Inservice Inspection (ISI) Summary Report Fall 2002 Inservice Inspection Period
ML030290090
Person / Time
Site: Dresden Constellation icon.png
Issue date: 01/24/2003
From: Hovey R
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RHLTR #03-0004
Download: ML030290090 (112)


Text

Exelon Generation www.exeloncorp.com Exelon,. Nuclear Dresden Generating Station 6500 North Dresden Road Morris, IL60450-9765 10 CFR 50.4 Tel 815-942-2920 10 CFR 50.55a January 24, 2003 RHLTR #03-0004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 3 Facility Operating License No. DPR-25 NRC Docket No. 50-249

Subject:

Inservice Inspection (ISI) Summary Report Fall 2002 Inservice Inspection Period Enclosed is the Dresden Nuclear Power Station (DNPS) Unit 3 Post-Outage (90 day)

Summary Report for ISI examinations and repair/replacement activities conducted from October 2, 2000 to January 6, 2003. Unit 3 completed its seventeenth refueling outage (D3R1 7) on October 26, 2002. This report has been submitted to you in accordance with the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components,"

Article IWA-6200.

Should you have any questions conceming this letter, please contact Mr. Jeff Hansen, Regulatory Assurance Manager, at (815) 416 - 2800.

Respectfully, Site Vice President Dresden Nuclear Power Station Attachment cc: Regional Administrator - Region III NRC Senior Resident Inspector, Dresden Station

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection Unit No. 3; National Board No. N-1 39 200 Exelon Way, Kennett Square, PA, 19348 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Mortis, IL60450 Table of Contents Introduction I Form NIS-1 Owners Report for Inservice Inspections Scope of Inspection II Abstract of ISI and Augmented Examinations Attachment A Summary of Vessel Interior Examinations Abstract of Corrective Measures III Abbreviations IV Repairs and Replacements Since the Preceding Summary Report V Prepared By: A; /- M6 -Os1 eR B an ISoo inator Reviewed By: &I,10.3 Robert D. Geier IWI Coordinator Reviewed By:

Richard Sisk Pressure Testing Coordinator Reviewed By:

vid J. Knox Containment ISI Coordinator Reviewed By:

Ro6ert L.Testin Snubber Coordinator Approved By:

Eirad Molaei Engineering Programs Supervisor 1

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section I Introduction The seventeenth Inservice Inspection (ISI) of Dresden Unit 3 was performed during the D3R17 outage which began on October 8, 2002 and was completed on October 26, 2002. This was the second of two scheduled refuel outages in the third inspection period of the units 3rd 10-year ISI Inspection Interval which commenced on March 1, 1992. The third inspection period commenced on November 1st, 1999 and is currently scheduled to end on October 31, 2003. In addition to examinations performed during D3R17, a number of examinations were performed during on-line operation of Unit 3. This report contains all examinations completed during D3R17 and on line examinations which were not included in the previous Unit 3 Summary Report (dated December 29, 2000).

General Electric was contracted to perform the non-destructive examinations and reactor vessel visual examinations during the refuel outage. Dresden Engineering Programs Group performed the remaining visual and NDE examinations during D3R17 as well as the on line examinations.

The Authorized Nuclear Inservice Inspectors (ANII) services were provided by The Hartford Steam Boiler Inspection Insurance Company of Connecticut. The ANII reviewed procedures, personnel qualifications, instrument and material certifications, and examination results.

All examinations were performed in accordance with the Dresden Station ISI Program, Dresden Station Technical Requirements Manual, the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition and 1998 Edition (implemented in accordance with Relief Request MCR-02 for Containment ISI), Generic Letter 88-01, BWRVIP-75, and In-Vessel Visual Examinations in accordance with BWRVIP Inspection and Evaluation Guidlines.

A list of abbreviations used throughout this report can be found in Section IV of this report.

2

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Exelon Generation Company (EGC, LLC), 200 Exelon Way, Kennett Square, PA, 19348 (Name and Address of Owner)
2. Plant Dresden Nuclear Power Station, 6500 N. Dresden Road, Morris, IL 60450 (Name and Address of Owner)
3. Plant Unit 3 4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date 11-16-71 6. National Board Number for Unit N-139
7. Components Inspected See Section II of this report (report is 111 total pages).

Component or Manufacturer Manufacturer State or National Appurtenance Or Installer or Installer Province No. Board No.

Serial No.

Reactor Vessel Babcock & Wilcox, 610-0111-51-52 B0082900 N- 139 Barberton, Ohio Class 1 & 2 Systems General Electric-APED N/A N/A N/A Morris, IL Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8Y2 in. x 111/2/in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

3

FORM NIS-1 (Back)

8. Examination Dates: 10/02/2000 to 01/06/2003
9. Inspection Period Identification: 3P' Period -From 11/1/1999 to 10/31/2003 3Pd Interval - From 3/1/1992 to 10/31/2003
10. Inspection Interval Identification:
11. Applicable Edition of Section XI 1989 Addenda N/A 1998* Addenda N/A
  • 1998 edition implemented in accordance with Relief Request MCR-02 for Containment Inservice Inspection.
12. Date/Revision of Inspection Plan: 9/20/2002 Revision 7
13. Abstract of Examination and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. See Attached Sections II and III.
14. Abstract of Results of Examinations and Tests. See Attached Sections II and III.
15. Abstract of Corrective Measures. See Attached Sections II and Ill.

We certify that a) the statement made in this report are correct, b) the examinations and tests meet Inspection Plan as required by the ASME Code, Section Xl, and c) corrective measures taken conform to the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date /-1/(49 20 03 Signed Exelon Nuclear Dresden Nuclear Power Station.

By Dresden Station ISI Coordinator c** Owner CERTIFICATE OF INSERVICE INSPECTION I, the under signed, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois And employed by Hartford Steam Boiler of CT Have inspected the components described in the Owner's Report during the period 10/02/2000 To 01/06/2003 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

7 7 , ( Commissions NB7742NISB, EL932 Inspector's Si.ature National Board, State, Province, and Endorsements Date /_& 20 03 4

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section Ii Scope of Inspection Abstract of ISI and Augmented Examinations IS! and Augmented Examinations Table A contains a list of components examined prior to, during and after the D3RI 7 refuel outage, to satisfy the requirements of the Dresden Station ISI Program, Dresden Station Technical Requirements Manual, the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition and 1998 Edition (implemented in accordance with Relief Request MCR-02 for Containment ISI), Generic Letter 88-01 and BWRVIP-75. Those items which were examined and meet the acceptance standards of ASME Section XI or Generic Letter 88-01 are identified as "Acceptable" under the results column. Those items that required further evaluation are identified with "Section III" in the results column and are further discussed in Section III of this report.

Snubber Examinations (Technical Requirements Manual 3.7.H)

All Section XI Class 1, 2 and 3 safety-related snubbers are visually (VT-3) examined in accordance with Dresden Technical Requirements Manual 3.7.H. A sample population of snubbers are functionally tested every outage. Table A includes all the snubbers functionally tested during D3R1 7 and any visual examined snubbers that required further evaluation.

Snubbers that required further evaluation are identified with "Section III" in the results column and are further discussed in Section III of this report.

Summary of Reactor Vessel Weld (Category B-A) Examinations The Unit 3 reactor vessel shell welds are examined as required by IOCFR50.55(a) and ASME Section XI. These welds are addressed under Examination Category B-A, Item numbers B1.1 1, Circumferential Shell Welds; Item B1.12, Longitudinal Shell Welds; and Item B13.30, Head to Flange Weld. Two relief requests were associated with these inspections. First, relief was requested, and subsequently granted, from requirements to examine welds under item B1.11.

The technical basis for this request is established in BWRVIP-05. Second, a schedule exemption was requested, and subsequently approved, to allow performance of these inspections over an additional refueling outage. Otherwise, the entire inspection would have been required during D3R17, the last outage in the third inspection interval. The basis of this request was to allow the station to attempt to take advantage of a new inspection technology, the AIRIS 21 system, to achieve an increased coverage without significantly impacting the outage.

Summary of Vessel Interior Examinations Attachment A contains a summary of examinations performed to satisfy the requirements of ASME Section XI categories B-N-I, B-N-2, and various special examination requirements.

Details of the examinations, results, and corrective measures are included.

5

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section II Scope of Inspection Abstract of IS[ and Augmented Examinations Current Interval Status As of the date of this report, the percentages listed in the table below represent the status of inspections for the 3r' inservice inspection interval. All remaining examinations, with the exception of reactor vessel shell welds are scheduled to be completed prior to the end of the inspection interval. The remaining reactor vessel shell welds (Examination Category B-A) are scheduled to be completed during refueling outage D3R18 at the start of the 4th inservice inspection interval in accordance with an approved exemption request.

Examination Deferral Is permissible In Inspected In accordance Category accordance with Table with Inspection Program B IWX-2500-1 B-A 69% 100%

B-D N/A 100%

B-E 100% N/A B-G-1 100% N/A B-G-2 100%1 100%

B-M-1 100% N/A B-M-2 100%1 N/A B-N-1 N/A 100%

B-N-2 100% N/A B-O 100% NIA C-A N/A 100%

N/A 83%2 C-B C-C N/A 60%

D-B N/A 85%

F-A N/A 76%

N/A 83%3 R-A

1. Percentage represents components subject to Inspection only when disassembled for maintenance, repair, or volumetric examination.
2. Percentage does not include components subject to V'-2 examination each inspection period. VT-2 examinations during the Yd 3 inspection period are complete.
3. Percentage does not Include socket welds subject to VT-2 examination each inspection period. VT-2 examinations during the 3Vd Inspection period are complete.

6

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nudear Power Station 6500 N. Dresden Road, Morris, IL60450 Section II Scope of Inspection Abstract of ISI and Augmented Examinations Cate Btm NAugPment Sytem Line Component Exam Credit ResuXtabl B-A B1.12 N/A RPV RPV SHELL 3-SCIA-VERT LONG UT Xl Acceptable B-A B1.12 NWA RPV RPV SHELL 3-SC2C-VERT LONG UT XI Acceptable B-A B1.12 WA RPV RPV SHELL 3-SC2B-VERT LONG UT XI Acceptable B-A B1.12 N/A RPV RPV SHELL 3-SC3A-VERT LONG UT Xl Acceptable B-A B1.12 WA RPV RPV SHELL 3-SC3B-VERT LONG UT XI Acceptable B-A B1.12 WA RPV RPV SHELL 3-SC3C-VERT LONG UT Xi Acceptable B-A B1.12 NWA RPV RPV SHELL 3-SC3D-VERT LONG UT XI Acceptable B-A B1.12 NWA RPV RPV SHELL 3-SC4A-VERT LONG UT Xl Acceptable B-A B1.12 WA RPV RPV SHELL 3-SC4C-VERT LONG UT Xl Acceptable B-A B1.12 WA RPV RPV SHELL 3-SC4C-VERT LONG UT Xl Acceptable B-A B1.12 N/A RPV RPV SHELL 3-SC4D-VERT LONG UT XI Acceptable B-A B1.30 NWA RPV RPV UPP HD 3-SC4-FLG RPV-FLG UT XI Acceptable B-D B3.100 WA RPV RPV SHELL N20A-1 NIR UT XI Acceptable B-D B3.100 NWA RPV RPV SHELL N201-1 NIR UT XI Acceptable B-D B3.100 WA RPV RPV SHELL N2A-1 NIR UT Xl Acceptable B-D B3.100 WA RPV RPV SHELL N2C-1 NIR UT Xl Acceptable B-D B3.100 N/A RPV RPV SHELL N2F-1 NIR UT XI Acceptable B-D B3.100 WA RPV RPV SHELL N2H-1 NIR UT Xi Acceptable B-D B3.100 WA RPV RPV SHELL N2K-1 NIR UT Xl Acceptable B-D B3.100 WA RPV RPV SHELL N2K-1 NIR UT Xl Acceptable B-D B3.90 WA RPV RPV SHELL N20A-2 RPV-NOZ UT Xi Acceptable B-D B3.90 WA RPV RPV SHELL N201-2 RPV-NOZ UT Xl Acceptable B-D B3.90 N/A RPV RPV SHELL N2A-2 NOZ-RPV UT XI Acceptable B-D B3.90 N/A RPV RPV SHELL N2C-2 NOZ-RPV UT Xl Acceptable B-D B3.90 N/A RPV RPV SHELL N2F-2 NOZ-RPV UT Xl Acceptable B-D B3.90 N/A RPV RPV SHELL N2H-2 NOZ-RPV UT Xl Acceptable B-D B3.90 N/A RPV RPV SHELL N2J-2 NOZ-RPV UT Xl Acceptable B-D B3.90 N/A RPV RPV SHELL N2K-2 NOZ-RPSV UT XI Acceptable B-G-1 56.30 N/A RP`V RPV UPP HD HD STUDS RMVD (92) FLGBLT MT XI Acceptable B-G-2 B7.50 N/A ISCO 1303-12 ISO-17F-FLG FLGBLT VT-1 Xi Acceptable SV-3-203-4C-FLG FLGBLT VT-1 XI Acceptable B-G-2 B7.50 N/A MS 3001B-6 SV-3-203-4D-FLG FLGBLT VT-1 Xl Acceptable B-G-2 B7.50 N/A MS 3001B-6 VT-1 XI Acceptable B-G-2 B7.50 N/A MS 3001C-6 ERV-3-203-3C-FLG FLGBLT FLGBLT VT-1 XI Acceptable B-G-2 B7.50 N/A MS 3001D-6 ERV-3-203-3D-FLG 2-27A-4A-FLG FLGBLT VT-1 Xl Acceptable B-G-2 B7.50 N/A SDC 101 1A-2 2-26B-5A-FLG FLGBLT VT-1 XI Acceptable B-G-2 B7.50 N/A SDC 1011B-2 2-25C-5A-FLG FLGBLT VT-1 Xl Acceptable B-G-2 B7.50 N/A SDC 101IC-2 B-M-1 B12.40 N/A MS 3001B-6 ERV-3-203-3B VLVWLD RT Xl Acceptable 7

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section II Scope of Inspection Abstract of ISI and Augmented Examinations CatgorIte Augment system Line Component Type Exm Credit ResulIts B-M-2 B12.50 N/A MS 3001A-6 TRV-3-203-3A VLV VT-3 XI Acceptable B-N-1 B13.10 N/A RPV RPV SHELL VESSEL INT RPV VT-3 Xl Acceptable B-N-2 B13.20 N/A RPV RPV SHELL IN-BELTLINE ArT IWA VT-1 Xl Acceptable B-N-2 B13.30 N/A RPV RPV SHELL OUT-BELTLINE AT IWA VT-3 XI Acceptable B-N-2 B13.40 N/A RPV RPV SHELL CORE SUPPORT IWA VT-3 XI Acceptable B-O B14.10 N/A RPV RPV LWR HD Al 0-0239-2 P-P PT XI Acceptable B-O B14.10 N/A RPV RPV LWR HD E2-1807-2 P-P PT XI Acceptable B-0 B14.10 N/A RPV RPV LWR HD N13-5051-2 P-P PT XI Acceptable B-0 B14.10 N/A RPV RPV LWR HD R8-5831-2 P-P PT XI Acceptable B-P B15.XX N/A RR TEST BLOCK 3RC01 N/A VT-2 XI See Section III B-P B15.XX N/A SBLC TEST BLOCK 3SC01 N/A VT-2 XI Acceptable C-B C2.31 N/A LPCI 1508-18 3-1503A-N3-1A SDL-SHL MT XI Acceptable C-B C2.31 N/A LPCI 1508-18 3-1503A-N3-1B NOZ-SDL MT XI Acceptable C-B C2.33 N/A ECCS 1501-20 20-11 NOZ-SHL VT-2 XI Acceptable C-B C2.33 N/A ECCS 1501-20 20-5 NOZ-SHL VT-2 Xl Acceptable C-B C2.33 N/A ECCS 1501-20 20-7 NOZ-SHL VT-2 XI Acceptable C-B C2.33 N/A ECCS 1501-20 20-9 NOZ-SHL VT-2 XI Acceptable C-B C2.33 N/A LPCI 1508-18 3-1503A-N3-1 NOZ-SHL VT-2 XI Acceptable C-B C2.33 N/A LPCI 1509-18 3-1503A-N4-1 SHL-NOZ VT-2 XI Acceptable C-C C3.10 N/A LPCI HTEX 3A-1503 M-1200D-1016 IWA MT Xl Acceptable PT C-C C3.20 N/A LPCI 1509-16 M-3413-25 IWA MT XI Acceptable C-H C7.ST WA HPCI TEST BLOCK 3HP03 N/A VT-2 XI Acceptable N/A LPCI TEST BLOCK 3LP02 N/A VT-2 Xl Acceptable C-H C7.ST 3LP03 N/A VT-2 Xl Acceptable C-H C7.ST N/A LPCI TEST BLOCK N/A LPCI TEST BLOCK 3LP04 N/A VT-2 XI Acceptable C-H C7.ST 3CS01 N/A VT-2 Xl Acceptable C-H C7.XX N/A CS TEST BLOCK C7.XX N/A ECCS TEST BLOCK 3EC01 N/A VT-2 XI Acceptable C-H 3EC02 N/A VT-2 Xl Acceptable C-H C7.XX N/A ECCS TEST BLOCK 3HP01 N/A VT-2 Xl Acceptable C-H C7.XX N/A HPCI TEST BLOCK 3HP02 N/A VT-2 XI Acceptable C-H C7.XX N/A HPCI TEST BLOCK 3LP01 N/A VT-2 XI Acceptable C-H C7.XX N/A LPCI TEST BLOCK Xl Acceptable C-H C7.XX N/A RPV TEST BLOCK 3NB01 N/A VT-2 X1 Acceptable C7.XX N/A SBLC TEST BLOCK 3SC03 N/A VT-2 C-H N/A CCSW TEST BLOCK 3CC01 N/A VT-2 XI See Section III D-B D2.XX 8

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-1 39 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section II Scope of Inspection Abstract of ISI and Augmented Examinations D-B D2. AuXXent DSytm Line BOCompKnet Type Exam XCredit Results, D-B D2.XX N/A DGSW TEST BLOCK 3DG01 N/A V17-2 XI Acceptable D-B D2.XX N/A ISCO TEST BLOCK 31C02 N/A VT-2 Xl Acceptable D-B D2.XX N/A ISCO TEST BLOCK 31C02 N/A VT-2 XI Acceptable D-B3 D2.XX N/A MVS TEST BLOCK 3MS01 N/A VT-2 XI Acceptable F-A F1.10 N/A MS 3001A-20 M-564J SHT 18 CL 1 SUP VT-314 BL Acceptable F-A F1.10 N/A MS 3001B-20 M-564K SHT 2 CL 1 SNB VT-314 OTHR Acceptable FTEST F-A F1.10 N/A MS 3001C-20 M-564L SHT 26 CL 1 SUP VT-314 BL Acceptable F-A F1.20 N/A CRD 0384-8 M- 1188D-1 173(2/2) CL 2 SNB V17-3/4 OTHR Acceptable F.TEST F-A F1.20 N/A CRD 0385-8 M- 1188D-1 164(2r2) CL 2 SNB VT-34 OTHR Acceptable F.TEST F-A F1.20 N/A CRD 0386-8 M- 1188D-1046(1/2) CL 2 SNB VT-3/4 Xl Acceptable F-A F1.20 N/A CRD 0408A-6 M-1188D-11123 CL 2 SNB VT-3/4 Xl Acceptable F-A F1.20 N/A CRD 0408A-6 M-1188D-1133 CL 2 SNB VT-3/4 OTHR Acceptable F.TEST F-A F1.20 N/A ECCS 1501-24 M-3402-03 CL 2 SNB VT-314 XI Acceptable F-A F1.20 NIA ECCS 1501-24 M-3402-08 CL 2 SNB VT-3/4 XI Acceptable F-A F1.20 N/A ECCS 1501-24 M-3402-11 CL 2 SNB VT-3I4 OTHR Acceptable F.TEST F-A F1.20 N/A ECCS 1501-24 M-3402-12 CL 2 SNB VT-314 XI Acceptable F-A F1.20 N/A ECCS 1501-24 M-3402-30 CL 2 SNB V"-3/4 OTHR Acceptable F.TEST F-A F1.20 N/A HPCI 2305-10 M-1187D-264 CL 2 SUP Vr-3l4 SU See Section III F-A F1.20 N/A HPCI 2305-10 M-1 187D-579 CL 2 SUP VT-3I4 SU Acceptable F-A F1.40 N/A RPV RPV SHELL M-1211D-5 CL 1 SUP VT-3f4 XI Acceptable F-A F1.40 N/A RR PMP 3A-0202 M-1193D-1117 CL 1 SNB Vr-3/4 OTHR Acceptable F.TEST F-A F1.40 N/A RR PMP 3B-0202 M-1193D-1122 CL I SNB V'-3/4 OTHR Acceptable F.TEST F-A F1.40 N/A RR PMP 3B-0202 M-1193D-1 126 CL I SNB VT-3/4 OTHR Acceptable F.TEST R-A R1.11 N/A MS 3007-2 MSD2-1 SWR-SWE VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-14 P-SWT VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-18 P-SWE VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-20 SWR-SWE VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-30 SWE-P VT-2 XI Acceptable R-A R1.11 N/A MS 3007-2 MSD2-35(B) P-SWV VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-36 SWC-P VT-2 XI Acceptable R-A R1.11 N/A MS 3007-2 MSD2-37 P-SWC VT-2 Xl Acceptable R-A R1.11 N/A MS 3007-2 MSD2-6 P-SWC VT-2 Xl Acceptable 9

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way. Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section II Scope of Inspection Abstract of IS[ and Augmented Examinations Cateory 'item Augment System Line: Component .Type Exam Credit Results, R-A R1.11 WA MS 3007-2 MSD2-9 P-SWT VT-2 XI Acceptable R-A R1.11 WA MS 3007A-1.5 MSDA1.5-4 SWE-P VT-2 Xl Acceptable R-A R1.11 WA MS 30071-1.5 MSDB1.5-4 SWE-P VT-2 Xl Acceptable R-A R1.11 N/A MS 30071-1.5 MSDB1.5-5 P-SWE VT-2 Xl Acceptable R-A R1.11 N/A MS 3007C-1.5 MSDCl.5-4 SWE-P VT-2 Xl Acceptable R-A R1.11 NWA MS 3007C-1.5 MSDC1.5-5 P-SWE VT-2 XI Acceptable R-A R1.11 NWA MS 3007D-1.5 MSDD1.5-4(A) SWE-P VT-2 X1 Acceptable R-A R1.11 NA MS 3007D-1.5 MSDD1.5-5(A) SWE-P VT-2 Xl Acceptable R-A R1.11 NIA SBLC 1102-1.5 N12-3 SE-NOZ PT OTHR Acceptable R-A R1.11 N/A SBLC 1102-1.5 SLC1.5-8 SWT-RED VT-2 XI Acceptable R-A R1.11 N/A SBLC 1102-1.5 SLC1.5-9 P-SWT VT-2 XI Acceptable R-A R1.11 N/A SDC IOO1A-14 14-27A-5 P-EL MT XI Acceptable UT-E R-A R1.11 N/A SDC 1001A-14 14-K27A-6 EL-P MT XI Acceptable UT-E R-A R1.11 N/A SDC 1001A-16 16-K30 EL-P MT Xl Acceptable UT-E R-A R1.11 N/A SDC 1001B-16 16-23 EL-EL MT Xl Acceptable UT-E R-A R1.11 N/A SDC 1001C-14 14-K25C-5 EL-P MT XI Acceptable UT-E R-A R1.20 N/A RHV 0214-2 HV2-78 P-SWP VT-2 XI Acceptable R-A R1.20 N/A SBLC 1102-1.5 SLC1.5-41 SWE-P VT-2 Xl Acceptable R-A R1.20 N/A SBLC 1102-1.5 SLC1.5-45 SWC-P VT-2 Xi Acceptable R-A R11.20 N/A SBLC 1102-1.5 SLC1.5-50 P-SWE VT-2 XI Acceptable R-A R1.20 N/A SBLC 1102-1.5 SLC1.5-54 P-SWE VT-2 Xi Acceptable WA WA NIA CRD 3-0404B-1 M-1188D-1062 CL2SNB VT-3/4 OTHR Acceptable F.TEST NZA N/A WA CRD 3-0404B-1 M-1188D-1066 CL2SNB VT-3/4 OTHR Acceptable F.TEST WA N/A WA CRD 3-0404B-1 M1188D-1063 CL2SNB VT-3/4 OTHR Acceptable F.TEST NIA NIA WA CRD 3-0410A-2 M1188D-1182 CL2SNB VT-314 OTHR Acceptable F.TEST 10

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N.Dresden Road, Morris, IL60450 Section I1 Scope of Inspection Attachment A Summary of Vessel Interior Examinations Examination Category B-N-1 Item B13.10, "Reactor Vessel Interior Surfaces', were VT-3 examined between the closure flange and the top of the shroud over 3600 of the reactor vessel circumference. This exam is required each period. No indications were identified.

