

k U. S. Nuclear Regulatory Commission Page Two cc: Georoia Dower Comoany C. K. McCoy, Vice President, Vogtle Electric Generating Plant J. B. Beasley, General Manager - Vogtle Electric Generating Plant H. L. Sumner, Jr., General Manager - P1 ant Hatch p._ S. Nuclear Reculatory Commission. Washinoton. DC K. N. Jabbour, Licensing Project Manager - Hatch D. S. Hood, Licensing Project Manager - Vogtle U. S. Nuclear Regulatcry Commission. Recion II S. D. Ebneter, Regional Administrator L. D. Wert, Senior Resident Inspector - Hatch B. R. Bonser, Senior Resident Inspector - Vogtle f

i HL-3436 LCV-0221

! G.01.01 sa a sets cae sez es m a na m nos wass:eo es. ce osa