November 2002 Monthly Operating Report for Duke Energy Corporation
ML023540411
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/13/2002
From: Dimmery T
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023540411 (9)


Text

Duke Power M Duke 526 South Church Street f Powere PO Box 1006 A Duke Energy Company Charlotte, NC 28201-1006 December 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-November, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of November, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, 5ký Iah.eý ý .P4-,

Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Frank Rinaldi, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector <2Ž

Document Control Desk U.S. NRC - McGuire bxc:

C. J. Thomas (MG01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No. 50-369 Date December 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 1
2. Reporting Period: November 1, 2002 - November 30, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power factor per Page iii,
7. Maximum Dependable Capacity(Net MWe): 1100 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 720.0 8016.0 184080.0
12. Number of Hours Reactor was Critical 720.0 7350.5 142281.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 720.0 7299.9 140980.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2453092 80943838 510595584
17. Gross Electrical Energy Generated (MWH) 859919 8557468 156611218
18. Net Electrical Energy Generated (MWH) 829553 8239448 150054458
19. Unit Service Factor 100.0 91.1 76.6
20. Unit Availability Factor 100.0 91.1 76.6
21. Unit Capacity Factor (Using MDC Net) 104.7 93.4 71.9
22. Unit Capacity Factor (Using DER Net) 97.6 87.1 69.1
23. Unit Forced Outage Rate 0.0 1.1 9.4
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-369 UNIT NAME: McGuire I DATE: December 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C- 12/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: March 2004
3. Scheduled restart following refueling: April 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool. 1107
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: December 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No. 50-370 Date December 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 2
2. Reporting Period: November 1, 2002 -November 30, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
7. Maximum Dependable Capacity(Net MWe): 1100 factor per Page iii,
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons: NUREG-0020.
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 720.0 8016.0 1643760
12. Number of Hours Reactor was Critical 720.0 7224.0 135042.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 720.0 7197.1 133789.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2452141 105265426 522656417
17. Gross Electrical Energy Generated (MWH) 856100 8393582 "153690121
18. Net Electrical Energy Generated (MWH) 824789 8078508 S147547787
19. Unit Service Factor 100.0 89.8 81.4
20. Unit Availability Factor 100.0 89.8 81.4
21. Unit Capacity Factor (Using MDC Net) 104.1 91.6 79.5
22. Unit Capacity Factor (Using DER Net) 97.1 85.4 76.1
23. Unit Forced Outage Rate 0.0 2.3 5.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 12/13/2002

Page: 1 of t UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: December 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: November, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C- 12/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: September 2003
3. Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a techmcal specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
9. Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: December 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT OCTOBER 2002

1. Personnel Exposure The total station liquid release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for OCTOBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.