Examination Category B-N-2 Item B.13.20, "Interior Attachments Within the Beltline", Accessible Welds, were VT-I examined as required during this interval. These examinations are required to be performed once each interval. The component attachments within the beltline not examined during D3R16 were examined this outage. Specifically, the secondary Jet Pump Riser wall brace attachments designated as weld RB-3 in BWRVIP-41 were examined for all twenty Jet Pumps. No indications were identified.

Item B13.30, "Interior Attachments Beyond the Beltline", Accessible Welds, were VT-3 examined as required during this interval. Several of these examinations were performed during outages prior to D3R17. Some were repeated this outage to capture the more extensively defined inspection recommendations of BWRVIP-48. The locations examined during this outage included all Core Spray piping attachments, all Feedwater sparger end bracket attachments, and all Steam Dryer support lugs. No indications were identified.

Item B13.40, "Core Support Structures", Accessible Welds, were VT-3 examined as required during this interval.

These examinations are required to be performed once each interval. These welds were examined during D3R14.

Core Spray System Examinations Core Spray piping was examined during D3R17 as recommended in BWRVIP-18. Specifically, the known flaw on the P8a weld on the 80r downcomer was ultrasonically examined to verify visual inspection collected during D3R15 and 16. During D3R15, the "bumper clamp" repair was installed which made the specific weld inaccessible to the ultrasonic equipment routinely utilized every second outage. During this outage, a compact pole deployed UT device was used by FTI. The UT inspection confirmed visual inspection information and concluded that this weld flaw has not propagated since it was initially examined during D3R14. General Electric performed a flaw evaluation in accordance with BWRVI P-1 8 that accepts this weld flaw for over one additional cycle of operation.

Visual examinations were also performed of the "undemonstrated welds". Also, in anticipation of proposed changes to BWRVIP-18, the "target set" elbow (P4) welds were visually examined for "excessive grinding". These welds are typically UT examined only.

11

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section I1 Scope of Inspection Attachment A Summary of Vessel Interior Examinations BWRVIP Inspections BWRVIP-41 inspection recommendations for Jet Pump inspections were continued during D3R17, the second inspection in the six year inspection cycle. High priority inspections were performed on four DF-2 welds. Medium priority inspections of five RS-10 welds were also performed. Dresden station is on track for completion of the first cycle during D3R18. No indications were identified.

BWRVIP-47 inspection recommendations were completed for the first inspection cycle 5% sample of control rod drive guide tubes. No indications were identified.

Steam Dryer EPU Inspections Steam Dryer inspections were performed as committed during EPU discussions with ACRS. No indications were identified. Additional dryer component surfaces were examined to verify that the conditions identified on the failed Quad Cities Unit 2 dryer were not present on the Dresden Unit 3 dryer. A repair was installed on the skirt to preclude the possibility of a failure under uprate flow conditions as occurred at Quad Cities.

SIL Recommended Inspections The shroud access hole covers (AHCs) on Dresden Unit 3 were last examined during D3R13. No inoications have ever been identified on the D3 AHCs. As a result, a preemptive repair as was performed on D2 has not been installed on Dresden Unit 3. A recent revision to SIL 462 necessitated an EVT-1 examination of these welds during this outage. No indications were identified.

12

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N.Dresden Road, Morris, IL60450 Section III Abstract of Corrective Measures The findings and subsequent measures taken to correct the findings demonstrate that all components examined are functional and in compliance with the Dresden Station ISI Program, Dresden Station Technical Requirements Manual, the ASME Boiler and Pressure Vessel Code, Section XA, 1989 Edition and 1998 Edition (implemented in accordance with Relief Request MCR-02 for Containment ISI), Generic Letter 88-01, and BWRVIP-75.

The following is a summary of corrective measures taken as a result of examination findings.

13

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection Unit No. 3; National Board No. N-139 200 Exelon Way, Kennett Square, PA, 19348 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section III Abstract of Corrective Measures FJteIor Item Augment System Line Component Type B-P B1 5.XX RR TEST BLOCK 3RC01 N/A During the D3R17 system leakage test a small number of indications were discovered. Initited Condition Report 128518 to assess the dicrepancies. Flange leakage at control rod drives K-10, M-10, P-12, D-6, B-11, B-12, D-14, and F-2 were dispositioned In accordance with the provisions of Relief Request PR-20. Valve body to bonnet leakage at control rod drive hydraulic control unit valves 3-0305-101(P6), 101(K5), 102(K9). 101(Cl 1), 101(C12), 101(G1O),

102(B7), 101 (C7), 101 (D7), and 101 (E7) were dispositioned in accordance with the provisions of Relief Request PR 22.

D-B D2.XX CCSW TEST BLOCK 3CC01 WA During the system pressure test, leakage was discovered at the 3D CCSW pump casing flange. Initiated Condition Report 92589 to assess the discrepancy. Corrective measures were taken under work order 402721 where bolting was removed, VT-3 inspected and found acceptable.

F-A F1.20 HPCI 2305-10 M-1 187D-264 CL 2 SUP During VT-3 examination, the spring was found outside of the cold load range. Initiated Condition Report 127707 to assess the discrepancy. The spring was adjusted under WO 00497144-04, reinspected and found acceptable. The incorrect setting was attributed to a maintenance activity on this support and no additional examinations were deemed required.

14

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section IV Abbreviations Augment GL88-01 Generic Letter 88-01 Exam, Weld Category Exam MT Magnetic Particle PT Liquid Penetrant RT Radiograph UT Ultrasonic UT-E Ultrasonic-Risk ISI Expanded Volume VT-1, 2, or 3 Visual Examination Exam Selection AD Additional Examination (expansion)

AG Augmented Requirement BL Baseline OTHR Other SU Successive Examination XI ASME Section XI Requirement System CCSW Containment Cooling Service Water CRD Control Rod Drive DGSW Diesel Generator Service Water ECCS Emergency Core Cooling System Ring Header FW Feedwater HPCI High Pressure Coolant Injection ISCO Isolation Condenser LPCI Low Pressure Coolant Injection MS Main Steam RHS Reactor Head Spray RPV Reactor Pressure Vessel RR Reactor Recirculation RVBD Reactor Vessel Bottom Drain SBLC Standby Liquid Control SDC Shutdown Cooling Type 15

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section IV Abbreviations BELLOW Bellows BLTCONN Bolted Connection BPC Branch Pipe Connection BPCS Branch Pipe Connection Saddle CAP Pipe Cap COND Condenser CRO Cross EL Elbow ELS Elbow Longitudinal Seam F Flued Head FLG Flange FLGBLT Flange Bolt FLS Fitting Longitudinal Seam GASKET Gasket HTEX Heat Exchanger IWA Integral Welded Attachment MBARR Moisture Barrier NIR Nozzle Inner Radius NOZ Nozzle P Pipe PG Penetration Guide PLS Piping Longitudinal Seam PMP Pump PMPBLT Pump Bolting RED Reducer REDE Reducing Elbow RPV Reactor Pressure Vessel SDL Saddle SE Safe-end SEAL Seal SHL Shell SURF Containment Surface SWC Socket Welded Coupling SWCP Socket Welded Pipe Cap SWE Socket Welded Elbow SWF Socket Welded Flange SWP Sweep-O-Let, Weld-O-Let, Etc.

SWR Socket Welded Reducer SWT Socket Welded Tee SWV Socket Welded Valve TBSHT Tubesheet TEE Tee VB Vacuum Breaker VLV Valve VLVBLT Valve Bolting VLVWLD Valve Weld 16

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL 60450 Section V Repairs and Replacements Since the Preceding Summary Report Several ASME Section Xl repairs and replacements have taken place at Dresden Unit 3 since the previous summary report was issued. A review of the Dresden Station Section XI Repair Program Log was conducted in order to identify the various repairs and replacements. Although not required per IWA 6210(c), Class 3 repairs and replacements are also included in this report.

Copies of the NIS-2 forms associated with all of the Section XI repairs and replacements conducted since the previous summary report have been included in this section. The NIS-2 forms provide an abstract of the repairs and replacements and outline the examinations and tests performed in conjunction with them. Code Data Reports are not included in this report, but are available for review at Dresden Station.

A listing of NIS-2 forms is included in this section in order of repair/replacement plan number followed by the associated work request number.

Three additional revised NIS-2 forms (2-01-003, 2-01-063, and 2-01-066) are also being submitted with this report. The NIS-2 forms have been revised to document the use of Code Case N-416-1. The use of the code case was unintentionally omitted in the previous submittal.

17

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection 200 Exelon Way, Kennett Square, PA, 19348 Unit No. 3; National Board No. N-139 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section V Repairs and Replacements Since the Preceding Summary Report U IS- N-0O.

Wor Rquest 1 2-01-004 99216210-01 2-01-005 99216197-01 2-01-00 99216199-01 2-01-007 99248707-01 2-01-057 00366858-01 2-01-058 00366859-01 2-02-003 00379171-01 3-00-033 PO 35750 3-00-063 99239601-02 3-01-002 99167257-01 3-01-003 98107896-01 3-01-004 99254259-01 3-01-005 99259548-01 3-01-006 99269491-01 3-01-008 99020089-01 3-01-009 99214665-01 3-01-010 00318334-01 3-01-011 99214704-01 3-01-012 99214701-01 3-01-014 00344091-04 3-01-018 00386418-03 3-01-022 00397285-01 3-02-001 99151105-01 3-02-002 00395579-01 3-02-004 99021663-01 3-02-005 99021662-01 3-02-006 99026194-01 3-02-007 99020095-01 3-02-008 99020035-01 3-02-009 99020021-01 3-02-010 99032313-01 3-02-015 99215820-01 3-02-016 99215822-01 3-02-018 00419673-01 3-02-020 00410851-01 3-02-023 00416257-06 3-02-024 00416257-05 3-02-026 00327640-01 3-02-027 00410870-05 3-02-028 00344119-05 3-02-029 00417715-01 3-02-031 99227816-03 3-02-032 00340400-01 18

Exelon Generation Company (EGC, LLC) October 2002 Inservice Inspection Unit No. 3; National Board No. N-139 200 Exelon Way, Kennett Square, PA, 19348 Commercial Service Date: 11-16-71 Dresden Nuclear Power Station 6500 N. Dresden Road, Morris, IL60450 Section V Repairs and Replacements Since the Preceding Summary Report E Work Request 3-02-039 00349897-01 3-02-041 00446991-01 3-02-047 00318228-02 3-02-050 00318228-05 3-02-051 00318228-07 3-02-052 99223565-01 3-02-053 00420336-07 3-02-054 00420336-09 3-02-055 00420336-01 3-02-056 00420336-02 3-02-057 00420336-04 3-02-058 00420336-05 3-02-059 00430853-02 3-02-060 00321868-27 3-02-061 00321868-30 3-02-062 00453724-01 3-02-063 00453723-01 3-02-064 00318228-05 3-02-065 99258667-01 3-02-067 00494885-15 3-02-068 00494885-01 3-02-070 00496899-01 3-02-071 99223565-07 3-02-072 99019531-01 3-02-073 00496973-01 3-02-074 00385110-01 3-02-075 99019532-01 3-02-076 99019534-01 3-02-077 99223699-01 3-02-082 00516067-04 3-98-010 97134077-01 3-98-013 97134076-01 19

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 1-11-2003 REVISED P.O. Box 805379. Chicago IL.60680-5379 (Address) Sheet: 1 Of 3
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)

DCP 9900395NVO 99231860/PLAN 2-01-003

3. Work Performed By: Same as Above (Name) Repair Organization P,O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (CCSW/LPCI)
5. (a) Construction Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases N-416-1 I
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Pipe line 2-1558A-2"-D. Unknown None N/A Associated with Hx N/A Replaced No 2-1503-A.

Pipe line 2-1558A-2"-D. Unknown HT#-720254 N/A Cat. ID-24507, UTC- N/A Replacement No pipe sch.80. 2066926.

Pipe line 2-1558A-T-D, Unknown Not Recorded N/A Cat ID-7480, UTC- N/A Replacement No flange set, 2" s.w., 3001b. 2600427.

5/8-1 1 threaded rod for Unknown Not Recorded N/A Cat ID-39725, UTC- N/A Replacement No flange set on 2-1558A-2"- 2616440.

D.

5/8-1 1 heavy hex nuts for Unknown Not Recorded N/A Cat ID-37029, UTC- N/A Replacement No flange set on 2-1558A-2"- 2005510.

D. IIII

7. Description of work:Replaced existing globe valves with gate valves and flanged piping to facilitate Hx maintenance. Affected WO Tasks 01 & 02 (Hx 2 1503A/pipe 2-1558A-2"), Tasks 06, & 07 (Hx 2-1503BIpipe 2-1558-2).
8. Test Conducted: Hydrostatic [ ] Pneumatic [ ] Nominal Operating Pressure [X] Not Applicable Test Pressure
  • psig Test Temperature Ambient OF
9. Remarks:**227 psig on 2-1558A-2" and 221 psig on 2-1558B-2" porition of piping. A VT-2 was performed during DOS 1500-12 for both affected trains.

Other than a packing leak noted on valve 2-1599-65B, no leakage was detected.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed: 4 ISI COORDINATOR /,- A0*. 20 119A S(ORre-orfwner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insuralceapd InspectjonCo. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on .20,'nd

,-,/ state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Sdction Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any person injury or propertygdamge or a loss of any kind arising from or connected with this Inspection.

Date: Inspector: ,_-_ _ _ _ ___ Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) )ate: 1-11-2003 REVISED P.O. Box 805379. Chicago IL,60680-5379 (Address) 3heet: 2 Of 3
2. Plant Dresden Nuclear Power Station (Name) Jnit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)
3. Work Performed By: Same as Above (Name) DCP 9900395/WO 99,231860/PLAN 2-01-003 Same as Above (Address) Repair Organization P.0. No., Job No. etc.
4. Identification of System: 1500 (CCSW/LPCI)
5. (a) Construction Code USASB31.1-0 , 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases N-416-1 I

Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 2" X V s.w. reducing Insert Unknown None N/A Une #2-1558A-2" N/A Replaced No on pipe 2-1558A-2"-D.

2" X 1"s.w. 3000 psi, Unknown HT#021J N/A Cat ID-38510, UTC- N/A Replacement No reducing insert 2615426.

2" s.w. tee on pipe line 2- Unknown None N/A Une # 2-1558A-2" N/A Replaced No 1558A-2"-D.

2" s.w. 3000 psi, tee. Unknown Not Recorded N/A Cat ID-7361, UTC- N/A Replacement No 2018116.

2" s.w. globe valve 2-1599- Hancock Model 5500W1 N/A EPN: 2-1599-65A N/A Replaced No 65A.

2" s.w. d 800 gate valve 2- Vogt Model N/A Cat ID-412907, N/A Replacement No 1599-65A. SW12111 2' UTC-2602417.

Pipe line 2-1558B-2"-D. Unknown None N/A Associated with Hx N/A Replaced No 2-1503-B.

Pipe line 2-1558B-2"-D, Unknown HT#-720254 N/A Cat ID-24507, UTC- N/A Replacement No pipe sch.80. 2066926.

Pipe line 2-1558B-2"-D, Unknown Not Recorded N/A Cat ID-7480, UTC- N/A Replacement No flange set, 2" s.w., 3001b. 2600427.

5/8-1 1 threaded rod for Unknown None N/A Cat ID-39725, UTC- N/A Replacement No flange set on 2-15586-2'- 2616440.

D.

5/8-11 heavy hex nuts for Unknown HT#021J N/A Cat ID-37029, UTC- N/A Replacement No flange set on 2-1558B-2%- 2005510.

D.

2"X 1"s.w. reducing insert Unknown None N/A Line #2-1558B-2" N/A Replaced No on pipe 2-1558-2*-D.

2" X 1"s.w. 3000 psi, Unknown HT#021J N/A Cat ID-38510, UTC- N/A Replacement No reducing insert. 2615426.

I__________

________ ______i I _________1____ I 1 _______1____

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 1-11-2003 REVISED P.O. Box 805379. Chicago IL.60680-5379 (Address) S heet: 3 Of 3
2. Plant: Dresden Nuclear Power Station (Name) Unit:

2 6500 North Dresden Road, Morris IL., 60450 (Address) 31860/PLAN 2-01-003 (Name) DCP 9900395/WO 992

3. Work Performed By: Same as Above Repair Organization P. 0. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (CCSW/LPCI)
5. (a) Construction Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 198I9 Edition, NO Addenda, Code Cases N-416-1 I Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No / Replacement Yes/No Unknown None N/A Line # 2-1558B-2" N/A Replaced No 2" s.w. tee on pipe line 2-1558B-2"-D.

2 s.w. 3000 psi, tee. Unknown Not Recorded N/A Cat ID-7361, UTC- N/A Replacement No 2018116.

2 s.w. globe valve 2-1599- Hancock Model 550CM/1 N/A EPN: 2-1599-65B N/A Replaced No 65B.

Vogt Model N/A Cat ID-412907, N/A Replacement No 2" s.w. d 800 gate valve 2-1599-65B. SW12111 2" UTC-2602417.

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name)

Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)

3. Work Performed By: Same as Above (Name) WO 99216210-01 PLAN 2-01-004 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 0200 (Main Steam)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, CodeCases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare MSIV Disc Assembly Crane NWA N/A W099216210-01 Unknown Repair No Pilot Disc in Spare MSIV Crane Unknown N/A N/A Unknown Replaced No Disc Assembly Pilot Disc in Spare MSIV Crane D0232 N/A Cat ID 7996, Unknown Replacement No Disc Assembly UTC 2616371
7. Description of work: Rebuild of spare valve disc assembly. Pilot disc replaced. Assembly returned to stock.
8. Test Conducted: Hydrostatic[ ] Pneumatic [ ] Nominal Operating Pressure [ Not Applicable [XX Test Pressure - psig Test Temperature _ *F
9. Remarks:

Certificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: Z4 40 ý ISI COORDINATOR _ -/

4e.,Qg*;rr Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance pan Inspectign Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described Inthis report on _ .-/L ,.2005_ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xi of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any Irsonal Injury or property damage or a loss of any kind arising from or connected with this inspection.

Date:__ _ Inspector. Commissions:

(State or Province,11932, NB7742NISB National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 05-30-2002 P.O. Box 805379. Chicago IL, 60680-5379 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)

WA QQ~lnlgq7..l1 PLAN 2-01-005

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare Main Steam Isolation Crane None N/A S/N DRE 11-15 Unknown Repair No Valve Disc assembly 002 removed from 3-0203-2B.

Pilot disc for Spare Main Crane None N/A None Unknown Replaced No Steam Isolation Valve Disc assembly removed from 3 0203-2B.

Pilot disc for Spare Main Crane C8379 421597 N/A Cat ID-07996, UTC- Unknown Replacement No Steam Isolation Valve Disc 2065242.

assembly removed from 3 0203-2B.

II a ___________

.t ___________________________ a _____________________________________

A __________________

7. Description of work: Weld repair Stellite surfaces such as seating and guides along with replacing Pilot disc.
8. Test Conducted: Hydrostatic [ Pneumatic [ Nominal Operating Pressure [ ] Not Applicable [X]

Test Pressure _ psig Test Temperature _ OF

9. Remarks: NDE ( PT/MT surface) performed on disc excavations and final machined/welds.

j Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed f =ý ISI COORDINATOR , b-OL (Title) (Date)

I C-1 (Ofinert- Ownees Designee)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler InsuMce nd Inspectiqn Co. of Hartford, Connecticut having Inspected the REPAIRIREPLACEMENT described Inthis report on 0 .20eL--e d state to the best of my knowledge and belief, this repair or replacement has been constructed inaccordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal I ry or perty dignage or a loss of any kind arising from or connected with this inspection.

Date: "_ _*__ _ __ _ _ __hpecton

_,____,_ Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address)

Sheet: I Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 2
3. Work Performed By: Same as Above (Name) WO 99216199-01 PLAN 2-01-006 Same as Above (Address) Repair Organization P.O. No.. Job No. etc.
4. Identification of System: 0200 (Main Steam) (7
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacemernt 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare MSIV Disc Assembly Crane N/A N/A W099216199-01 Unknown Repair No Pilot Disc In Spare MSIV Crane Unknown N/A NIA Unknown Replaced No Disc Assembly Pilot Disc in Spare MSIV Crane D0231 N/A Cat ID 7996, Unknown Replacement No Disc Assembly UTC 2616195
4. 4. t4 I 4.

4 4. 4-4 + 4 4.

7. Description of work: Rebuild of spare valve disc assembly. Pilot disc replaced. Assembly returned to stock.
8. Test Conducted: Hydrostatic [ I Pneumatic [ ] Nominal Operating Pressure [ ] Not Applicable [ X Test Pressure - psig Test Temperature _ OF
9. Remarks:

I We certify that the stateprs made in this report are correct and Certificate of Compliance this REPAIRIREPLACEMENT Conforms to Section Xi of the ASME Code.

Signed : - ý',er's Designee)

ISI COORDINATOR (Title) it-(Date)

Z,. _

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance a: Inspecti*Co. of Hartford, Connecticut having inspected the REPAIRIREPLACEMENT described in this report on /-/ , 20_--end state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any peonal injury or property damage or a loss of any kind arising from or connected with this inspection.

7 Date: Inspector: i 4 1* ! § Jl Commissions: 11932, NB7742NISB

"(State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Companv (EGC. LLC) (Name) Date: 11-15-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: I Of _1_

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL., 60450 (Address) Unit: 2
3. Work Performed By: Same as Above (Name) WO 99248707-01 PLAN 2-01-007 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Main Steam Isolation Valve Crane 28 N/A None Unknown Repair No Disc, Removed from 2 0203-2B.

Main Steam Isolation Valve Crane 28 NIA Cat ID-1200124 Unknown Repaired No Disc, Removed from 2 0203-2B.

Main Steam Pilot Disc Crane Unknown N/A None Unknown Replaced No Main Steam Pilot Disc Crane C8379 N/A Cat ID-7996, UTC- 1999 Replacement No 2065242, Heat Code-34772

7. Description of work: Repaired main seat hard facing via weld build-up and machining using Stellite 21. Guide tabs repaired via weld build-up and machining. Pilot disc replaced. Disc returned to the Storeroom as a spare.
8. Test Conducted: Hydrostatic ] Pneumatic[ ] Nominal Operating Pressure [ Not Applicable [X]

Test Pressure __ psig Test Temperature _ OF

9. Remarks: None.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: ,ISI COORDINATOR 202, Cinl (O eirorOwners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurince gnd Inspection Co. of Hartford, Connecticut having Inspected the REPAIRIREPLACEMENT described in this report on .- /&L L ,2 -- nd state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or roperty damage or a loss of any kind arising from or connected with this inspection.

Date: 1L*/ Ag-Inspector: 44/TA Z 4 Commissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 12-11-2002 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: I Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 366858-01 PLAN 2-01-057

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No.. Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code ASME Section 111 1965 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 198-9 Edition, NO Addenda, Code Cases N-496-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Electromatic Relief Valve Dresser S/N: BK7082 N/A None N/A Repair No Electromatic Relief Valve Helicoil N/A N/A Cat ID-9759, UTC- N/A Installed for No Helical Threaded Inserts for 2644841 Repair Inlet Flange Stud Holes Inlet Flange Studs Unknown N/A N/A None N/A Replaced No Inlet Flange Studs Dresser Heat E54 NIA Cat ID 7970, UTC N/A Replacement No 2640366 Inlet Flange Stud Nuts Unknown N/A N/A None N/A Replaced No Inlet Flange Stud Nuts Dresser Heat DJ7 N/A Cat ID 35838, UTC NIA Replacement No 2637680 Valve Disc Dresser N/A N/A None N/A Replaced No N/ elceet N Dresser Heat 213821 N/A Cat ID5583, UTC N/A Replacement No 2001306

'-1 Valve Disc I ________________ ____________ ________________ .L ________ I _______________

7. Description of work: Rebuild of spare valve. Installed helical inserts per Code Case N-496-1 to repair the inlet flange stud holes. Replaced valve disc and inlet flange studs and nuts.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ ] Nominal Operating Pressure [ Not Applicable [ X Test Pressure - psig Test Temperature _ OF
9. Remarks:

Certificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed "a ISI COORDINATOR /2 -/1- ,zwL

< _

  • ror Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance end Inspection Co. of Hartford, Connecficut having Inspected the REPAIR/REPLACEMENT described In this report on 2.L-, 206,.Land state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described Inthis report. Furthermore, neither the Inspector nor his employer shalg be liable In any manner for any eo al lnjuor property damage or a loss of any kind arising from or connected with this inspection.

Date: J /"3- 0? inspector. __ __ __ __ __ __ _ Commissions: 1L932. NB7742NISB (State or Province, National Board)

"- I --

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI Date: 12-31-2002

1. Owner Exelon Generation Company (EGC. LLC) (Name) 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 2-01-058 (Name) wo RRg-O1
3. Work Performed By: Same as Above Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)

, 1965 Edition, NO Addenda, Code Cases NONE

5. (a) Construction Code ASME Section 11 N-496-1 (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO__._ Addenda, Code Cases
6. Identification of Components Repaired or Replaced and Replacement Components Mfrs. Nat Other Year Repair, Code Name of Name of Serial No. Brd ID Built Replaced or Stamped Component Manufacturer No Replacement Yes/No S/N: BK7053 N/A None N/A Repair No Electromatic Relief Valve Dresser N/A N/A Cat ID-9759, UTC- N/A Installed for No Electromatic Relief Valve Helicoil 2057695 Repair Helical Threaded Inserts for Inlet Flange Stud Holes N/A N/A None N/A Replaced No Inlet Flange Studs Unknown Heat E54 N/A Cat ID 7970, UTC N/A Replacement No Inlet Flange Studs Dresser 2640366 N/A N/A None N/A Replaced No Inlet Flange Stud Nuts Unknown Heat DJ7 N/A Cat ID 35838, UTC N/A Replacement No Inlet Flange Stud Nuts Dresser 2637680 Valve Disc Dresser N/A N/A None N/A Replaced No iValve Disc Dresser Heat 213821 N/A 2O01306 N/A plrJ II I__________________________ ___________________ I _______ I __________________________ I ____________ _______________________
7. Description of work: Rebuild of spare valve. Installed helical inserts per Code Case N-496-1 to repair the inlet flange stud holes. Replaced valve disc and inlet flange studs and nuts.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ Not Applicable [ X Test Pressure _ psig Test Temperature - F
9. Remarks:

Certificate of Compliance to Section XI of the ASME Code.

We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms Signed: ,e ý ý ISI COORDINATOR /2-3 /

(F7*&=n'or Owners Designee) (Title) (Date)

Certificate of Inspection Inspectors and the State or Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Steam and Boiler Insurancyand Inspec4ion Co. of Hartford, Connecticut having inspected the Illinois, employed by The Hartford REPAIRIREPLACEMENT described In this report on .f" . 20q_ and state to the best of my knowledge and belief, this repair or certificate neither the Inspector nor his employer replacement has been constructed In accordance with Section XI of the ASME Code. By signing this expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his makes any warranty, rsonal injury orproperty damage or a lossof any kind arising from or connected with this Inspection.

employer shall be liable In any manner for any Commissions: ,L932. NB7742NISB Date: /- 12. ... Inspector:

V (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 1-11-2003 REVISED P.O. Box 805379. Chicago IL.60680-5379 (Address) Sheet: 1 Of I S2. Plant: Dresden Nuclear Power Station (Name) Unit. 2 6500 North Dresden Road, Morris IL., 60450 (Address)
3. Work Performed By: Same as Above (Name) WO 00381568-01 PLAN 2-01-066 Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO
6. Identification of Components Repaired or Replaced and Replacement Components Addenda, Code Cases N-416-1 I

Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No I Replacement Yes/No Pipe line 2-1510-8"-D weld Unknown N/A N/A P & ID: M-29-ShL 2 N/A Repaired No immediately downstream of pump 2-1501-44B.

Pipe line 2-151 0-8-D weld Unknown N/A N/A P & ID: M-29-ShL 2 N/A Repair No immediately downstream of pump 2-1501-44B.

7. Description of work: Weld repair through wall leakage on 8"elbow to flange weldment.
8. Test Conducted: Hydrostatic[ ] Pneumatic[ ] Nominal Operating Pressure [X] Not Applicable[ ]

Test Pressure 190 psig Test Temperature Ambient OF

9. Remarks: Acceptable VT-2 examination after repairs.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed "9 ISI COORDINATOR /-/40 ,20Q S"(OfieferOwners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insuano pndInspectdl Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on ./L . .20 _ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any persona njury or property damage or a loss of any kind arising from or connected with this Inspection.

D*t*: /-/916 '- Alnsnacorner :.dr Commissions: 11932. NB7742NISB dr" r"

  1. 4 -d I JF e (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI 4 r%.. C I KI .4-I. UWl I*1 * .. . W a, k1mallml Date: 1-11-2003 REVISED P.O. Box 805379. Chicago IL. 60680-5379 (Address)

Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 2 WO 03746g5-n1 PLAN 2-fl1-10;3
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 3900 (CCSW)
5. (a) Construction Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases N-416-1 I
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Pipe line 2/3-39251-3"-DX. Unknown None N/A P & ID M-3121, N/A Replaced No associated with 2/3 9400-102 Refrigeration Condensing Unit.

Pipe line 2/3-39251-3"-DX, Unknown HT#-Y67155 N/A Cat. ID-385642, N/A Replacement No sch.80, A-106 Gr.B UTC-2048190.

I I I I 4 I

7. Description of work: Replaced a section of vertical pipe that developed a leak.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [X] Not Applicable [ ]

Test Pressure 178 psig Test Temperature 71.4 OF

9. Remarks: VT-2 was performed, and no leakage was detected.

[ Certificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

I Signed: -Z

.1 or Owners Designee)

- ISI COORDINATOR (Title)

/-/&

(Date)

.* 20V...

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurae a nspectjo Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT descrtied In this report on / .20. and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or p perty damage or a loss of any kind arising from or connected with this inspection.

Date: !/lŽŽ- . Inspector )t?, t4 .5 Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: I Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 379171-01 PLAN 2-02-003

3. Work Performed By: Same as Above (Name)

(Address) Repair Organization P.O. No., Job No. etc.

Same as Above

4. Identification of System: 0200 (Main Steam)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare MSIV Disc Assembly Crane NWA N/A W0379171-01 Unknown Repair No Pilot Disc in Spare MSIV Crane Unknown N/A N/A Unknown Replaced No Disc Assembly Pilot Disc In Spare MSIV Crane D0483 N/A Cat ID7996, Unknown Replacement No Disc Assembly UTC 2631338 disc assembly. Pilot disc replaced. Assembly returned to stock.

/7. Description of work: Rebuild of spare valve

8. Test Conducted: Hydrostatic [ ] Pneumatic [ Nominal Operating Pressure [] Not Applicable [X]

Test Pressure psig Test Temperature _ *F

9. Remarks:

Certificate of Compliance We certify t the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Sign:6/ 'O Owner's Designee)

ISI COORDINATOR (Title) 2-2l?

(Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance InspectiogCo. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on / -/.L" . and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described In this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any pe rsal Injury or property damage or a loss of any kind arising from or connected with this inspection.

Date:___________ Inspector. _ _ _ _ _ _ _ Commissions: 11932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC. LLC) (Name) Date: 01-10-2003 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: _I_ Of 1_!_

. I) 01611 tl,.alI

ý 2. Plant: Dresden Nuclear Power Station KI I Unit: 2(3) 6500 North Dresden Road, Morris IL. 60450 (Address)

Dfl VO DnIce DI AiN 2.J~fl*NV'

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0200 (Main Steam)
5. (a) Construction Code ASME Section III 19_0: Edition, W68 Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
  • in conjunction with GE Specification 21A9206, Rev. 6
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Main Valve Body Target Rock 223 N/A None Unknown Replaced No Main Valve Body Target Rock 214 N/A None Unknown Replacement No Pilot Disc Target Rock Unknown N/A None Unknown Replaced No Pilot Disc Target Rock 444 N/A None Unknown Replacement No
7. Description of work: Repairs made to valve by OEM. Replaced pilot disc and main valve body. Valve retumed to stock.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [ Not Applicable [ X Test Pressure __psig Test Temperature OF K>9. Remarks: None.

j Certificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed;A- ( eoO ISI(eOORDINATOR )4'

((N., l- rIor Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurapce arrnJnspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on IL-1,Y 200f and state to the best of my knowledge and belief, this repair or replacement has been constructed Inaccordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be fliable in any manner for anyional injury or property damage or a loss of any kind arising from or connected with this Inspection.

i-'4r-05 Inspector ii'n,* h",j', 'li../i' Commissions: 1L932. NB7742NISB I *A~ f A, (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 4/16/01

1. Owner Exelon Nuclear Sheet: 1 Of 1 P.O. Box 805379. Chicaqo IL. 60680-5379 (Address)

(Name) Unit: 3

2. Plant: Dresden Nuclear Power Station 6500 North Dresden Road, Morris IL.. 60450 (Address) WR 990239601-02 (PLAN 3-00-063)

(Name) Repair Organization P.O. No., Job No. etc.

3. Work Performed By: Same as Above Same as Above (Address)
4. Identification of System: 5700 Heating Nentilation (1500 CCSW Vault Room Coolers) 1967_ Edition, NO Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1.0 ,

N-416-1 (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases

6. Identification of Components Repaired or Replaced and Replacement Components Mfrs. Nat Other Year Repair, Code Name of Name of Serial No. Brd ID Built Replaced or Stamped Component Manufacturer Replacement Yes/No No _

N/A N/A 3-5700-30A N/A Repair No 3-5700-30A CCSW Vault Unknown Room Cooler

,7.Description of work: Repaired cooler tube leak by brazing.

8. Test Conducted: Hydrostatic [ ] Pneumatic [ Nominal Operating Pressure [X] Not Applicable []

Test Pressure 170 psig Test Temperature Norm OF

9. Remarks: Performed VT-2 during system operation at nominal operatinq pressure.

Certificate of Compliance Xl of the ASME Code.

We certify that the statements made In this report are correct and this REPAIR Conforms to Section S ignedd:A ISICOORDINATOR.. '41 (Date)

-L' 2opi

,/ er or Owners Designee) (Title)

Certificate of Inspection Vessel Inspectors and the State or Province of I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure having inspected the REPAIR described in Illinols, employed byTh Hartford Steam and Boller Insurance and Inspection Co. of Hartford, Connecticut this report on Tq - 71 , 20WL_ and state to the best of my knowledge and inspector belief, nor this his repair employer or replacement makes any has been constructed in accordance warranty, expressed or implied, with Section XI of the ASME Code. By signing this certificate neither the shall be liable in any manner for any conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his employer inspection.

personal injury or property damage or a loss of any ind asing fromor connected with this k Commissions: 1-932. NBT742NISB Date:__________lnspectoc. 4 ý7 (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section X1 (Name) Date: 12-18-2002

1. Owner. Exelon Generation Company (EGC. LLC) 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL. 60450 (Address) PLAN 3-01-002 WO 99167257-01
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 5700 (HPCI Room Cooler/CCSW)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE 198.9 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3-5747 HPCI Room Cooler Buffalo Forge Unknown N/A Buffalo Forge Cooler N/A Replaced No Coil Cabinet Model G-123HV 3-5747 HPCI Room Cooler Aerofin Corp 020717 N/A Cat ID 22066 N/A Replacement No Coil UTC- 2650215 Unknown N/A N/A Cooler 3-5747 N/A Replaced No 2" Flanges Unknown Heat OCO N/A Cat ID555043 N/A Replacement No 2" Flanges UTC 2658437 II

______________ .- - I 4 I I I I

7. Description of work: Replaced existing cooler coil and inlet/outlet flanges.
8. Test Conducted: Hydrostatic[] Pneumatic[ ] Nominal Operating Pressure [X] Not Applicable []

Test Pressure 189 psig Test Temperature Nominal OF

9. Remarks:

Certificate of Compliance We certify that the stateme s made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

"Signed:t&L ;A -, ISI COORDINATOR #,2. -J3 ,,.o,.

  • [a1aip*(Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insu nce a Inspebn Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described inthis report on _ - 20OZ_ Und state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any persZl Injury or proe rty damage or a loss of any kind arising from or connected with this inspection.

Date: " //f -.. i Commissions: 11.932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI SDate: 2-6-2001

1. Owner Exelon Nuclear (Name) Sheet: I Of .

P.O. Box 805379. Chicago IL.60680-5379 (Address)

Jnit: 3

2. Plant: Dresden Nuclear Power Station .(Name)t 6500 North Dresden Road. Morris IL. 60450 (Address) (PLAN 3-01-003)

Re 980107896-01 .0. No., Job No. etc.

Same as Above (Name)

3. Work Performed By: (Address)

Same as Above

4. Identification of System: 1500 (Low Pressure Coolant Inection, Drywell Spray) 19 67 Edition, NO Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1.0 1989 Edition, N-"O Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacenent
6. Identification of Components Repaired or Replaced and Replacement Components RnnAIr Code of _____________

______________________________ ___________________.~ I R oar.

Name Of Name Manufacturer I ID ID Component Manufacturer Serial No. Replacement YsNo Component No 3-1509-16" N/A Support N/A WA Repair Une Unknown NIA N/A Support M-3413-25 Une 3-1509-16* Unknown required.

piping adjacent to support shear lugs. No repair welding

7. Description of work: Removed weld mate ial on

[ ] Not Applicable[ I K>.. p.Test Conducted: Hydrostatic ] Pneumatict I Nominal Operating Pressure Test Pressure WA psig Test Temperature WA *F

9. Remarks: Performed surface exam () a*ter final grinding.

Certificate of Compliance Confonrs to Section Xl of the ASME Code.

We certifythat at ements made in this report are correct and this REPAIR ISI COORDINATOR_ 2-IlO' ,20&.&

Sned :u m' (Date) r resDesignee) (ro~e)

Certificate of Inspection and the State or Province of by the National Board of Boner and Pressure Vessel Inspectors 1,the undersigned, holding a valid commission issued of Hartford. Connecticut having intspee the REPAIR described in artford ~a ndBie Insurance andknowledge Co.belief, Inspectionand this repair or replacement has been constructed In accordance Illinois, employed this report on irT ..1 , n state to the best of my expressed or implied.

with Section XI o the SME Code By signing this cerificate neither the inspector nor his employer makes any warranty,be liable in any manner for any neither the inspector nor his employer shall report. Furthermore, concerning the repair or replacement described inthis I from *on,.ced with this inspection.

personal injury or property damage or a loss of any k Commissions: IL932. NB7742NISB Date: 2 / Inspector. (State or Province, National Board)

K>

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI Date: 11-12-2002

1. Owner Exelon Generation Company (EGC. LLC) (Name) Sheet: 1 Of 200 Exelon Way, Kennett Square, PA 19348 (Address)

Unit: 3

.2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) EC 8231 WO 99254259 PLAN 3-01-004 (Name) Repair Organization P.O. No., Job No. etc.

3. Work Performed By: Same as Above Same as Above (Address)
4. Identification of System: 0300 (Sram Discha.rge Volume)

Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE

5. (a) Construction NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases Components
6. Identification of Components Repaired or Replaced and Replacement rI Stamped Name of - ______ -

Nat Other Year '.

I .---,-

repair, Name of Mfrs. N4at Other ID Built replacelr, ,

Name of Serial No. Brd Replaced or Stamped Yes/No Component Manufacturer No Replacement Unknown No None N/A Existing blind Replaced 6' Blind flanges. Unknown flanges.

Cat ID 1018648, Unknown Replacement No 6"Blind flanges. Unknown None N/A UTC 2652916; Cat ID 1018666, UTC 2652917.

None N/A Existing bolting Unknown I Replaced No 7/8" dia. Bolting (studs and Unknown consisting of studs nuts). and nuts.

Cat ID 1200180, Un~kn~own Replacement No Unknown None N/A UTC 2607188; Cat 7/8" dia. Bolting (studs and nuts). ID 37033, UTC 2400971,2616435, and 2645250; Cat ID 39851, UTC 2647926.

I I -______ A - ______

.4 1__________________ I _____________

New blind flanges have ports to facilitate hydrolazing..

7. Description of work: Removed/replaced existing blind flanges and bolting.

Pressure [X] Not Applicable [1

8. Test Conducted: Hydrostatic [] Pneumatic [] Nominal Operating Test Pressure 1575 psig Test Temperature Ambient OF DOS 0300-12.
9. Remarks: An acceptable VT-2 accomplished during the performance of Certificate of Compliance Code.

this REPAIR/REPLACEMENT Conforms to Section XI of the ASME We certify that the statements made in this report are correct and

-

  • ISI COORDINATOR //',,(n .20-0._

Signed:-A J/f or Ow (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the Nationalnspection Board of Boiler and Pressure Vessel Inspectors and the State or Province of Boiler Insura 4and Co. of Hartford, Connecticut having inspected the Illinois, employed by The Hartford Steam and state to the best of my knowledge and belief, this repair or REPAIRIREPLACEMENT described inthis report on _. L;, Y , 20L7and replacement has been constructed inaccordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer concerning the repair or replacement described inthis report. Furthermore, neither the inspector nor his makes any warranty, expressed or implied, damage or a loss of any kind arising from or connected with this inspection.

employer shall be liable inany manner for any persnal injury or prorty Inspector. _ Commissions: 11932, NB7742NISB Date: /".c/"Ž (State or Province, National Board)

K~~i

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI Date: 11-12-2002

1. Owner: Exelon Generation Company (EGC, LL) (Name) 200 Exelon Way, Kennett Square, PA 19348 (Address) Sheet: 2 Of 2 K 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

EC 8231 WO 99254259 PLAN 3-01-004

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0300 (Sram Discharge Volume)
5. (a) Construction Code USAS B31.1-0 , 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, N.O Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Manufacturer Serial No. Brd ID Built Replaced or Stamped Component No Replacement Yes/No 1-1/8" dia. Bolting (studs Unknown None N/A Existing bolting Unknown Replaced No and nuts). consisting of studs and nuts.

Unknown None N/A Cat ID5863, UTC Unknown Replacement No 1-1/8" dia. Bolting (studs and nuts). 2645244; Cat ID 538329, UTC 2647927; Cat ID 1200741, UTC 2607232.

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 7-16-2001 P.O. Box 805379. Chicago IL,60680-5379 (Address) Sheet: 1 Of 1
2. Plant Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL., 60450 (Address)
3. Work Performed By: Same as Above (Name) W/O 99259548 (PLAN 3-01-005)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 3900 (DGSW Keeo RII Supplv to CCSW)
5. (a) Construction Code USAS B31.1.0 . 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, CodeCases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No DGSW Keep Fill Supply to Edwards Valves Unknown N/A EPN 3-3999-640 N/A Replaced No CCSW Check Valve DGSW Keep Fill Supply to Edwards Valves Unknown N/A EPN 2-3999-642 N/A Replaced No CCSW Check Valve DGSW Keep Fill Supply to Velan Valve Corp. Unknown N/A EPN 3-3999-640 N/A Replacement No CCSW Check Valve DGSW Keep Fill Supply to Velan Valve Corp. Unknown N/A EPN 3-3999-642 N/A Replacement No CCSW Check Valve DGSW Keep Fill Supply to N/A N/A NA Dwg M-4333 N/A Repair No CCSW Support WO 99259548
7. Description of work: Replaced CCSW check valves with new check valves and relocated one support.
8. Test Conducted: Hydrostatic [ Pneumatic I I Nominal Operating Pressure [ X ] Not Applicable [ ]

Test Pressure 192 psig Test Temperature Ambit OF

9. Remarks:

Certificate of Compliance We certify thatpe statements made In this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

_____________________ 151ýIS COORDINATOR "1/1(0 20-.ýL Owner or Owner's Designee) (Titme) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insura pecPo9 Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT descnrbed In this report on 7 "/Z 20.WL and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this cerlfficate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement descnbed in this report Furthermore, neither the Inspector nor his employer shall be liable In any manner for anyyprsonal injury or 'opery damage or a loss of any kind arising from or connected with this inspection.

Date: Inspector: Commissions: 11932, NB7742NISB

", (State or Province, National Board)

FORM NIS2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear _(Name) Date: 5-14-2001 P.O. Box 805379. Chicago IL.60680-5379 (Address)

Sheet: l1 Of I

2. Plant: Dresden Nuclear Power Station IIM,..*m*A
  • II Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address)

WR 990269491 (PLAN 3-01-0061

3. Work Performed By: Same as Above (Name)

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 3900 (Service Water Suwolv ECCS Room Coolers)
5. (a) Construction Code USAS B31.1.0 . 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used jor Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Service water to ECCS Powel Unknown N/A 3-3999-252 N/A Replaced No check valve Service water to ECCS Velan Valve 025099-VLV- N/A 3-3999-252 N/A Replacement No check valve 02/03/04
7. Description of work: Removed exdsting check valve and replaced new stainless steel swing check valve.

Test Conducted: Hydrostatic [] Pneumatic [ ] Nominal Operating Pressure [ XI Not Applicable [ ]

Test Pressure 86 psIg Test Temperature 80 OF

9. Remarks:

Certificate of Compliance We certify that the statements made In this report are correct and this REPLACEMENT Conforms to Section )a of the ASME Code.

Signed: ortOnsDie ISI COORDINATOR '511q 20e1 d~7o (Owner or Owner~s Designee) (Tite) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Har"i St d BIlr Insurance and Inspection Co. of Hartford, Connecticut having inspected the REPLACEMENT described in this report on Z 20*-- and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section )I of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or.

Implied, concerning the repair or replacement described in this report Furthermore, neither the Inspector nor his employer shall be liable In giny manner for any personal Injury or property damage or a of any :m oos acted with this Inspection.

Date: /inspector 7A Commissions: 11932. NB7742NISB

"(Stateor Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear (Name) Date: 3-22-2002 P.O. Box 805379. Chicago IL.60680-5379 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address) (PLAN 3-01-0081 Wio ggO'200g-a1
3. Work Performed By: Same as Above (Name) W

.... 0 .. ..... .

(P. .....

A ..

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Standby Uauid Control)
5. (a) Construction Code USAS B31.1.0 19-§7Z Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Standby Uquld Control Unknown Unknown N/A EPN 3-1105B Unknown Replaced No Pump Discharge Relief Valve Standby Liquid Control Crosby Valve and UTC 2611955 N/A EPN 3-1105B Unknown Replacement No Pump Discharge Relief Gage Co.

Valve

7. Description of work: Replaced bolted in relief valve with like for like replacement.

B. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [X ] Not Applicable [ ]

Test Pressure 1330 psig Test Temperature Ambient OF

9. Remarks:

I Certificate of Compliance We certify that the statemeqnn made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR -- - ., -"

" 200j, or Owner's Designee) (Title) (Date)

U i

Cerbtficate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Ha ,ford St Boilerrnspection & Insurance Company of Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on __ ___ _ 201ýL-zBnd state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kiM arising from occnected with this inspection.

Date: 3'Con"LnpetrK1 V Z~1 o m susions: IL932. NB7742NISB a (State or Province, National Board)

FORMI NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Reqitired 6y the Provisions of ASME Code Section XI (Name) Date: 8-9-2001

1. Owner: Exelon Nuclear P.O. Box 805379. Chlcago IL.60680-5379 (Address) Sheet: .... Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.60450 (Address) W/O 99214665-01 (PLAN 3-01-009)
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Standby Liauld Control)
5. (a) Construction Code USAS B31.1.0 196"7 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19889 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Component Manufacturer Serial No. Brd ID Built Replaced or Stamped

,_ No Replacement Yes/No Hancock Unknown N/A EPN 3-1101-43B N/A Repair No 3B StandbyUquid Control Pump Discharge Check Valve Body-to-Bonnet Seal Weld seal weld.

ýý7. Description of work Removed exdstinq seal weld for Internal check valve Inspection. Repaired bonnet, and rewelded

8. Test Conducted: Hydrostatic [ Pneumatic [] Nominal Operating Pressure [ X Not Applicable [

Test Pressure 1325 pslg Test Temperature Ambient OF

9. Remarks:

Certificate of Compliance We certify thatestatem nts)w e In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed : ISI COORDINATOR -64 ,20!nC

( ___IOwnsaOr-6vner's Designee) M(-rGe) (Date)

Certificate of Inspection of I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province Illinois, employed by The Hartford Steam and Boiler Insur ce d Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this repoton *.J . 20**L and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes anyshall warranty, expressed or implied, concerning the repair or replacement neither the inspector nor his described in this reporL Furthermore,connected employer beable In any manner for anydaage or a loss of any Idnd arising from or with this inspection.

Date: f'*/1- / Inspector._ _ __ _ _ _ _ _ _ Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI Date: 12-25-2001

1. Owner: Exelon Corporation. LLC. (Name)

Sheet: .I._ Of 1 P.O. Box 805379.:Chlcaqo IL.60680-5379 (Address)

Unit _.3.

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL., 60450 (Address) PLAN 3-01-010 WA ="A1P3,M-01
3. Work Performed By- Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: *2300 HPCI)

, 1967 Edition, NO Addenda, Code Cases NONE

5. (a) Constructon Code USAS B31 .1.0 NONE (b) Editlon of Section XI used for Repair/Replacement 19_9 Edition, NO Addenda, Code Cases
6. Identification of Components Repaired or Replaced and Replacement Components Mfrs. Nat Other Year Repair, Code Name of Name of Manufacturer Serial No. Brd ID Built Replaced or Stamped Component Replacement Yes/No No N/A EPN: 3-2301-45 N/A Replaced No 24" flanged check valve on Atwood & Morrill Co. N/A pipe line 3-2306-24".

1-11983-01 N/A Cat ID 38267, N/A Replacement No 24" flanged check valve on Atwood & Morill Co.

pipe line 3-2306-24", EPN: UTC-2067733 3-2301-45.

7. Description of work: Removed and replaced flanqed-4n 24" check valve as a PM.

Pneumaticj ] Nominal Operating Pressure [X] Not Applicable [ ]

3. Test Conducted: Hydrostatic [ ]

Test Pressure 25 psig Test Temperature bAmbent F

9. Remarks: Acceptable VT-2 examination was performed. of Compliance SCerifi;cate Conforms to Section XI of the ASME Code.

We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT ISI COORDINATOR 01...__, 2002

.____Feb.

Signed": J -*-ý- - -

(Date)

((Owneror ewfs gnee) (Title)

I U I.4I.-. ,f nsn-i'tln Pressure Vessel Inspectors and the State o Province of 1,the undersigned, holding a valid commission issued by the National Board of Boiler and d itspt 2--L02oZ-Illinois, employed by Hartford Steam Boiler of CT having inspecte te EP*.r/REPLACE.ENT best of my knowiedge and belief, this repair or replacement has been constructed Inaccordance with Section Xl of the ASME Code. By and state to the or implied, concerning the repair or replacement described signing this certificate neither the Inspector nor his employer makes any warranty, expressed for any personal Irjury or property damage or a loss of in this report Furthermore, neither the Inspector nor his employer shall be liable in any manner any kind arising from or connected with this Inspection.

Commissions: L932. NB7742NISB Date: "n1/- pe to. Robert T.-ainey (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 11-14-2002 inn fl~fl FIoy~n F-nw Wnv K~nn~ff ayw ........

Ke netltn Sanure.

........ r PA. 19348 (Address) Sheet: I Of I

2. Plant: Dresden Nuclear Power Station *w*t wgq*l Unit: 3 6500 North Dresden Road, Morris IL. 60450 (Address) PLAN 3-01-011 WO 99214704-O1
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code ASME Section III 19_0 Edition, N.O. Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19&9 Edition, NO Addenda, Code Cases N-496-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Electromatic Relief Valve Dresser BK7079 N/A None Unknown Repair No Inlet flange stud holes, Removed from 3-0203-3B.

Electromatic Relief Valve Helicoil BK7079 N/A Cat ID-9759, UTC- Unknown Repaired No Inlet flange stud holes, 2057695.

Removed from 3-0203-3B.

Inlet flange studs Unknown Unknown N/A None Unknown Replaced No Inlet flange studs Dresser Heat Code - N/A Cat ID-7970, UTC- Unknown Replacement No C446 2620505 i , Inlet flange studs nuts Unknown unknown NiA, None I ~dflO II~dUWI UnIInIowI epa LA 1 4. 4 4 1 1 1 Inlet flange studs nuts Dresser Heat Code N/A Cat ID-35838, UTC Unknown Replacement No A7 2612562

_ _J I Ine flange__ studs_ nuts__

7. Description of work: Installed helicoils Per Code Case N-496-1 to repair the inlet flancie stud holes. Replaced Inlet flange studs and nuts. Valve returned to the Storeroom as a spare.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ Not Applicable [ X Test Pressure _ psig Test Temperature -F _
9. Remarks: None.

I tCertificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

S"-ged ISI COORDINATOR .2002 (Title) (Date)

ý Owner's Designee) 6 Certificate of Inspection I, the undersigned, holding a vald commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurancemand Inspectigpn Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on ` 7 .20!!__ and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or knplied, concerning the repair or replacement described in this report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any pesonajury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: Inspector Commissions: 11-932. NB7742NISB (State or Province, National Board) 9 -

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 11-13-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: _1_ Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address) PLAN 3-01-012 WO *Q214701-01
3. Work Performed By:. Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code Section III 1965 Edition, N.O Addenda, Code Cases NONE 19_M Edition, NO Addenda, Code Cases N-496-1 (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped Replacement Yes/No

-No Dresser BK7050 N/A None Unknown Repair No Electromatic Relief Valve Inlet flange stud holes, Removed from 3-0203-3E.

Electromatic Relief Valve Helicoil BK7050 N/A Cat ID-9759, UTC- Unknown Repaired No Inlet flange stud holes, 2057695.

Removed from 3-0203-3E. I I

4. 4 1 I
4. 4 4-1 1 I I 4 1 1

____________ ________________ .1. ________ _______________

Description of work: Installed helicoils per Code Case N-496-1 to repair the Inlet flange stud holes. Valve returned to the Storeroom as aspare.

8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ I Not Applcable [ X Test Pressure _ psig Test Temperature __F
9. Remarks: None.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Signed:- 1 d ISI COORDINATOR ý/ -1/ ,2002 7(Cw rs Designee) (Title) (Date)

Certificate of Inspection or Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State Illinois, employed by The Hartford Steam and Boiler Insurance and Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on /. . .200_.__ and state to the best of my knowledge and belief, this repair or his employer replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor nor his makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the inspector be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

employer shall Date: IInspector: . .. . Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (PName) Date: 12-30-2002

1. Owner: Exelon Generation Comp~any (EGC. LLC) 9fIA Fwlnn Wiv~K~nnett Sauare. PA. 19348 Snuare PA 19348 (Address) Sheet: ._L_ Of I win P-Inn wnv Kpnnp"
  • '2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address) PlAN 3-01-014 WA AAflQ1-fld
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 2300 (HPCI)
5. (a) Construction Code USAS B31.1.0 19r7 Edition, NO. Addenda, Code Cases NONE 1989 Edition, N.O Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Stamped Manufacturer Serial No. Brd ID Built Replaced or Component Yes/No No Replacement Grinnell Fig. 211 N N/A Unknown Unknown Replaced No Strut Assembly at EPN M-1187D-80 Grinnell Fig. 21 IN N/A Cat ID-1222797, Unknown Replacement No Strut Assembly at EPN M-1187D-80 UTC- 2607558 Unknown Unknown N/A Unknown Unknown Replaced No Baseplate at EPN M-1187D-80 Unknown Heat Code: N/A Cat ID-514709, Unknown Replacement No Baseplate at EPN M-1187D-80 U1192 UTC- 2060149 Hilti Unknown N/A Unknown Unknown Replaced No Expansion Anchors at EPN M-1 187D-80 Hilti P/N : 45416 N/A Cat ID-38613, UTC- Unknown Replacement No Expansion Anchors at EPN M-1 187D-80 2022420
7. Description of work: Replaced HPCI strut, baseplate and expansion anchors.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ ] Not Applicable [ X Test Pressure _ psig Test Temperature __ OF r
9. Remarks: Visual Examination completed after installation.

Certificate of Compliance Xl of the ASME Code.

We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Signed:  : ISI COORDINATOR /- -

(Date)

Cor Owner's Designee) (Title)

Certificate of Inspection Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Illinois, employed by The Hartford Steam and Boiler InsuranceAad Inspectigp Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on /L-/Lk 209_g_ and state to the best of my knowledge and belief, this repair or nor his employer replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his expressed or Implied, conceming the repair or replacement described in this report. Furthermore, neither the inspector makes any warranty, orper damage or a loss of any kind arising from or connected with this Inspection.

employer shall be liable in any manner for any pe nalj Date: /-" - 10? Inspector (Stt Commissions: 11-932. NB7742N)SB Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LIC) (Name) Date: 11-15-2002Q 200 Exelon Way. Kennett Sguare. PA. 19348 (Address)

Sheet: _I Of._!I_

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL.. 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) WO 386418-03 PLAN 3-01-018 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 0201 (Reactor Vessel and Head)
5. (a) Construction Code ASME Section III 1965 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd No ID Built Replaced or Stamped Replacement Yes/No Reactor Vessel Flange Babcock & Wilcox 610-0111-51-52 N-139 3-0201 1969 Repaired Yes Reactor Head Flange Babcock &Wilcox 610-0111-51-52 N-139 3-0201 1969 Repaired Yes
7. Description of work: Repaired cladding on Reactor flanace and Reactor Head flange via weld build-up and machining.

S. Test Conducted: Hydrostatic [] Pneumatic [] Nominal Operating Pressure [ ] Not Applicable [X]

Test Pressure _ psig Test Temperature __F

9. Remarks: PT performed on excavated areas odor to welding and on repaired areas in the finished condition.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Signed : .*, /' ISI COORDINATOR /12-,0 ,2002 V (Owre[:Vner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance and Inspection Co. of Hartford, Connecticut having inspected the REPAIRIREPLACEMENT described in this report on J/, 3. , 2q0_-and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal in*ury or Property damage or a loss of any kind arising from or connected with this inspection.

Date: J LL'A.* Inspector_ l*--.tdU4'1 Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Nuclear _(Name) Date: 03-21-2002 P.O. Box 805379. Chicaao IL, 60680-5379 (Address)

P.O. Box 805379. Chicamo Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) W/O 397285 IPLAN 3-01-0221 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 1300 (Isolation Condenser)
5. (a) Construction Code ASME Section III . 19 65 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd No ID Built Replaced or Stamped Replacement Yes/No Isolation Condenser 3-1302 Struthers Wells Corp. 66-2-5637-2 12877 EPN 3-1302 1967 Repair Yes
7. Description of work: Cut diaphragm plate seal weld to access tube bundle. Seal welded diaphraqm elate upon closure of vessel.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ ] Not Applicable Test Pressure N/A psig Test Temperature N/A OF
9. Remarks: NDE performed on root pass and final pass of seal weld.

Certificate of Compliance We certify that the ste made Inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR 4'#_ 2O0 0tt I . or Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Haf Boiler Inspection & Insurance Company of Connecticut having Inspected the REPAIR/REPLACEMENT described In this report on . S .. 20C'-,'-nd state to the best of my knowledge and belief, this repair or replacement has been constructed in

,2U accordance with Section X) of the ASME Code. By signing this certificate neither the Inspector nor his emploier makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of rid arisng from or nected with this inspection.

Date: ,

  • t)'inspector:

0* z Comrmissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section MI

1. Owner: Exelon Nuclear (Name) Date: 3-22-2002 P.O. Box 805379. Chicaa]o IL,60680-5379 (Address)

P.O Bx857.Ci1ag Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3 WKr) QQ~l1FK11A'4-f (pl AN .4-fl9..flf1 \
3. Work Performed By: Same as Above (Name) F Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 3900 (Diesel Generator Cooling Water)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Diesel Generator Cooling Unknown Unknown N/A EPN 3-3930-501 Unknown Replaced No Water Pump Discharge Check Valve Diesel Generator Cooling Gulf Valve 32309-1-2 N/A EPN 3-3930-501 Unknown Replacement No Water Pump Discharge Check Valve
7. Description of work: Reolaced bolted In dual disc check valve with like for like replacement.
8. Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [X] Not Applicable Test Pressure - 66 psig Test Temperature mbient OF
9. Remarks:

I Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed- ISI COORDINATOR 5 Z Z. 20AP.

or Owner's Designee) (Title) (Date)

I I Certificate of Inspection I, the undersigned, holdinga valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartf9rd Steam Boiler Inspection & Insurance Company of Connecticut having inspected the REPAIR/REPLACEMENT described In this report on .j , 20./' and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss oJny kind arisinJom or connected with this inspection.

Date: 3- .....

6 ,- r" ......

C m a19 NR77A~m.e.

io ,nnedor (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC. LLC) (Name) Date: 12-31-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: I. Of 1

2. Plant Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3 WO3 RgR70-f11 Pt AN .i-fl:).tfl9
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 2300 (HPCl)
5. (a) Construction Code USAS B31.1.0, 19_7 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Check valve at EPN Crane Nuclear Unknown N/A N/A N/A Replaced No 3-2301-45 Check valve at EPN Crane Nuclear Sl-11983-01 N/A Cat ID-1233639, N/A Replacement No 3-2301-45 UTC- 0002652960.
7. Description of work: Reolace the check valve with a refurbished one rotated from stock.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [ X j Not Applicable [1 Test Pressure 26 psig Test Temperature Ambient OF
9. Remarks: Satisfactory VT-2 performed.

Certificate of Compliance We certify that the statements made Inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: 19 1 a - ISI COORDINATOR /____&_____ 03 Owners Designee) (Ttle) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boier Insurapce qnd Inspectio.Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on J-/ ,.20!f. and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or roperty damage or a loss of any kind arising from or connected with this inspection.

Date: I7/' " Inspector. ./Commissions: 11932. NB7742NISB J (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Companv (EGC. LLC) (Name) Date: 11-06-2002 200 Exelon Way. Kennett Square. PA. 19348 (Address)

Sheet: I.._ Of I.

2. Plant: Dresden Nuclear Power Station I5aI I I) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3 WA' QQA21RE."-flI Pl AN t.'-f1l1-flA
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code *ASME Section III 1965 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE

- General Electric APED Specification 21A5744.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Electromatic Relief Valve at Dresser Industries S/N: BK7081 N/A Type 1525VX Unknown Replaced Yes EPN: 3-0203-3C.

Electromatic Relief Valve to Dresser Industries S/N: BK7082 NWA Cat ID-42845, UTC- Unknown Replacement Yes EPN: 3-0203-3C. 2652974

7. Description of work: Removed existing ERV and replaced with a rebuilt spare ERV.
8. Test Conducted: Hydrostatic [X] Pneumatic [ ] Nominal Operating Pressure [ ] Not Applicable []

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded dudngq the D2R17 10 Yr Hydro under WO 99252183-10.

Certificate of Compliance We certify tha the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed:A W11 ISI COORDINATOR AZ OL

/, , oor Owners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance Lnd Inspectio ,Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described inthis report on . 2Q._

L/j and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section I of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for anyerso al inju*pr rproperty damage or a loss of any kind arising from or connected with this inspection.

Date: /

  • _ Inspector. *_ 4/ 4 UA Commissions:

(State 11932. NB7742NISB or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

,. IU5I

  • A. AilICI. AImII onLIUII III a,,l. lI;J D. IL...rI ,INIC)III Date: 01-14-2003 200 Exelon Way. Kennett Square. PA. 19348 (Address)

Sheet: __I__ Of _1_

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL. 60450 (Address) Unit: 3 DI AM *i)AlJ'_J
3. Work Performed By: Same as Above (Name) Reai Organ3zatr.

Repair Organization PItO No.-*,J P.O. No., Job No-.-e-tc No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code 'ASME Section III 1965 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19889 Edition, NO Addenda, Code Cases NONE

- General Electric APED Specification 21A5744.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Electromatic Relief Valve at Dresser Industries S/N: BK7083 N/A Type 1525VX Unknown Replaced Yes EPN: 3-0203-3D.

Electromatic Relief Valve to Dresser Industries S/N: BK7053 N/A Cat ID-42845, UTC- Unknown Replacement Yes EPN: 3-0203-3D. 2652976

7. Description of work. Removed existing ERV and replaced with a rebuilt spare ERV.
8. Test Conducted: Hydrostatic [X] Pneumatic [ ] Nominal Operating Pressure [ I Not Applicable []

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Satisfactory Vr-2 examination was recorded during the D2R17 10 Yr Hydro under WO 99252183-10.

Certificate of Compliance We certify that e statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: k - ISI COORDINATOR 1-14 -o3 d " (ol rý r Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance ajdLnspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on /-"/ . 20 _.& and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or impfled, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any peoronal injury or property damage or a loss of any kind arising from or connected with this inspection.

4 Date: /-*§*- 06 Insoector.7 X4' ý - Commissions: IL932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation ComDanv (EGC. LLC) (Name) Date: t11-05-2002 200 Exelon Way. Kennett Sauare. PA. 19348 (Address)

Sheet: 1 Of 1.

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) AWflnn4nA fl4 nl ~ fl~ ~l Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code *ASME Section III 1965 Edition, S/66 Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE

" General Electric APED Specification 21A5743, rev.1.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Consolidated Safety Valve Consolidated S/N: BK6528 N/A Model: 3777-QA-RT- Unknown Replaced Yes at EPN: 3-0203-4D. 21-0SI10 Consolidated Safety Valve Consolidated S/N: BK6532 N/A Cat ID-30446, UTC- Unknown Replacement Yes at EPN: 3-0203-4D. 2649720
7. Description of work: Removed existing safety valve and replaced with a rebuilt/tested soare safety valve.
8. Test Conducted: Hydrostatic [X] Pneumatic[ ] Nominal Operating Pressure[ I Not Applicable [(

/ Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded during the D3R17 10 Yr Hydro underWO 99252183-10.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signede ISI COORDINATOR 1-4-)0 2002 Owners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurapcajnd Inspectigp Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on "L7 , 220LL and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any rsonal,njury or poerty damage ora loss of any kind arising from or connected with this inspection.

Date:

Date:

- Inse X;(StateL 7- Commissions: 11-932, NB7742NISB or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 11-05-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: I._ Of I K- 2. Plant: Dresden Nuclear Power Station ke5llj 110) 6500 North Dresden Road, Morris IL. 60450 (Address) Unit: 3 WA* _QQfl*(flf./~11 Pl AN ."-.tl9-f.n7

3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code *ASME Section III 19 65 Edition, S166 Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
  • General Electric APED Specification 21A5743, rev.1.
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Consolidated Safety Valve Consolidated S/N: BK6265 N/A Model: 3777-QA-RT- Unknown Replaced Yes at EPN: 3-0203-4B. 21-OSI10 Consolidated Safety Valve Consolidated S/N: BK6263 N/A Cat ID-30446, UTC- Unknown Replacement Yes at EPN: 3-0203-4B. 2649719
7. Description of work: Removed existing safety valve and replaced with a rebuilt/tested spare safety valve.
8. Test Conducted: Hydrostatic [X ] Pneumatic [] Nominal Operating Pressure [ I Not Applicable []

I Test Pressure 1040 psig TestTemperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded durnnq the D3R17 10 Yr Hydro underWO 99252183-10.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: A<4ISI COORDINATOR 1'2-30 2002 r Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insranc and InspectjgCo. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on / .. 2001 and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for anyersonal .nury or property damage or a loss of any kind arising from or connected with this inspection.

Date:___________ Inspector. !AZ9frf Commissions: 1-932, NB7742NISB

/ (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Comoanv (EGC. LLC) (Name) Date: 11-05-2002 200 Exelon Way. Kennett Square. PA. 19348 (Address)

Sheet: 1 Of I

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3 AIi% 66JVAIV). fl4 DI AM')l #lBjft **
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code *ASME Section III 1965 Edition, S/66 Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE

- General Electric APED Specification 21A5743, rev.1.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Consolidated Safety Valve Consolidated S/N: BK6270 N/A Model: 3777-QA-RT- Unknown Replaced Yes at EPN: 3-0203-4A. 21-OSl10 Consolidated Safety Valve Consolidated S/N: BK6299 N/A Cat ID-30366, UTC- Unknown Replacement Yes at EPN: 3-0203-4A. 2649714
7. Description of work: Removed existing safety valve and replaced with a rebuilt/tested spare safety valve.
8. Test Conducted: Hydrostatic [X J Pneumatic [ ] Nominal Operating Pressure ] Not Applicable []

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded during the D3R17 10 Yr -Ivdro under WO 99252183-10.

Certificate of Compliance We certify that Ae statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: -L a I1l COORDINATOR 23 2002

.F/O*'r1'Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance and Inspectioqo Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described inthis report on L/--L720_.. and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any pers nalinjury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: I - 0 Inspector 7" Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Comoanv (EGC. LLCI (Name) Date: 11-05-2002 200 Exelon Way. Kennett Sauare. PA. 19348 (Address) Sheet: _1_ Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WA Ql9Afrl*1-f11 P1 AN ."4-A2-4WiNQ

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code -ASME Section III 19L5 Edition, S166 Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE

- General Electric APED Specification 21A5743, rev. 1.

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Consolidated Safety Valve Consolidated S/N: BK6312 N/A Model: 3777-QA-RT- Unknown Replaced Yes at EPN: 3-0203-4C. 21-0S110 Consolidated Safety Valve Consolidated S/N: BK6530 N/A Cat ID-30404, UTC- Unknown Replacement Yes at EPN: 3-0203-4C. 2401593
4. 4.-I. I -t t 1.-I. 1
7. Description of work: Removed existing safety valve and replaced with a rebuilt/tested spare safety valve.
8. Test Conducted: Hydrostatic [X] Pneumatic[ ] Nominal Operating Pressure[ ] Not Applicable[]

Test Pressure 1040 psig TestTemperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded durina the D3R17 10 Yr Hydro underWO 99252183-10.

Certificate of Compliance We certify that t~le statements made inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed : s IS[ COORDINATOR /_2_-, .2002 J10(* Owners Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance wd Inspectio* Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT descnrbed in this report on I "O 20Q. _and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described Inthis report. Furthermore, neither the inspector nor his employer shall be liable In any manner for a pe nal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: °/.,2. -401- Inspector. - ,,,,,,

Commissions: 11932. NB7742NISB

. . If r (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 12-18-2002 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name)

Unit 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 99032313-01 PLAN 3-02-010

3. Work Performed By: Same as Above (Name)

(Address) Repair Organization P.O. No.. Job No. etc.

Same as Above

4. Identification of System: 2300 (HPCI)
5. (a) Construction Code USAS B31.11ASME Section VIII, 19 67/65 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair. Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief Valve at EPN Consolidated- Not Recorded N/A P/N 1905NC N/A Replaced No 3-2301-53 Dresser Relief Valve at EPN Consolidated- TN04055 N/A Cat ID 46883 N/A Replacement No 3-2301-53 Dresser UTC 2649849, P/N 1905NC
7. Description of work. Replaced existing relief valve with new valve to permit testing.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ X ] Not Applicable [ ]

Test Pressure 60 psig Test Temperature Nominal *F

9. Remarks:

j Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR 12--40

/"(OWner or Owners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance q0d Inspection Co. of Hartford, Connecticut having inspected the REPAIRIREPLACEMENT described in this report on - V ,20AO._ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or imp*led, concerning the repair or replacement described inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any per nal injj ry or property damage or a loss of any kind arising from or connected with this Inspection.

Date: 1-2. Inspector .* - £ Commissions: lL932, NB7742NISB ar (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 1-16-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address)

Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station %1.VO INc 6500 North Dresden Road, Morris IL, 60450 (Address) Unit: 3 WOqg 215A*l-O1 PLAN :*.n*-OIs
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 3000 (Main Steam)
5. (a) Construction Code USAS B31.1 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Gate Valve, 2" at Anchor Darling N/A N/A 3-0220-01 Unknown Replaced No EPN 3-0220-1 Gate Valve, 2" at Crane D0880 N/A Cat ID 1235369, Unknown Replacement No EPN 3-0220-1 UTC 2652356 Pipe, 2" Schedule 80 Unknown N/A N/A N/A N/A Replaced No Pipe, 2" Schedule 80 Unknown Heat N/A Cat ID24507, N/A Replacement No A42313 UTC 2651581 Pipe Coupling, 2" Unknown N/A N/A N/A N/A Replaced No Pipe Coupling, 2" Unknown Heat N/A Cat ID 7351, N/A Replacement No 9182 UTC 2650812
7. Description of work: Replaced valve 3-0220-1 and associated piping.
8. Test Conducted: Hydrostatic [ Pneumatic [I Nominal Operating Pressure [X ] Not Applicable [

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: VT-2 performed during Class 1 leakage test under WO 99252183-10.

Certificate of Compliance We certify that*Sined the/'statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

__,,4____

Signed 4 L ISI COORDINATOR 14*

Designee) tle) (Date) SOwners Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler InsurajTcejrl Inspectioq Co. of Hartford, Connecticut having inspected the REPAIRIREPLACEMENT described in this report onr Z-. / .20,a and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described this report Furthermore, 'i neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: /*/ 3 Inspector. Commissions: 1L932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 1-16-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)
3. Work Performed By: Same as Above (Name) g "'-f1 009o1K SIA Pl AM ?."..n2.nIR PLAN 3-02-016 Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 3000 (Main Steam)
5. (a) Construction Code USAS B31.1 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for RepairiReplacement 1989 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Gate Valve, 2" at Anchor Darling N/A N/A 3-0220-02 Unknown Replaced No EPN 3-0220-2 Gate Valve, 2' at Crane D0888 N/A Cat ID 1235367, Unknown Replacement No EPN 3-0220-2 UTC 2652445 Pipe, 2" Schedule 80 Unknown N/A N/A NIA N/A Replaced No Pipe, 2" Schedule 80 Unknown Heat N/A Cat ID24507, N/A Replacement No A42313 UTC 2651581 Pipe Coupling, 2" Unknown N/A N/A N/A N/A Replaced No Pipe Coupling, 2" Unknown Heat N/A Cat ID 7351, N/A Replacement No 9182 UTC 2621353
7. Description of work: Replaced valve 3-0220-2 and associated piping.
8. Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [X ] Not Applicable [ ]

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: VT-2 performed during Class I leakage test under WO 99252183-10.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: ISI COORDINATOR /Dei ATe or Ow (Title) (Date)

Certificateof Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurancepnd Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT descnrbed Inthis report on /- A 20._ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: A/it"-5 Inspector. -Commissions: IL932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS

. As Required by the Provisions of ASME Code Section XI (Name) Date: 1-16-2003

1. Owner. Exelon Generation Company (EGC, LLC) 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of I

>2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 00419673-01 PLAN 3-02-018

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI) 1967 Edition, NO Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1 Code Cases N-416-1 (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda,
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Pipe Line 3-1510-8"-D weld Unknown N/A N/A N/A N/A Repair No Iimmediately downstream of pump 3-1501-44B.

Branch Connection Unknown N/A N/A Cat ID 7553, Unknown Replacement No (outlet fitting) 12-8" Run, UTC 2001879 1IN Outlet Pipe, 1W", Schedule 80 Unknown N/A N/A Cat ID 4625, Unknown Replacement No UTC 2063455 Pipe Cap, 1WIN, 3000 PSI Unknown N/A N/A Cat ID 554925, Unknown Replacement No UTC 2637340

________________ I ____________ 4 _________ I ____ L ____________

7. Description of work: Repair of through wall leak on 8" elbow by welding branch connection, pipe piece, and pipe cap to existing elbow.
8. Test Conducted: Hydrostatic[] Pneumatic[] Nominal Operating Pressure! X] Not Applicablel[

Test Pressure 229 psig Test Temperature Nominal *F

9. Remarks: Acceptable V'r-2 examination after repairs.

Certificate of Compliance We certify that the statements made inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed ISI COORDINATOR ______ ,____

'> (O r ners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurante anrensp

  • Co. of Hartford, Connecticut having inspected the REPAIRIREPLACEMENT described in this report on r A , 20_-' and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any ersonal injury or prpertj damage or a loss of any kind arising from or connected with this inspection.

Date: Inspector Commissions: IL932. NB7742NISB ofUl - rfll 0 M*fI,,l4O r  %~l WI FIWVID IlCllllll

ýl/liVi

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPILACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) v*u*anuu*/ Date: 01-08-2003 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: 1 Of I

2. Plant Dresden Nuclear Power Station (Name)

Unit: 3 6500 North Dresden Road. Morris IL., 60450 (Address)

WO 410851-01 PLAN 3-02-020

3. Work Performed By: Same as Above (Name)

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500CW
5. (a) Construction Code USAS B31 .1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3' Piston Check Valve Kerotest Unknown N/A Unknown Unknown Replaced No installed at EPN 3-1599 131B 3" Piston Check Valve Kerotest Unknown N/A Cat ID-9120; UTC- Unknown Replacement No installed at EPN 3-1599- 2647538, Model:

131B Figure 12 300031

_______ I ______ I ____ II .1 1 1 I I I I -t t I a ai -

Description of work: Replaced Check Valve 3-1599-131 B.

8. Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [x] Not Applicable Test Pressure 189 psig Test Temperature ambient OF
9. Remarks: VT-2 performed and no Indication found.

Certificate of Compliance We certify that the statements made In this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

SIgned,: DZeie ISI COORDINATOR (Da S(OwnetcF1l~wriers Designee) (Tile) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insuran an spectiol Co. of Hartford, Connecticut having Inspected the REPAIRIREPLACEMENT described Inthis report on /!-.. 20_Z.and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date:

  • b* *

()-

dl-Insnedor If" - S.. -

7 Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Companv (EGC. LLC) (Name) Date: .01-02-2003 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: _1_ Of 2.

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) WO 416257-436 fPLAN 3-02-0231 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 1500 (CCSVVf
5. (a) Construction Code USAS B31.1.0, 19§7 Edition, No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19_9 Edition, No Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Check Valve at EPN 3- Techno Corp. Unknown N/A N/A Unknown Replaced No 1501-IC Check Valve at EPN 3- Techno Corp. 13972-3B N/A Cat ID: 1234437; Unknown Replacement No 1501-IC UTC- 0002639438; Model- 5053 10" Pipe Unknown Unknown N/A N/A Unknown Replaced No 10" Pipe Unknown Heat Code: N/A Cat ID: 24658; UTC Unknown Replacement No B68587 -2639014 10- Flange Unknown Unknown N/A N/A Unknown Replaced No 10- Flange Unknown Heat Code: N/A Cat ID: 24466; UTC Unknown Replacement No GLMO - 2639073 I I
7. Description of work:: Replaced valve and pipinq on CCSW pump discharge.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ ] Nominal Operating Pressure [X] Not Applicable []

Test Pressure 187 psig Test Temperature ambient OF

9. Remarks: VT-2 performed after installation of valve and Dioina with no reoortable Indications.

Certificate of Compliance We certify that the statements made Inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: 1 ,4LA ISI COORDINATOR J . . 2003 orOwners Designee) SC-(Owner (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State o5 Province of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described In this report on /-..L.20... _

and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: rI-L .- . Inspector: Robert T. Rainev Commissions: 11932. NB7742NISB

/ -(State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Comoanv (EGC. LLC) (Name) Date: 01-02-2003 200 Exelon Way. Kennett Sauare. PA. 19348 (Address)

Sheet: 2. Of..2

2. Plant: Dresden Nuclear Power Station (Name)

Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address)

(Name) WO 416257-06 (PLAN 3-02-023)

3. Work Performed By: Same as Above Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 1500 (CCSW)
5. (a) Construction Code USASB31.1.0, 1967 Edition, No Addenda, CodeCases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, No Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year epair, Code Name of Component Manufacturer Serial No. Brd ID Built ,laced or Stamped No Yes/No 10"x8" Reducer Unknown Unknown N/A N/A Unknown No 10"x8 Reducer Unknown Heat Code: N/A Cat ID: 30930; UTC Unknown acoment No 645UNA-1 - 0002639029 8" Short Radius Elbow Unknown Unknown N/A N/A Unknown 6d No 8" Short Radius Elbow Unknown Heat Code: N/A Cat ID: 1234257; Unknown ement No J337A-9 UTC - 2639091 Lýnent 8" Flange Unknown Unknown N/A N/A Unknown No 8" Flange Unknown Heat Code: N/A Cat ID : 25090; UTC Unknown No GLMO - 2639068 ýment 2" Pipe Unknown Unknown N/A N/A Unknown No 2" Pipe Unknown Heat Code: N/A Cat ID: 24507; UTC Unknown No 773164 -2632630 Unknown ýd No 2" Outlet Fitting Unknown Unknown N/A N/A Cat ID : 7554; UTC - Unknown 'ement No 2" Outlet Fitting Unknown Heat Code: N/A QRS 2001880 S a a

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC. LLC) (Name) Date: 01-02-2003 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: I Of 2

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL. 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) WO 416257-05 (PLAN 3-02-024)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: I Soo CCSW)
5. (a) Construction Code USAS B31.1.0, 19 67 Edition, No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, No Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year pair, Code Component Manufacturer Serial No. Brd ID Built Iced or Stamped No cement Yes/No Check Valve at EPN 3- Techno Corp. Unknown N/A N/A Unknown i d No 1501-ID Check Valve at EPN 3- Techno Corp. 13972-3A N/A Cat ID: 1234437; Unknown 1 ;ent 1No 1501-1D UTC - 0002639151; Model - 5053 10 Pipe Unknown Unknown N/A N/A Unknown d No 10 Pipe Unknown Heat Code: N/A Cat ID: 24658; UTC Unknown 0, ment No B68587 - 2639014 10" Flange Unknown Unknown N/A N/A Unknown 0 No 10" Flange Unknown Heat Code: N/A Cat ID : 24466; UTC Unknown F. inent No NUI6 -2639072
7. Description of work-: Reolaced valve and piping on CCSW Pump discharge.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [(] Not Applicable []

Test Pressure 189 psig Test Temperature ambient *F

9. Remarks: VT-2 performed after installation of valve and pining with no reportable indications.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: A A0. .,2 ISI COORDINATOR i -5 . 2003 (Title) (Date)

, 5 Jner or Owner's Designee)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Stae oP. ronce of Illinois, employed by Hartford Steam Boiler of CT having Inspected the REPAIR/REPLACEMENT described in this report on / -"/V , 200_.

and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A ,

Date: 1"1h "40) Inspector: Robert T. Rainev Commissions: IL932. NB7742NISB W , (State or Province, National Board) r 4

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Comoanv (EGC. LIC) (Name) Date: 01-02-2003 200 Exelon Way. Kennett Sauare. PA. 19348 (Address) Sheet: 2=_ Of .2=_

v

2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Adc WO 416257-05 (PLAN 3-02-024)
3. Work Performed By: Same as Above (Name: Repair Organization P.O. No., Job No. etc.

Same as Above (Addr

4. Identification of System: 1500 (CCSW1
5. (a) Construction Code USAS B31.1.0, 1967 Edition, No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, No Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 1O"x8" Reducer Unknown Unknown N/A N/A Unknown Replaced No 10"x8" Reducer Unknown Heat Code: N/A Cat ID: 30930; UTC Unknown Replacement No 645UNA-1 - 0002639029 8" Long Radius Elbow Unknown Unknown N/A N/A Unknown Replaced No 8" Long Radius Elbow Unknown Heat Code: N/A Cat ID : 36547; UTC Unknown Replacement No K80164 -2057015 8" Flange Unknown Unknown N/A N/A Unknown Replaced No 8" Flange Unknown Heat Code: N/A Cat ID : 25090; UTC Unknown Replacement No PSA2 - 2639069

____________________________________ A & - -

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 11-14-2002 200 Exelon Way. Kennett Square. PA. 19348 (Address)

Sheet: _1_ Of .. _

K 2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL. 60450 (Address) Unit: 3

3. Work Performed By: Same as Above (Name) WO ~~R*)Fnf-n1 W

PIAN ."-fl;'.J1'R PLA 3v0202 Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code Section III 1968* Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
  • General Electric APED Specification 21A9206
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Main Steam Safety Relief Target Rock 214 NIA None Unknown Replaced No Valve assembly from 3 0203-3A.

Main Steam Safety Relief Target Rock 222 N/A Cat ID-8070, UTC- Unknown Replacement No Valve assembly from 3- 2062534.

0203-3A.

7. Description of work: Replace the valve with a refurbished one.
8. Test Conducted: Hydrostatic [ X I Pneumatic [I Nominal Operating Pressure [ ] Not Applicable [X ]

Test Pressure 1040 psig TestTemperature 185 OF

9. Remarks: Satisfactory VT-2 examination was recorded during the D3R17 10 Yr Hydro under WO 99252183-10..

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: Ow.JwnLts ISI COORDINATORe) (Date)

Ilf(Ow ApOwrier's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurarocend Inspectii Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on / * ., .20+/-Z.. and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or prope a loss of any kind arising from or connected with this inspection.

Date: / Inspector: Commissions: 1L932. NB7742NISB Iv (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI XI I - I\ ASME Code ofREPAIR OR Section REPLACEMENTS Date: 12-10-2002

1. Owner. Exelon Generation Comoanv (EGC. LLC) FORM by the OWNER'S NIS-2 J FOR Provisions REPORT Required As 200 Exelon Way. Kennett Square, PA. 19348 (Address) Sheet: Ij._ Of 5.
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address)

WO 410870-05 to -11. -13 to -15. -17 to -23 PLAN 3-02-027

3. Work Performed By: General Electric (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect. III 1965 Edition, W/65 Addenda, Code Cases 1335-2. 1361. 1352 (b) Edition of Section XI used for Repair/Replacement 198.9 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Control Rod Drive (Task 05) General Electric 8227 N/A Location: 18-27 1988 Replaced Yes Control Rod Drive (Task 05) General Electric A4454 WA Cat. ID-00413, 1995 Replacement Yes UTC's-2652843 Control Rod Drive Flange Unknown Unknown N/A Location: 18-27 N/A Replaced No Cap Screws. (Task 05)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 05) UTC's-2647928

7. Description of work: Replace existing control rod drive assemblies and associated flange cap screws with new control rod drive assemblies and flange cap screws. The removed cap screws did not receive aVT-1 examination with application of Dresden Station Third Interval Relief Reauest CR-20.
8. Test Conducted: Hydroseatic [ X I Pneumatic [ ] Nominal Operating Pressure I I Not Applicable [ ]

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Satisfactor VT-2 examination was recorded during the D3R17 10 Yr Hydro under WO 99252183-10.

Certificate of Compliance We certify ththe statements made Inthis report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed A A/I- ' - ISI COORDINATOR 1.2'/2"10- 0.

______9-eror Owner's Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insu, ce and Inspectiog Co. of Hartford, Connecticut having Inspected the REPAIRJREPLACEMENT described In this report on -. 2ol.encd state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with &ection XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described inthis report. Furthermore, neither the inspector nor his employer shall be liable inany manner for any pers lnal i or damage or a loss of any kind arising from or connected with this inspection.

Date:/2"/t)* Inspector, Commissions: 1L932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 12-10-2002 200 Exelon Way. Kennett Sauare. PA. 19348 (Address)

Sheet: 2. Of 5

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL. 60450 (Address) Unit: 3
3. Work Performed By: General Electric (Name) vv4Jo 9u-uof WU -I. --J0-1,o. -11 0 -4. r"L.N ,UZ-IWI"L I Same as Above (Address) Repair Organization P.O. Nio., Job No. etc.
4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect. III 1965 Edition, W/65 Addenda, Code Cases 1335-2, 1361, 1352 (b) Edition of Section Xl used for Repair/Replacement 199 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Control Rod Drive (Task 06) General Electric 53 N/A Location: 26-51 1968 Replaced Yes Control Rod Drive (Task 06) General Electric A51 15 N/A Cat. ID-00413, 1981 Replacement Yes UTC-2652864 Control Rod Drive Flange Unknown Unknown N/A Location: 26-51 N/A Replaced No Cap Screws. (Task 06)

Control Rod Drive Flange Unknown Ht Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 06) UTC-2647930 Control Rod Drive (Task 07) General Electric A3327 N/A Location: 38-31 1993 Replaced Yes Control Rod Drive (Task 07) General Electric A5513 N/A Cat. ID-00413, 1982 Replacement Yes UTC-2652857 Control Rod Drive Flange Unknown Unknown N/A Location: 38-31 N/A Replaced No Cap Screws. (Task 07)

Control Rod Drive Flange Unknown Ht. Code- N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 07) SJH/P04 UTC-2628969 Control Rod Drive (Task 08) General Electric 710C N/A Location: 14-15 1967 Replaced Yes Control Rod Drive (Task 08) General Electric 962 N/A Cat. ID-00413, 1969 Replacement Yes UTC-2652860 Control Rod Drive Flange Unknown Unknown N/A Location:14-15 N/A Replaced No Cap Screws. (Task 08)

Control Rod Drive Flange Unknown Ht. Code-PKJ N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 08) UTC-2059461 Control Rod Drive (Task 09) General Electric 467C N/A Location: 26-11 1967 Replaced Yes Control Rod Drive (Task 09) General Electric A6672 N/A Cat. ID-00413, 1995 Replacement Yes UTC-2652862 Control Rod Drive Flange Unknown Unknown N/A Location: 26-11 N/A Replaced No Cap Screws. (Task 09)

Control Rod Drive Flange Unknown Ht. Code-C475 N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 09) UTC-2618187

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI X!

IM  %,\ ASME Code ofREPAIR OR Section REPLACEMENTS Date: 1J2-10Q2002

1. Owner. Exelon Generation Company (EGC. LLC) FORM by the OWNER'S NIS-2 F FOR Provisions REPORT 200 Exelon Way. Kennett Square. PA. 19348Required As (Address)
2. Plant: Dresden Nuclear Power Station (Name) Unit:

6500 North Dresden Road, Morris IL.. 60450 (Address)

3. Work Performed By: General Electric (Name) WO 410870-05 to -11. -13 to -15. -17 to D23 PLAN 3-02-027 Same as Above (Address) Repair Organization P.O. No. , Job No. etc.
4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect. III I 1965 Edition, W/65 Addenda, Code Cases 1335-2. 1361. 1352 (b) Edition of Section Xl used for Repair/Replacement 19889 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Control Rod Drive (Task 10) General Electric 1869 N/A Location: 38-39 1970 Replaced Yes Control Rod Drive (Task 10) General Electric A9507 N/A Cat. ID-00413, 1995 Replacement Yes UTC-2652853 Control Rod Drive Flange Unknown Unknown N/A Location: 38-39 N/A Replaced No Cap Screws. (Task 10)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat ID-42416. N/A Replacement No Cap Screws. (Task 10) UTC-2647930 Control Rod Drive (Task 11) General Electric 161 N/A Location: 38-59 1968 Replaced Yes Control Rod Drive (Task 11) General Electric A4040 N/A Cal. ID-00413, 1987 Replacement Yes UTC-2652866 Control Rod Drive Flange Unknown Unknown N/A Location: 38-59 N/A Replaced No Cap Screws. (Task 11)

Control Rod Drive Flange Unknown HL Code-E793 N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 11) UTC- 2647930 Control Rod Drive (Task 13) General Electric A3250 N/A Location: 54-19 1979 Replaced Yes Control Rod Drive (Task 13) General Electric A8525 N/A Cat. ID-00413, 1988 Replacement Yes UTC-2652850 Control Rod Drive Flange Unknown Unknown N/A Location: 54-19 N/A Replaced No Cap Screws. (Task 13)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 13) UTC-2647928 Control Rod Drive (Task 14) General Electric 791 N/A Location: 46-07 1969 Replaced Yes Control Rod Drive (Task 14) General Electric 602C N/A Cat. ID-00413, 1967 Replacement Yes UTC-2652849 Control Rod Drive Flange Unknown Unknown N/A Location: 46-07 N/A Replaced No Cap Screws. (Task 14) 1 Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 14) UTC-2647928

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 12-10D-2002 200 Exelon Way. Kennett Square. PA. 19348 (Address)

Sheet: _4__ Of.5

2. Plant: Dresden Nuclear Power Station (Name) 3 Unit:

6500 North Dresden Road. Morris IL.. 60450 (Adc

3. Work Performed By: General Electric (Name WO 410870-05 to -11. -13 to -15. -17 to -23 PLAN 3-02-027 Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect III 1965 Edition, W/65 Addenda, Code Cases 1335-2. 1361. 1352 (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Control Rod Drive (Task 15) General Electric A8038 N/A Location: 54-47 1987 Replaced Yes Control Rod Drive (Task 15) General Electric 613C N/A Cat. ID-00413, 1967 Replacement Yes UTC-2652844 Control Rod Drive Flange Unknown Unknown N/A Location: 54-47 N/A Replaced No Cap Screws. (Task 15)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 15) UTC-2647929 Control Rod Drive (Task 17) General Electric 8756 N/A Location: 30-15 1979 Replaced Yes Control Rod Drive (Task 17) General Electric A3971 N/A Cat ID-00413, 1995 Replacement Yes UTC-2652859 Control Rod Drive Flange Unknown Unknown N/A Location: 30-15 N/A Replaced No Cap Screws. (Task 17)

Control Rod Drive Flange Unknown HL Code- N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 17) SJH/P04 UTC-2628969 Control Rod Drive (Task 18) General Electric 295 N/A Location: 34-11 1969 Replaced Yes Control Rod Drive (Task 18) General Electric 1080 NIA Cat ID-00413, 1969 Replacement Yes UTC-2652858 Control Rod Drive Flange Unknown Unknown N/A Location: 34-11 N/A Replaced No Cap Screws. (Task 18)

Control Rod Drive Flange Unknown Ht Code-C475 N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 18) UTC-2618187 Control Rod Drive (Task 19) General Electric 6008 N/A Location: 50-51 1975 Replaced Yes Control Rod Drive (Task 19) General Electric A3700 N/A Cat ID-00413, 1987 Replacement Yes UTC-2652863 Control Rod Drive Flange Unknown Unknown N/A Location: 50-51 N/A Replaced No Cap Screws. (Task 19) 1 Control Rod Drive Flange Unknown HL Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 19) UTC-2647928

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: . 2-10-2002..

200 Exelon Way. Kennett Sauare. PA. 19348 (Address) Sheet: 5j. Of 5.

K 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address)

3. Work Performed By: General Electric (Name) WO 410870-05 to -11. -13 to -15. -17 te -23 PLAN 3-02-027 (Address) Repair Organization P.O. NC o., Job No. etc.

Same as Above

4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect. III , 1965 Edition, W/65 Addenda, Code Cases 1335-2.1361. 1352 (b) Edition of Section Xl used for Repair/Replacement 19_89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Control Rod Drive (Task 20) General Electric 8574 N/A Location: 50-31 1984 Replaced Yes Control Rod Drive (Task 20) General Electric -A4037* N/A Cat. ID-00413, 1987 Replacement Yes UTC-2652847 Control Rod Drive Flange Unknown Unknown N/A Location: 50-31 N/A Replaced No Cap Screws. (Task 20)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat ID-42416, N/A Replacement No Cap Screws. (Task 20) UTC-2647929 Control Rod Drive (Task 21) General Electric 19 N/A Location: 4r-27 1968 Replaced Yes Control Rod Drive (Task 21) General Electric A6542 N/A Cat. ID-00413, 1987 Replacement Yes UTC-2652852 Control Rod Drive Flange Unknown Unknown N/A Location: 46-27 N/A Replaced No Cap Screws. (Task 21)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 21) UTC-2647929 Control Rod Drive (Task 22) General Electric 1048 N/A Location: 54-31 1969 Replaced Yes Control Rod Drive (Task 22) General Electric 1052 N/A Cat. ID-00413, 1969 Replacement Yes UTC-2652845 Control Rod Drive Flange Unknown Unknown N/A Location: 54-31 N/A Replaced No Cap Screws. (Task 22)

Control Rod Drive Flange Unknown Ht. Code-E793 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 22) UTC- 2647945 Control Rod Drive (Task 23) General Electric A8044 N/A Location: 50-39 1987 Replaced Yes Control Rod Drive (Task 23) General Electric A5444 N/A Cat. ID-00413, 1981 Replacement Yes UTC-2652865 Control Rod Drive Flange Unknown Unknown N/A Location: 50-39 N/A Replaced No Cap Screws. (Task 23)

Control Rod Drive Flange Unknown Ht. Code-C475 N/A Cat. ID-42416, N/A Replacement No Cap Screws. (Task 23) UTC-2618187

_ _ _ _ _I _ _ _ I _ _ _ 1 _ _ I I_ _ _ _

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC. LLC) (Name) Date: 12-30-2002 200 Exelon Way, Kennett Souare. PA. 19348 (Address) Sheet: _I_ Of _2
2. Plant: Dresden Nuclear Power Station (Name) Unit: .3.a 6500 North Dresden Road. Morris IL.. 60450 (Address) tAII% qAA4 4fl *14 0I AM -2 n.5 MI VV'J g= I I PU I r'S,* ,
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 2500 (ACAD)
5. (a) Construction Code ASME Section III 1974 Edition, S76.66 Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1998 Edition, NO Addenda, Code Cases NONE
  • in conjunction with Relief Request MCR-02 SI~l

.Imuflu. *fi*-+. *f 1 (*'.',fvrn{*n**.-- ID=n*iraeI nr *-*-

IP.,nIJw4 nn -- R*_nla~ment ..-.- Comnonents

.L:..-___________________-_________-

Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Piping and components on Various Unknown N/A N/A N/A Replaced No line 3-2505B-1"-LA (Penetration X-125)**

Cap on line 2-2505B-1"-LA Unknown Heat Code: N/A Cat ID-38871, UTC - N/A Replacement No (Penetration x-125) 9212 2648399 Piping and components on Various Unknown N/A N/A N/A Replaced No line 3-2505A-1"-LA (Penetration X-125)"_

Cap on line 2-2505A-1"-LA Unknown Heat Code: N/A Cat ID-38871, UTC - N/A Replacement No (Penetration x-125) 9212 2648399 Piping and components on Various Unknown N/A N/A N/A Replaced No line 3-2502B-l"-LA (Penetration X-127, A)"*

Cap on line 2-2502B-1'-LA Unknown Heat Code: N/A Cat ID-38871, UTC N/A Replacement No (Penetration x-127, A) 9212 2648399

______________ A___________ .1. .. - _____ - __________ _____

4

... - A .4.,,. nA ,.nn.nnnafl. ha.a hoon romance a, mhonr4nnorl

7. Description of work: "Piping cut and capped at or near iiiwiiiriiii near containment IJUIIUUdLIUII PlenetrlionIU and VAILIU exig no~lllt wI[mII OI opii a cl)lp/lIL -

I(LV-

.~lqr*

QI v ;I¢ in place.

8. Test Conducted: Hydrostatic [IPneumatic [ X Nominal Operating Pressure [ ) Not Applicable [ ]

Test Pressure A8L psig Test Temperature Ambient OF

9. Remarks: Satisfactory LLRT performed underWO 99213871-01 (X-125), 344119-19 (X-127). 344119-25 (X-139B). 34419-26 (X-316B). and 344119 27(X-316A). IWE Visual Exams Performed in conounction with the LLRTs and no indications found.

Certificate of Compliance We certify that t statementmade in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: A*! ISI COORDINATOR 1-_3 2003 cvnerW-O wners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance !pd Inspection Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on I - go ,20V_3 and state to the best of my knowledge and belief, this repair or replacement has been-constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, conceming the repair or replacement described In this report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perwnal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Insoedor  ;:22 A, r J Commissions: 1L932, NB7742NISB Sdf* 00 Date:./-P" (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 12-30-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: ..2__ Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address) Dl AN ."-fl*-n*R
3. Work Performed By: Same as Above (Name]

Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 2500 (ACAD)
5. (a) Construction Code ASME Section III 1974 Edition, S76 Addenda, Code Cases NONE 19 98" Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement
  • inconjunction with Relief Request MCR-02
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Piping and components on Various Unknown WA N/A N/A Replaced No line 3-2502A-1"-LA (Penetration X-139B)r_

Cap on line 2-2502A-1"-LA Unknown Heat Code: N/A Cat ID-38871, UTC - N/A Replacement No (Penetration x-139B) 9212 2648399 Piping and components on Various Unknown N/A N/A N/A Replaced No line 3-2503B-13-LA (Penetration X-316B, A)"*

Cap on line 2-2503B-13-LA Unknown Heat Code: N/A Cat ID-38871, UTC - N/A Replacement No (Penetration x-316B, A) 9212 2651722 Piping and components on Various Unknown N/A N/A N/A Replaced No line 3-2503A-1"-LA (Penetration X-316A, A)"_

Cap on Olne 2-2503A-1"-LA Unknown Heat Code: N/A Cat ID-38871, UTC N/A Replacement No tPenetration x-316A. A) 9212 2648399 We.netration x-316A______________ ______________L_______. __________________

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Companv (EGC. LLCI (Name) Date: 01-10-2003 200 Exelon Way. Kennett Souare. PA. 19348 (Address)

Sheet: .L. Of I

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road. Morris IL.. 60450 (Address) Unit:
3. Work Performed By: Same as Above (Name) WO 417715-01 PLAN 3-02-029 Same as Above (Address) Repair Organization P.O. No., Job No. etc.
4. Identification of System: 0200 (Main Steam)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19_89 Edition, NO Addenda, Code Cases N-62-7
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare Main Steam Isolation Crane None N/A None N/A Replaced No Valve (MSIV) Disc Assembly Spare Main Steam Isolation Crane None N/A Cat ID-1200124; N/A Replacement No Valve (MSIV) Disc UTC-2652820 Assembly Description of work: Replaced existing disc assembly with a spare that had been refurbished underWO 99216199-01 (Repair Plan 2-01-006).
8. Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [ Not Applicable [ X Test Pressure N/A psig Test Temperature N/A OF
9. Remarks: None.

Certificate of Compliance We certify that the statemfts made in this report are correct and this REPAIR/REPLACEMENT Conforms to section XI of the ASME Code.

Signed :

I 4 ý (O ertFOwneres Designee)

I4 COORDINATOR ISI (Title)

/ /1 (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance, ni Inspectiojr.Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on /.,,,/ 20 J_.and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with S{ction XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: "..-L.LLf 2 Inspector. ,4Z7,, iE!" 4A Commissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-031 WO gQ227R IR-03
3. Work Performed By, Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI)
5. (a) Construction Code ASME Section III 1965 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3B CCSW/LPCI Hx Upper Berlin Chapman 05036-3 3006 3-1503B Unknown Repair Yes Channel

+ I + .t t I + I t I t I 1 4 I + t t I

___________ 1 4 I + i t I

______________________ 1 _________________ .1. _____________ ______ ________________ - -

7. Description of work: Weld repair of pitted areas in upper channel.

Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [X ] Not Applicable Test Pressure 228 psig Test Temperature Ambient OF

9. Remarks:

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed:*a - ISI COORDINATOR /-I I --,e3 S"Cne-or Owners Designee) (Tl-e) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurnce ari Inspec! CO. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on _ , /31, 20..I and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any persona n orrury p p age or a loss of any kind arising from or connected with this inspection.

Date:! /5" Inspector. __ _ _ _ _ __ _ _ _ _ Commissions: 11932, NB7742NISB

"(Stateor Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPL.ACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Comoanv (EGC. LLC) (Name) Date: 12-30-2002 200 Exelon Way. Kennett Sauare. PA. 19348 19348 (Address) Sheet: I!. Of _1__

200 Exelon Wav Kennett Souare PA

2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Mort is IL.. 60450 (Address)
3. Work Performed By: Same as Above (Name) WO 340400-M1 PLAN 3-02-032 Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0202 (Reactor Recirculation)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases N-416-1
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Drain Valve at EPN 3- Unknown Unknown WA Unknown Unknown Replaced No 0220-63B Drain Valve at EPN 3- Conval, Inc. Shop Order: WA Cat ID-1226707, Unknown Replacement No 0220-63B 530210 UTC- 2647431 Drain Valve at EPN 3- Unknown Unknown NWA Unknown Unknown Replaced No 0220-64B Drain Valve at EPN 3- Conval, Inc. Shop Order: N/A Cat ID-1226707, Unknown Replacement No 0220-64B 530210 UTC- 2647432 Drain Une Piping (3- Unknown Unknown N/A Unknown Unknown Replaced No 0204B-2*-AM)

Drain Une Piping (3- Unknown Heat Code: N/A Cat ID-463713, Unknown Replacement No 0204B-2"-AM) 454046 UTC- 2644824 Al J _____________________________________

.1.___________________________

7. Description of work: Replaced RR pump suction drain valves and associated Pipina.
8. Test Conducted: Hydrostatic [X] Pneumatic [ ] Nominal Operating Pressure [ ] Not Applicable[

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: Tested during Vessel hydro under WO 99252183-10.

Certificate of Compliance We certify that the statemen', made Inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: ISI COORDINATOR /"

£w r's Designee) (rTle) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance/ Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on L./' . 20.01 and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or inplied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or properlt damage or a loss of any kind arising from or connected with this inspection.

Date: Inspector1 ia/rd"7' aCommissions: IL932. NB7742NISB

  1. (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 01-14-2003 200 Exelon Way. Kennett SQuare. PA. 19348 (Address) Sheet: I1 Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: :3 6500 North Dresden Road, Morris IL.. 60450 (Address)

(Name) WO 349897-01 (PLAN 3-02-039g

3. Work Performed By: Same as Above Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0220 (Feedwater)
5. (a) Construction Code USAS B31.1.0, 1967 Edition, No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE u.de IUIIytltJ ucab, '! -. t Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Disc/Seat Ring Assembly Crane N/A N/A None Unknown Replaced No for valve 3-0220-58A Disc/Seat Ring Assembly Crane C7648 N/A Cat ID: 1033169; Unknown Replacement No for valve 3-0220-58A UTC - 0002651618 1 1 1 .11 1 1 I I______

1 i - i I t

___________ 4 1 4 1 + I t 4 I t-l I T

____________ __________ 1 _______ .1 ___ 1 _________ _____ ________ _____

Description of work:_: Replaced Disc and Seat Rinq Assembly with refurbished spare from stock.

8. Test Conducted: Hydrostatic [ ] Pneumatic [ Nominal Operating Pressure [ ] Not Applicable [ X Test Pressure _ psig Test Temperature OF A

T

  • i m* A S.... t---- n----i .... £--* .. *L ----  :--ii--*iA*
9. Remarks: V I-2 oerrormeo ounnq systrm leaage rew wr"nu indication.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

1JI-L 4 Signd: atnISI COORDINATOR /- /1 _, 2003 Own,,::15 efdr(Ower's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or.p.wvince of Illinois, employed by Hartford Steam Boiler of CT having Inspected the REPAIR/REPLACEMENT described in this report on " 20" and state to the best of my knowledge and belief, this repair or replacement has been constructed inaccordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: L I3*!.inspector: Robert T. Rainey Commissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC, LLC) (Name) Date: 12-18-2002 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 2/3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-041 WA flndR~qgl-n1
3. Work Performed By: Same as Above (Name)

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 3900 (Diesel Generator Cooling Water)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 2/3-3903 Diesel Generator Crane Co. Chem- Unknown N/A 2/3-3903 N/A Replaced No Cooling Water Pump Pump Div.

2/3-3903 Diesel Generator Crane Co. Chem- 19988-3D N/A Cat ID 15137 N/A Replacement No Cooling Water Pump Pump Div. UTC 2055989

7. Description of work: Replaced existing pump with rebuilt spare.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [X] Not Applicable [ ]

Test Pressure 83 psig Test Temperature Nominal OF

9. Remarks:

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Signel: /* gISI COORDINATOR /1%/1.3 S, ý(Owner-orOwners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insura1ce ;j Inspoctip Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on L&Lp . 2OtL20nfd state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with SectionXI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or inplied, concerning the repair or replacement described In this report. Furthermore, neither the inspector nor his employer shall be liable inany manner for any pe,onal injury or pwperty damage or a loss of any kind arising from or connected with this Inspection.

Date: Mi -/'f..6*n Inspector _________________ Commissions: 11-932. NB7742NISB

  • F (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address)

Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 3 vinA%0 21R721R-M DI Aid 'fl¶M.nA7
3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 1500 (LPCI)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3" Square Tube Steel on Unknown Heat Code N/A Cat ID786089 Unknown Replacement No Support M-3409-06 AIV1652 UTC 2633805
7. Description of work: Modified support by adding tube steel member.

Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [ Not Applicable [ X Test Pressure - psig Test Temperature _ OF

9. Remarks: VT-3 performed of completed instaflation.

Certificateof Compliance We certify that the statements made inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: 4 nr w ' ISI COORDINATOR (Date) 46-(Dwner~x-C~ners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance pecti* Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on _ "C ,20 at and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xrof the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any peryna In' or tropry damage or a loss of any kind arising from or connected with this Inspection.

Date: Inspector_ Z Z = Commissions: 11.932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of I
2. Plant Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

PLAN 3,.02.,0.5 WO 31R228-05

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 8.9 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No W Plate on Support Unknown Heat Code N/A Cat ID 515024 Unknown Replacement No M-3409-19 JC0636 UTC 2632689
7. Description of work: Modified support by adding structural member.
8. Test Conducted: Hydrostatic[] Pneumatic [ ] Nominal Operating Pressure[ ] Not Applicable [X]

Test Pressure - psig Test Temperature FF_

9. Remarks: VT-3 Performed of completed installation.

Certificate of Compliance We certify thatthe statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed AISI COORDINATOR -- (

Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insuanc d Inspt Co. of Hartford, Connecticut having inspected the REPAIRtREPLACEMENT described inthis report on , 20Q_ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any pers9 al inmag pa or loss of any kind arising from or connected with this Inspection.

noe: TI' q- -!' In Ctoqnprir Commissions: IL932. NB7742NISB jr -- . =;* ..... 7 S (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name)

Unit: 3 6500 North Dresden Road, Morris IL, 60450 (Address)

WO 318228-07 PLAN 3-02-051

3. Work Performed By: Same as Above (Name)

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 4 x 8" Square Tube Steel Unknown Heat Code N/A Cat ID 685640 Unknown Replacement No on Support M-3408-12 AIU1434 UTC 2632732 4C x 4" Angle Iron on Unknown Heat Code N/A Cat ID 514060 Unknown Replacement No Support M-3408-12 JB9853 UTC 2648428
7. Description of work: Modified support by adding structural members.
8. Test Conducted: Hydrostatic [ ] Pneumatic I] Nominal Operating Pressure [ ] Not Applicable [XX Test Pressure - psig Test Temperature _ OF
9. Remarks: VT-3 performed of completed Installation.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: nISI COORDINATOR

'2 /-0 D.

rCwPOwnee eine (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurancesqd lnspe*og Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described Inthis report on _/, / .- 20f.E and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described Inthis reporL Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: /' - , Inspector. Commissions: IL932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 1-10-2003

1. Owner. Exelon Generation Company (EGC. LLC) 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-052
3. Work Performed By: Same as Above (Name) WO gg223565..01 WO 99223565-01 Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1300 (Isolation Condenser)
5. (a) Construction Code USAS B31.1.0 19667 Edition, NO Addenda, Code Cases NONE 198_9 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No ISCO Valve 3-1301-3 Crane N/A N/A None Unknown Repair No 3-1301-3 Valve Disc Crane Unknown N/A None Unknown Replaced No 3-1301-3 Valve Disc Crane P/N CA01628- N/A Cat ID 44461, Unknown Replacement No 4710 UTC 2653785

_____________________ 1 ________________ 1. .1-1 1 1 I.

_____________________ 4. 4. 4-4 t I t

__ _________ .L ____ ________ ____

7. Description of work: New valve seats installed by welding and replaced valve disc.

Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [ ] X Not Applicable [X Test Pressure _ psig Test Temperature__ *F

9. Remarks:

Certificate of Compliance We certify that the statements ma inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: ISI COORDINATOR /--If (Y./(Owner Laze1s Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boier Insu tn a d Inspecdio ,Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on 2 and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, ornceming the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perI.raI injury.or propet damage or a loss of any kind arising from or connected with this inspection.

Date: lnspector: ,7,,7__, _ _ Commissions: IL932, NB7742NISB F -(State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address)

Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 3
3. Work Performed By: Same as Above (Name) WO 420336-07 (PLAN 3-02-053)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section III/USAS B31.1, 19 65/67 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1998 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief Valve EPN 3-1105-A Crosby Unknown N/A N/A Unknown Replaced No Relief Valve EPN 3-1105-A Crosby 95721 N/A Cat ID: 1220309; Unknown Replacement No 0002 UTC - 0002652991; Model - JMWK-B
7. Description of work:: Replaced valve in accordance with EC 333923.
8. Test Conducted: Hydrostatic [] Pneumatic [] Nominal Operating Pressure [X] Not Applicable [X]

Test Pressure 1480 psig Test Temperature ambient OF

9. Remarks: VT-2 performed after installation of valve with no reportable indications.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

SIgned: t ISI COORDINATOR /- 2003 I 'tner or Owners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the %ate or Province of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described inthis report on F-V 20_0 .

and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this reporL Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: / A __ Inspector Robert T. Rainey Commissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC, LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 420336-09 (PLAN 3-02-054)

3. Work Performed By: Same as Above (Name)

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section V1II1USAS B31.1,1 19 65167 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief Valve EPN 3-1105-B Crosby Unknown N/A N/A Unknown Replaced No Relief Valve EPN 3-1105-B Crosby 95721 N/A Cat ID: 1220309; Unknown Replacement No 0001 UTC - 0002652990; Model - JMWK-B 4 4 I I V V 4 I 1 I t T 4 I I-I . t 4 4 1t V V V I I I I 4 4 4 I I I I t I I .1 .1. 4
7. Description of work:-: Replaced valve in accordance with EC 333923.
8. Test Conducted: Hydrostatic [ I Pneumatic [ ] Nominal Operating Pressure [XI Not Applicable [X]

Test Pressure 1470 psig Test Temperature ambient OF

9. Remarks: VT-2 performed after installation of valve with no reportable indications.

Certificate of Compliance We certify that the statementsade in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed: Z 4-* ,. ISI COORDINATOR Z (&_ ,2003 (Title) (Date) f or Owner's Designee)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Stale or rovince of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described in this report on / Y7 20Z-,

and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection Date: Inspector Robert T. F*/4 i41- Commissions: 1L932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC, LIC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 420336-"1 (PLAN 3-02-055)

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIII/USAS B31.1, 19 65/67 Edition, W66/No Addenda, Code Cases NONE (b) .Edition of Section XI used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Valve Cover Union Pump None N/A N/A Unknown Replaced No Valve Cover Union Pump None N/A Cat ID: 1231649; Unknown Replacement No UTC - 2638873 Valve Cover Studs Union Pump None N/A N/A Unknown Replaced No Valve Cover Studs Union Pump Heat Code: N/A Cat ID: 1231652; Unknown Replacement No E607 UTC - 2641464 Valve Cover Nuts Union Pump None N/A N/A Unknown Replaced No Valve Cover Nuts Union Pump None N/A Cat ID: 1231659; Unknown Replacement No UTC - 2638877
7. Description of work: Rebuilt spare SBLC pump (S/N 851073AN501) in accordance with EC 333923.

K 8. Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [ ] Not Applicable [X]

Test Pressure _ psig Test Temperature OF

9. Remarks:

Certificate of Compliance We certify that the sta me ade In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR / - 2003 r or Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Ste a Province of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described inthis report on L/ Y 2- f_.

and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, conceming the repair or replacement described Inthis report. Furthermore, neither the inspector nor his employer shall be liable in a nner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection. ,

Date: /2f " Inspector. Robert T. Rainey Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC, LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) 2_Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

(Name) WO 420336-01 (PLAN 3-02-055)

3. Work Performed By: Same as Above ., Job No. etc.

(Address) Repair Organization P.O. Nc Same as Above

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section ViII/USAS B31.1, 1965/67 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Flange Plate Studs Union Pump None NWA N/A Unknown Replaced No Flange Plate Studs Union Pump Heat Code: N/A Cat ID: 1231643; Unknown Replacement No E608 UTC - 2641044 Flange Plate Nuts Union Pump None N/A N/A Unknown Replaced No Flange Plate Nuts Union Pump None N/A Cat ID: 1231644; Unknown Replacement No UTC - 2638872 Stuffing Box Flange Union Pump None N/A N/A Unknown Replaced No Stuffing Box Flange Union Pump None N/A UTCID:

Cat 1232805; Unknown Replacement No

- 2638869

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet I Of 2
2. Plant Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address)

Ir0 I AN 3-02-056) 12&il't 1%'l~llll'l~

3. Work Performed By: Same as Above (Name) VVJ -*,*LV, o.,Job No. etc.

Same as Above (Address) Repair Organization P.O. N(

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIIWIUSAS B31.1, 19 656.7 Edition, VW66/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Standby Liquid Control Union Pump Unknown N/A 3-1102B Unknown Replaced No Pump Standby Liquid Control Union Pump 851073AN501 N/A Cat ID: 1384133; Unknown Replacement No Pump UTC - 2652564 Suction Flange Studs Unknown None N/A N/A Unknown Replaced No Suction Flange Studs Unknown Heat Code: N/A Cat ID: 16605; UTC Unknown Replacement No 77091 -2625053 Suction Flange Nuts Unknown None N/A N/A Unknown Replaced No Suction Flange Nuts Unknown Heat Code: N/A Cat ID : 37029; UTC Unknown Replacement No SPJ - 2063563
7. Description of work: Replaced rebuilt spare pump in accordance with EC 333923.
8. Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [I] Not Applicable []

Test Pressure 1330 psig Test Temperature ambient OF

9. Remarks: VT-2 performed after reinstallation of rebuilt pump with no reportable indications.

Certificate of Compliance We certify that the stateme.p made inthis report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: .** / ISI COORDINATOR / WI ,'2003 or Owners Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the SIate .f Province of flhinoisý employed by Hartford Steam Boiler of CT having Inspected the REPAIR/REPLACEMENT described In this report on / -*Y 20,0 and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be lable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. A - A DOWe Date:

Inntnr Rnlwt T Rninev InsnctorRobet T aine J4fd' lAW 1 Commissions: 1L932, NB7742NISB ,

(State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) 2 Of 2 K 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

(Name) WO 42033602 (PL 3-02-M56)

AN

3. Work Performed By- Same as Above Repair Organization P.O. No o.,Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIII/USAS B31.1, 1965/67 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Discharge Flange Studs Unknown None N/A N/A Unknown Replaced No Discharge Flange Studs Unknown Heat Code: N/A Cat ID: 37098; UTC Unknown Replacement No A475 -2639497 Discharge Flange Nuts Unknown None N/A N/A Unknown Replaced No Discharge Flange Nuts Unknown Heat Code: N/A Cat ID : 37034; UTC Unknown Replacement No HDF, LZV -2059784 and 2054013

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC, LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL, 60450 (Address)

WO 420336-04 IPLAN 3-02-0571

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIIAUSAS B31.1 1 19 65/67 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Valve Cover Union Pump None N/A N/A Unknown Replaced No Valve Cover Union Pump None N/A Cat ID: 1231649; Unknown Replacement No UTC - 2638873 Valve Cover Studs Union Pump None N/A N/A Unknown Replaced No Valve Cover Studs Union Pump Heat Code: N/A Cat ID: 1231652; Unknown Replacement No E607 UTC - 2641464 Valve Cover Nuts Union Pump None N/A N/A Unknown Replaced No Valve Cover Nuts Union Pump None N/A Cat ID: 1231659; Unknown Replacement No UTC - 2638877
7. Description of work: Rebuilt spare SBLC pump (S/N 271643) in accordance with EC 333923.

K.> 8. Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [ ] Not Applicable [X]

Test Pressure - psig Test Temperature _ F

9. Remarks:

Certificateof Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR L" .... ,2003 S//,,4f%ý er or Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described in this report on --. X 20gy and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xlof the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions: I1932, NB7742NISB Date: Date: Robert T. Rainey Inspector IL QR 1___0-____

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENT'S As Required by the Provisions of ASME Code Section XI Section XI Date: 01-04-2003

1. Owner: Exelon Generation Company (EGC. LLC) (Name) ASME Code ofREPAIR OR REPLACEMENTS 200 Exelon Way, Kennett Square, PA, 19348 (Address) by the REPORT FOR Provisions Sheet: 2 Of 2 FORMNIS-2 OWNER'S Required AsIName*

ý 2. Plant: Dresden Nuclear Power Station IName) (Address) Unit 3 6500 North Dresden Road, Morris IL., 60450

3. Work Performed By: Same as Above (Name) WO 420336.04 (Pt AN 3-02-057)

Same as Above (Address) Repair Organization P.O. Nio., Job No. etc.

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIII/USAS B31.1, 19 65/67 Edition, W66/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Flange Plate Studs Union Pump None N/A N/A Unknown Replaced No Flange Plate Studs Union Pump Heat Code: N/A Cat ID: 1231643; Unknown Replacement No E608 UTC - 2641044 Flange Plate Nuts Union Pump None N/A N/A Unknown Replaced No Flange Plate Nuts Union Pump None N/A Cat ID: 1231644; Unknown Replacement No UTC - 2638872 Stuffing Box Flange Union Pump None N/A N/A Unknown Replaced No Stuffing Box Flange Union Pump None N/A Cat ID: 1232805; Unknown Replacement No UTC - 2638869

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 01-04-2003 1 Owner Exelon Generation Company (EGC, LLC) 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of 1

2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL. 60450 (Address) (PLAN 3-02-058)

WO420338-05

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1100 (Stand-By Liquid Control)
5. (a) Construction Code ASME Section VIIIUSAS B31.1, 1965L67 Edition, V66/No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, No Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Union Pump Unknown N/A 3-1102B Unknown Replaced No Standby Liquid Control Pump Union Pump 271643 N/A Cat ID: 1384133; Unknown Replacement No Standby Liquid Control Pump UTC - 2651699 Suction Flange Studs Unknown None N/A N/A Unknown Replaced No Unknown Heat Code: N/A Cat ID: 16605; UTC Unknown Replacement No Suction Flange Studs 77091 - 2625053 Suction Flange Nuts Unknown None N/A N/A Unknown Replaced No Unknown Heat Code: N/A Cat ID: 37029; UTC Unknown Replacement No Suction Range Nuts SPJ -2063563
7. Description of work: Replaced rebuilt spare pump inaccordance with EC 333923.
8. Test Conducted: Hydrostatic [ Pneumatic [ Nominal Operating Pressure [X] Not Applicable [I Test Pressure 1330 psig Test Temperature ambient OF
9. Remarks: V`17-2 performed after reinstallation of rebuilt pump with no reportable indications.

[ Certificateof Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed :: 64 ISI COORDINATOR ,L -e( . ,2003 1 ,neror Owners Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Store orfrovince of Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIR/REPLACEMENT described Inthis report on . - % 20V .

and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section Xl o the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described or a loss of in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage any kind arising from or connected with this Inspection.

Date: Inspector Robert T. Rainey ' Commissions: 11932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section Xl

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 11-13-2002 200 Exelon Way, Kennett Square, PA 19348 (Address) Sheet: I Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 430853-02 PLAN 3-02-059

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0300 (Sram Discharge Volume)
5. (a) Construction Code USAS B31.1-0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Support M-1 187D-257 I'n Grinnel Fig 66 N/A N/A Unknown Replaced No Welded Beam Attachment Support M-1 187D-257 ITT Grinnel Fig 66 N/A Cat ID 1384644, Unknown Replacement No Welded Beam Attachment UTC 2653016.

Support M-1 187D-257 IT" Grinnel Fig 290 N/A N/A Unknown Replaced No Weldless Eye Nut Support M-1187D-257 ITT Grinnel Fig 290 N/A Cat ID 1384649, Unknown Replacement No Weldless Eye Nut UTC 2653018.

Support M-1 187D-257 Unknown N/A N/A N/A Unknown Replaced No

/" Dia Rod Support M-1 187D-257 ITT Grinnel Fig 140 NIA Cat ID 37103, UTC Unknown Replacement No 1 Y7 Dia Rod 2057071.

NIA ID 18R4R654

('tNCt 1Unknown Renlaoement No

,4 ....

UF.JJt 4 IL&44 0IX"'*C7 V UIL0J MYr tt.innl II I *llllll*l I TIJ UTCI2653022. o .wl., ...........

7. Description of work: Removed existing hanger components and replaced with heavier components.
8. Test Conducted: Hydrostatic [ ] Pneumatic I ] Nominal Operating Pressure [ I Not Applicable Test Pressure - psig Test Temperature__ OF
9. Remarks: Performed baseline VT-3 examination after Installation of support components.

Certificateof Compliance We certify that the statements made inthis report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

Se s COORDINATOR ///g 20_,

Sign-er or Owner's Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insura a I spection Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described Inthis report on _ -/ 20JL--'nd state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section I f the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Imp*-ed, conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any Pepal prty damage or a loss of any kind arising from or connected with this Inspection.

Date:)/"---inspector_ Commissions: IL932, NB7742NISB r (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 11-13-2002

1. Owner: Exelon Generation Company (EGC, LLC) 200 Exelon Way, Kennett Square, PA 19348 (Address) Sheet: 2 Of 2
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 430853-02 PLAN 3-02-059

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 0300 (Sram Discharge Volume)
5. (a) Construction Code USAS B31 .1-0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Support M-1 187D-257 ITT Grinnel Fig 136 N/A N/A Unknown Replaced No Turnbuckle Support M-1 187D-257 ITT Grinnel Fig 230 N/A Cat ID 1384656, Unknown Replacement No Tumbudde UTC 2653021.

Support M-1 187D-257 ITT Grinnel Fig 295 N/A N/A Unknown Replaced No Pipe Clamp Support M-1 187D-257 irT Grinnel Fig 295H N/A Cat ID 1384651, Unknown Replacement No Pipe Clamp UTC 2653020.

Support M-1187D-257 Unknown N/A N/A N/A Unknown Replaced No Hex Nut No Support M-1187D-257 Unknown N/A N/A Cat ID 31799, UTC Unknown Replacement No Hex Nut 2052116.

Id i- I I

I I-I

________________ t t

1

_______________ 1:

1

____________ I __________ _______ I ___ I _________ _____ I ________ _____

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: I Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-060 WO 321 RRR-27
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 3000 (Main Steam)
5. (a) Construction Code USAS B31 .1.0 19 67 Edition, NO Addenda, Code Cases NONE 19 8_9 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3/8" Bar Stock on Support Unknown Heat Code N/A Cat ID 176295 Unknown Replacement No M-564J Sht 2 L2578 UTC 2045036 Unknown Heat Code N/A Cat ID 514295 Unknown Replacement No 3/8" Bar Stock on Support M-564J Sht 2 J5317 UTC 2022574
7. Description of work: Modified support by adding structural member.

K"8.Test Conducted: Hydrostatic [ Pneumatic [ I Nominal Operating Pressure [ Not Applicable [ X Test Pressure - psig Test Temperature OF

9. Remarks: VT-3 performed of completed installation.

Certificate of Compliance Code.

We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Signed: 1w . -. , ISI COORDINATOR / '( .

,,/

  • r Owners Designee) (Title) (Date)

Certificate of Inspection of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province Illinois, employed by The Hartford Steam and Boiler Insurance pp~l Inspectionj Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described inthis report on JJL / ,. and state to the best of my knowledge and belief, this repair or replacement has been constructed Inaccordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any I O

  • orproperty damage or a loss of any kind arising from or connected with this inspection.

Date: / 4 Inspector . . Commissions: 11932i NB7742NISB 01 (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LLC) (Name) Date: 1-10-2003 200 Exelon Way. Kennett Square, PA, 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Add WOt"321 Rfi-30 PLAN 3-02-061
3. Work Performed By: Same as Above (Name: Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 3000 (Main Steam)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE 1989 Edition, NO Addenda, CodeCases NONE (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No 3" x 3" Tube Steel on Unknown Heat Code NIA Cat ID 786089 Unknown Replacement No Support M-564L Sht 2 B22222 UTC 2652318 4" x 8" Tube Steel on Unknown Heat Code N/A Cat ID 1383994 Unknown Replacement No Support M-564L Sht 2 134651 UTC 2651407 3! x 3" Angle on Support Unknown Heat Code NIA Cat ID 514069 Unknown Replacement No M-564L Sht 2 J12872 UTC 2642916 Bearing pin on Support NPS P/N 15044 N/A None Unknown Replaced No M-564L Sht 2 Bearing pin on Support NPS P/N 15044 N/A Cat ID 31012 Unknown Replacement No M-564L Sht 2 UTC 2072573
7. Description of work: Modified support by adding structural member. Pin was replaced during snubber removal for functional testing.
8. Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure[ ] Not Applicable [X]

Test Pressure - psig Test Temperature OF

9. Remarks: VT-3 performed of completed installation.

j Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed:, Id wesD ISI COORDINATORsigneeTite(D (Title) (Date)

(Ow'sDsine CT inspecuon i

H ieruncrne Certificate OTInspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance q4 Inspection Co. of Hartford, Connecticut having Inspected the REPAIRIREPLACEMENT described In this report on / I ..... 2C and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any per al injury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: -IQ*2.nspector Commissions: 1L932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner. Exelon Generation Company (EGC. LIC) (Name) Date: 12-31-2002 200 Exelon Way, Kennett Sauare. PA. 19348 (Address) Sheet: I..L Of_.1_
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address) Dl AN ."4-O9)-fIR9 Wn Ar,470A-fl1
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0203 (Main Steam)
5. (a) Construction Code USAS B31.1.0 19_Q7 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19_89 Edition, N.O Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Pilot Disc for MSIV Plug Crane-Aloyco Inc. Unknown N/A None Unknown Replaced No removed from Quad Cities EPN 2-0203-2B Pilot Disc for MSIV Plug Crane-Aloyco Inc. P/N N/A Cat ID- 7996, UTC - Unknown Replacement No removed from Quad Cities 137598001 2650423 EPN 2-0203-2B
7. Description of work: Refurbishment of MSIV plug removed from Quad Cities valve. Replaced pilot disc. Retumed to the Storeroom as a spare.
8. Test Conducted: Hydrostatic [ Pneumatic I ] Nominal Operating Pressure [ I Not Applicable [ X Test Pressure _ psig Test Temperature _ OF
9. Remarks: None.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR ' ,

I(ees Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance and Inspection Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described inthis report on t - .200 and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any pejsonal injury or property damage or a loss of any kind arising from or connected with this inspection.

Dat.- 1 -1 P,. -5 Inspector 7f 4'07*1 I

. Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 453723-01 PLAN 3-02-063

3. Work Performed By: Same as Above (Name)

(Address) Repair Organization P.O. No., Job No. etc.

Same as Above

4. Identification of System: 0200 (Main Steam)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Spare MSIV Disc Assembly Crane N/A N/A W0453723-01 Unknown Repair No Pilot Disc in Spare MSIV Crane Unknown N/A N/A Unknown Replaced No Disc Assembly Pilot Disc in Spare MSIV Crane D0233 N/A Cat ID 7996, Unknown Replacement No Disc Assembly UTC 2616372
7. Description of work: Rebuild of spare valve disc assembly. Pilot disc replaced. Assembly returned to stock.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ Nominal Operating Pressure [ ] Not Applicable [ X Test Pressure - psig Test Temperature _ OF
9. Remarks:

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: A - se ISI COORDINATOR */-1( _

V 'iT5fr esDesignee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insur ncehpn* Inspectiod Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described In this report on " ) 20ff_ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any person* injury or property amage or a loss of any kInd arising from or connected with this Inspection.

Date: Inspector-I.L.%421 Commissions: 11932, NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 1-10-2003

1. Owner. Exelon Generation Company (EGC, LLC) 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: I Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-064
3. Work Performed By: Same as Above (Name, WO 318R22,-05 Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 1500 (LPCI) 19 67 Edition, NO Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1.0 Code Cases NONE 19489 Edition, NO Addenda, (b) Edition of Section XI used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Unknown N/A N/A M-3409-19 Unknown Repair No Support M-3409-19 I i i- i 1

_______________ I ____________ I _________ I ___ I ____________ - ______ - ___________ ______

7. Description of work: Welded repair of indication found in support structural member.
3. Test Conducted: Hydrostatic [ Pneumatic[ ] Nominal Operating Pressure [ Not Applicable [X]

I.,

Test Pressure - psig Test Temperature _ OF

9. Remarks: VT-3 performed of completed Installation.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

, ISI COORDINATOR -/I tool Signed:

or Owner's Designee) (Title) (Date)

Certificate of Inspection or Province of I, the undersigned, holding a varid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State inspected the Illinois, employed by The Hartford Steam and Boiler Insujane nd Inspect'jLn Co. of Hartford, Connecticut having REPAIR/REPLACEMENT described in this report on . k-"/e nd state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Secion XI of the ASME Code. By signing this certificate neither the inspector nor his employer nor his makes any warranty, expressed or Implied, concerning the repair or replacement described in this report. Furthermore, neither the Inspector with this inspection.

employer shall be liable In any manner for any pe onal injuryor pppedy damage or a loss of any kind arising from or connected Date: /-//"45' . Inspector. 7Z T4f/ .Commissions: 11932. NB7742NISB V1 Ista'[e or P~rovince, INaUvriaII I*JoaL)

FORM NIS-2 OIWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC)  % -a l Date: 1-11-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address)

Sheet: 1 Of 1 K '2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL., 60450 (Address) Unit: 3

3. Work Performed By: Same as Above (Name)

SAQfl aO2-n7-' 1 DI AM K:L'I'#I  ::r Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 1500 (Low Pressure Coolant Injection)
5. (a) Construction Code ASME Sect.VIII, 19 65 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief valve at EPN Consolidated- Unknown N/A N/A N/A Replaced No 3-1501-13A Dresser Relief valve at EPN Consolidated- TH88699 N/A Cat ID-44534, UTC- N/A Replacement No 3-1501-13A Dresser 0002622131
7. Description of work: Replace the flanged relief valve with a new/refurbished one.

8*Test Conducted: Hydrostatic [ Pneumatic [ Nominal Operating Pressure [ X] Not Applicable []

Test Pressure 6.3 psig Test Temperature Ambient OF

9. Remarks: Satisfactory Vr-2 performed.

I Certificateof Compliance We certify that the statemep made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

I Signed:6,">'6oiefOwner's

.6 Designee) COORDINATOR (Title) f(Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insur"rnce and Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described Inthis report on I- .204,&r and state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described inthis report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any pe onal injuWy or prope damage or a loss of any kind arising from or connected with this inspection.

Date: Inspector. 7 -1a Commissions: 11-932, NB7742NISB W "(State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Company (EGC. LLC) (Name) Date: 01-04-2003 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)
3. Work Performed By: Same as Above (Name) WO 494885-15 PLAN 3-02-067 Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0200 (Reactor Recirculation)
5. (a) Construction Code USAS B31.1.0 19 67 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Reactor Recirculation N/A N/A N/A 3-020113-28" N/A Repair No Venturi Sensing Line Socket Weld.

l ___ 1=1 jI___

7. Description of work: Repaired 1" sensing line socket weld. Excavated flawed area and rewelded.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ ] Nominal Operating Pressure [ X ] Not Applicable [J Test Pressure 1040 psig Test Temperature 185 *F
9. Remarks: VT-2 Performed during Class I system leakage test under work order 99252183-10 with acceptable results.

Certificate of Compliance We certify that the stateme made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed An esign ISI COORDINATORe)(Dt

!!5p;ei~Owner's Designee) (Title) (Date)

Certificate of Inspection I,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insu*7n2,%gnd Inspectiongo. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on 20.,and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Wection Xl of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or propty damage or a loss of any kind arising from or connected with this Inspection.

Dt/ Inspetor~ Commissions: 11-932, NB7742NISB

- ' (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 01-04-2003

1. Owner. Exelon Generation Company (EGC, LLC) 200 Exelon Way, Kennett Square, PA, 19348 (Address) Sheet: 1 Of 1 K 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address) PLAN 3-02-068 W(O £g4885-o1
3. Work Performed By: Same as Above (Name) WOV 494885-01...

Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 0200 (Reactor Recirculation) 19667 Edition, NO Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1.0 Code Cases NONE 1978_9 Edition, NO Addenda, (b) Edition of Section Xl used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No N/A N/A N/A 3-0201A-28" N/A Repair No Reactor Recirculation Venturi Sensing Une Socket Weld.

K.>)7 . Description of work: Repaired 1"sensing line socket weld. Weld with flaw was completely removed and rewelded.

8. Test Conducted: Hydrostatic ] Pneumatic[ ] Nomin,. Operating Pressure [X] Not Applicable [ ]

Test Pressure 1040 psig Test Temperature 185 OF

9. Remarks: V'r-2 performed during Class I system leakage test under work order 99252183-10 with acceptable results.

Certificateof Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed : XA lje(rorig-J Owners Designee)

ISI COORDINATOR (Title)

/

(Date) sV3 Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of REPAIR/REPLACEMENT descnrbed in this report on _7 Illinois, employed by The Hartford Steam and Boiler Insur nce 9Qd Inse

.Co.of Hartford, Connecticut haying inspected the 2V .2 andstate to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ACME Code. By signing this certificate neither the Inspector nor his employer or Implied, conceming the repair or replacement described in this report. Furthermore, neither the inspector nor his makes any warranty, expressed employer shall be liable inany manner for any rsonlj [uoproperty damage or a loss of any kind arising from or connected with this inspection.

note:

  • =t*.
  • It`104-

- - "I Inspetor.

.... r- .....

7 /*

Y * ý i Commissions: 11932, NB7742NISB

/ (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section X1

1. Owner: Exelon Generation Companv (EGC. LLC) (Name) Date: 01-03-2003 200 Exelon Way, Kennett Sguare, PA. 19348 (Address) Sheet: .I._ Of 1!.

- 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL. 60450 (Address) PLAN 3-O2-O70 Wn AIRRAQ99-ft

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 8500 (N2 Inerting)
5. (a) Construction Code ASME Section VIII 1965.. Edition, NO Addenda, Code Cases NONE 19_8" Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement
  • Inconjunction with Relief Request MCR-02
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No

% In.X 1 In.Safety Relief Unknown Unknown N/A Unknown Unknown Replaced No Valve installed at EPN 3 8526

%In.X I In.Safety Relief Consolidated TJ02306 N/A Cat ID-35597; UTC - Unknown Replacement No Valve installed at EPN 3- 0002651614 8526

7. Description of work: Replaced valve with rebuilt and tested valve from stock.
8. Test Conducted: Hydrostatic[ 3 Pneumatic ] Nominal Operating Pressure ] Not Applicable IX Test Pressure NONE psig Test Temperature NONE OF
9. Remarks: VT-1 performed inconiunction with LLRT performed under WO 99216034-02 Certificate of Compliance We certify that the stateme made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed:

Sgd. e 7LL

_eWOwnefs Designee)

ISI COORDINATOR (Title)

/-K(-03 (Date)

Certificate of Inspection I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insuran and Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on . --P 2C63_ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement descn'bed In this reporL Furthermore, neither the inspector nor his employer shall be liable In any manner for any pesal injury or properylamage or a loss of any kind arising from or connected with this inspection.

Date: Inspector. Commissions:

t 1-932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC, LLC) (Name) Date: 1-10-2003 200 Exelon Way, Kennett Square, PA. 19348 (Address) Sheet: 1 Of I S2.

Plant: Dresden Nuclear Power Station (Name)

Unit: 3 6500 North Dresden Road, Morris IL., 60450 (Address)

WO 9922:3.5F-07108 PLAN 3-02-071

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1300 (Isolation Condenser)
5. (a) Construction Code USAS B31.1.0 1967 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 198_9 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No ISCO Valve 3-1301-3 Crane NIA N/A 3-1301-3 Unknown Repair No
4. I t I I
4. I I I r 1 1

_____________________ ________________ I ____________

7. Description of work: Weld repair of two indications discovered during seat ring replacement.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ Nominal Operating Pressure [ Not Applicable [X]

/ psig Test Temperature___ F Test Pressure -

9. Remarks:

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ISI COORDINATOR I-/- ,Z-00g (I ,"4gD err Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insu anc rnd InspectioD Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on '-.L1 202_. and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement described in this report Furthermore, neither the Inspector nor his employer shall be liable In any manner for any perso* Injury r prpe, damage or a loss of any kind arising from or connected with this inspection.

r%+ / A? - 0: 1n.,*,- 4^ ý- - jrjr jr - - J.

Commisslons: IL932. NB7742NISB (State or Province, National Board) 6' I

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 11-13-2002

1. Owner. Exelon Generation Comoanv (EGC. LLC) 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: 1 Of L

ýý 2. Plant: Dresden Nuclear Power Station (Name) Unit: 3..

6500 North Dresden Road, Morris IL.. 60450 (Address) DI Aim :LJn,3n71 tAInt fltV'4 OK24-'I4 MA40C.24-M

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (Low Pressure Coolant In*i
5. (a) Construction Code ASME Sect.Vll, 19 65 Edition, NO Addenda, Code Cases NONE Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief valve at EPN Consolidated- Unknown N/A N/A N/A Replaced No 3-1501-13B Dresser Relief valve at EPN Consolidated- TK52699 N/A Cat ID-44534, UTC- N/A Replacement No 3-1501-13B Dresser 0002651617, P/N:

1905FC-1-XMC368.

I1 I i - i i i 4 4 4-4 1 I 4 + t I I

_____________________ I ________________ ____________ ________________ I. ________ I _______________

7. Description of work: Replace the flanged relief valve with a new/refurbished one.

Test Conducted: Hydrostatic [] Pneumatic [ ] Nominal Operating Pressure [X ] Not Applicable [

Test Pressure 5.4 psig Test Temperature Ambient OF

9. Remarks: Satisfactory VT-2 Performed.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: / COORDINATOR I1,,SI /,9-1 -_Q 2002__

Owner's Designee) (Title) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurani*e a Inspection Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described in this report on. 20.L and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither the inspector nor his employer shall be liable In any manner for any personal inuiry or property damage or a loss of any kind arising from or connected with this Inspection.

.,a.. 1 ,,nr 1'*'* X,'tj 4* Commissions: 11932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (I Date: 01-14-2003

1. Owner. Exelon Generation Company (EGC. LLC) 200 Exelon Way. Kennett Sauare. PA. 19348 (a Sheet: 1... Of 1
2. Plant Dresden Nuclear Power Station (Name) Unit:

6500 North Dresden Road. Morris IL., 60450 (Adc Wo 496973-01 (PLAN 3-02-073)

3. Work Performed By: Same as Above (Name: Repair Organization P.O. No.. Job No. etc.

Same as Above (Addr

4. Identification of System: 0220 (Feedwate 1967 Edition, N.o Addenda, Code Cases NONE
5. (a) Construction Code USAS B31.1.0, 1989 Edition, N.o._o Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement
6. identification of Cornonent Repaired or Replaced nd Replacement Components Name of Name of" Mfs. Nat Other Year Repair, Code Serial No. Brd ID Built Replaced or Stamped Component Manufacturer No I Replacement Yes/No Chapman N/A N/A None Unknown Replaced No Disc/Seat Ring Assembly for valve 3-0220-62B D00Z02044 N/A Cat ID: 1020275; Unknown Replacement No Disc/Seat Ring Assembly Chapman for valve 3-0220-62B UTC - 0002605876 Description of work:-: Replaced Disc and Seat Ring Assembly with refurbished spare from stock.
8. Test Conducted: Hydrostatic [ ) Pneumatic [] Nominal Operating Pressure [ - Not Applicable [X]

Test Pressure _ psig Test Temperature _ OF

9. Remarks: None.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIRIREPLACEMENT Conforms to Section Xl of the ASME Code.

, 4k - ISI COORDINATOR _ -____" _2003 Signed:

or Owners Designee) (Title) (Date)

Certificate of Inspection and the State or Pvince of 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors Inthis report on Z--6.. . .

Illinois, employed by Hartford Steam Boiler of CT having Inspected the REPAIR/REPLACEMENT described with Section XI of the ASME Code. By and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance the repair or replacement described certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning signing this injury or property damage or a loss of inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal any kind arising from or connected with this Inspection.

. Commissions: oi932.

NBt742NISB Date: )-Inspector. - IFRobert T Rainey T.

-0 nspetorRobet Raiey I I f-tate or Province National Board)

Ir I

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 01-10-2003

1. Owner. Exelon Generation Company (EGC. LLC) 200 Exelon Way. Kennett Square. PA. 19348 (Address) Sheet: I.._ Of _I_
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3.__

6500 North Dresden Road, Morris IL.. 60450 (Address) W03 85110-01 (PLAN 3-02-0741

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 4700 (Drvwell Pneumatic)
5. (a) Construction Code USAS B31.1.0 1967 Edition, N_.o. Addenda, Code Cases NONE 19 98* Edition, No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement "1998 Edition implemented in accordance with Relief Request MCR-02
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Stamped Component Manufacturer Serial No. Brd ID Built Replaced or No Replacement Yes/No Unknown Unknown N/A Unknown Unknown Replaced No Various Drywell Pneumatic system components and valves 3-4720 and 3-4721 Unknown Heat Code: N/A Cat ID: 36383; UTC Unknown Replacement No Pipe Cap installed at Penetration X-139D JBP -2646609 and 3-4721. Capped line 3
7. Description of work: Removed or abandoned various Drywell Pneumatic piping and components including valves 3-4720

,7320-1"-H near Penetration X-139D.

8. Test Conducted: Hydrostatic [] Pneumatic[ ] Nominal Operating Pressure [] Not Applicable [X]

Test Pressure _ psig Test Temperature OF

9. Remarks: VT-1 performed per ER-AA-335-018 after completion of work with no indications identified.

I Certificate of Compliance the ASME Code.

We certify that the statments made inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of Signed: IS,COORDINATOR - 2003 (Title) (Date)

S"4'69ner or Owner's Designee)

Certificate of Inspection Povinc of I,the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or

_ 20.o Illinois, employed by Hartford Steam Boiler of CT having Inspected the REPAIR/REPLACEMENT described inthis report on Code. By my knowledge and belief, this repair or replacement has been constructed in accordance with Section Xl of the ASME and state to the best of described makes any warranty, expressed or implied, concerning the repair or replacement signing this certificate neither the Inspector nor his employer damage or a loss of in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or property any kind arising from or connected with this Inspection. A ~

Date: iI*/f- .). Inspector. Robert T. Rainev Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 12-17-2002

1. Owner: Exelon Generation Comoanv (EGC. LLC) 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: .. _ Of I
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL., 60450 (Address) Pl AN A17-fl2.fl7.

Wit OQ*IQK*.*I

3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (Low Pressure Coolant Inlection)
5. (a) Construction Code ASME Sect.VIII, 1965 Edition, NO Addenda, Code Cases NONE 1989 Edition, NO Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replaoement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Manufacturer Serial No. Brd ID Built Replaced or Stamped Component No Replacement Yes/No Consolidated- Unknown N/A P/N: 1905FC N/A Replaced No Relief valve at EPN 3-1501-13C Dresser XMC536.

Consolidated- TM67813 N/A Cat ID-44534, UTC- N/A Replacement No Relief valve at EPN 3-1501-13C Dresser 0002622134, P/N:

1905F-1 -(1-1-3-2)

XLA2-NC3155.

7. Description of work: Replace the flancqed relief valve with a refurbished one.
8. Test Conducted: Hydrostatic [ Pneumatic [ Nominal Operating Pressure [X ] Not Applicable [ ]

Test Pressure 5.4 psig Test Temperature Ambient "F

9. Remarks: Satisfactory VT-2 performed underWO 99019532-04.

Certificate of Compliance We certify that the statements made In this report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Code.

Signed: ( I or Owne~s Designee) S CORDNTOR (Titie) (Date) .2002__

Certificate of Inspection I, the undersigned, holding a vaFld commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurpncend Inspecion Co. of Hartford, Connecticut having Inspected the REPAIR/REPLACEMENT described in this report on /- "..2.. 2f _ and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer nor his makes any warranty, expressed or implied, conceming the repair or replacement described in this report. Furthermore, neither the Inspector employer shall be liable in any manner for any personalnjuty or property damage or a loss of any kind arising from or connected with this Inspection.

f%.#& /ý -4i In.rwnr"

  1. / 1 i7'* /i Commissions: 1L932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section X!

Date: 12-17-2002

1. Owner: Exelon Generation Companv (EGC. LLC) (Name) Sheet: 1 Of I 200 Exelon Way. Kennett Square, PA. 19348 (Address)

Unit: 3

2. Plant: Dresden Nuclear Power Station (Name) 6500 North Dresden Road, Morris IL.. 60450 (Address) Pl AM ."4-f'19..f'7R (Name) Repai 4dr'2A Oraizto P f%4 A.No.

Job2N.0etc

3. Work Performed By: Same as Above Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1500 (LPCI)

Addenda, Code Cases NONE

5. (a) Construction Code USAS B31.1/ ASME Section ViII, 19 67/65 Edition, No/No NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases
6. Identification of Components Repaired or Replaced and Replacement Components Nat Other Year Repair, Code Name of Name of Mfrs.

Brd ID Built Replaced or Stamped Component Manufacturer Serial No.

No Replacement Yes/No N/A P/N: 1905FC/SPEC N/A Replaced No Relief valve at EPN Consolidated- Unknown 3-1501-13D Dresser N/A Cat ID-44534, UTC- N/A Replacement No Relief valve at EPN Consolidated- C25722 Dresser 2651636, P/N:

3-1501-13D 1905FC-SPEC.

K,..R*. Description of work: Removed existing relief valve and replaced with a rebuilt/tested spare relief valve.

Pneumatic [ I Nominal Operating Pressure [XI Not Applicable ]

8. Test Conducted: Hydrostatic ]

Test Pressure 5.2 psig Test Temperature Ambient OF

9. Remarks: Satisfactory VT-2 examination was recorded under WO 99019534-03.

Certificate of Compliance Conforms to Section Xl of the ASME Code.

We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT W S1 COORDINATOR 'S -30 ,2002 SigniSed:IA A

(*-;e--or Owners Designee) (Title) (Date)

Vessel Inspectors and the State or Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Connecticut the this repair or having inspected lo and Boiler Insurpnc and Inspectio of Hartford, at e;ft~tna~**:ae*i:ef, Illinois, employed by The Hartford Steam p'r .

of my knowledge and beliefothis epa or REPAIR/REPLACEMENT described In this report on -- ... 0.. and state to the best has been constructed inaccordance with Section Xi of the ,ECode. By signig this certificate neither the inspector nor his employer replacement in this report. Furthermore, neither the Inspector nor his makes any warranty, expressed or implied, concerning the repair or replacement described a loss of any kind arising from or connected with this Inspection.

injury or property damage or employer shal be liable In any manner for any personal Inspector_ Commissions: 11932, NB7742NISB Date: 1-3 (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 11-Q072002

1. Owner. Exelon Generation Company (EGC. LLC) 200 Exelon Way. Kennett Square. PA. 19348 (Address) Sheet: --I- Of...I
2. Plant: Dresden Nuclear Power Station (Name) Unit: :3 6500 North Dresden Road. Morris IL. 60450 (Address) WO 99223699-01 (PLAN 3-02-077)
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 1600 (Containment)

, 1965 Edition, Summer 1965 Addenda, Code Cases NONE

5. (a) Construction Code ASME Section III (b) Edition of Section Xl used for Repair/Replacement 1998" Edition, NO Addenda, Code Cases NONE

"*1998Edition implemented in accordance with Relief Request MCR-02

6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair, Code Name of Manufacturer Serial No. Brd ID Built Replaced or Stamped Component No Replacement Yes/No Unknown Unknown N/A Unknown Unknown Replaced No Containment Penetration X-100 Nut Unknown Ht Code: PMN N/A Cat ID: 7221; UTC - Unknown Replacement No Containment Penetration X-100 Nut 2042482
7. Description of work: Replaced equipment hatch nut.

S*Test Conducted: Hydrostatic [ Pneumatic [ ] Nominal Operating Pressure [ Not Applicable [X]

Test Pressure _ psig Test Temperature _ OF KemarKs:

Certificate of Compliance We certify that the statements made inthis report are correct and this REPAIRIREPLACEMENT Conforms to Section XI of the ASME Code.

Signed::*6 ISI COORDINATOR 4, 0 _, 2002 z: 1Owner or Owner's Designee) (ritle) (Date)

Certificate of Inspection or/' 0Pvince _

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the ste Illinois, employed by Hartford Steam Boiler of CT having inspected the REPAIRIREPLACEMENT described Inthis report on A SME Code. By Section XI of the and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with or replacement described signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair or a loss of inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage any kind arising from or connected with this inspection.

Roert *,*. Rine Date/*-*r Ispetor ..... , - .- e ... ,,--;.,= .+;.,,o, 0-4,%

Date: Inspector Robert T. Rainey Commissions: 11932. NB7742NISB

  • , %o1wt.* filr-IVIK n-,,lil lov U=I~i

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI (Name) Date: 12-10-2002

1. Owner. Exelon Generation Comoanv (EGC. LLC) 200 E~xelon Way. Kennett Sauare. PA. 19348 (Ad dress) Sheet: I Of _1__
2. Plant: Dresden Nuclear Power Station (Name) Unit: :3 6500 North Dresden Road. Morris IL,. 60450 (Address) WO 516067-04 PLAN 3-02-082
3. Work Performed By: General Electric (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Addn

4. Identification of System: 0300 (Control Rod Drive)
5. (a) Construction Code ASME Sect. III 1965 Edition, W/65 Addenda, Code Cases 1335-2. 1361. 1352 1989 Edition, NO Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement
6. Identification of Components Repaired or Replaced and Replacement Components Name of Mfrs. Nat Other Year Repair. Code Name of Stamped Manufacturer Serial No. Brd ID Built Replaced or Component Yes/No No Replacement Unknown Unknown N/A Location: 38-39 WA Replaced No Control Rod Drive Flange Cap Screws.

Unknown Ht. Code-C475 N/A Cat. ID-42416, N/A Replacement No Control Rod Drive Flange Cap Screws. UTC's-2618187 receive a VT-1 examination with Description of work: Replace existina Ilanae cap screws with new flange cap screws. The removed cap screws did not acplication of Dresden Station Third Interval Relief Request CR-20.

8. Test Conducted: Hydrostatic [ ] Pneumatic [ I Nominal Operating Pressure [ Not Applicable IX]

Test Pressure _ psig Test Temperature - OF

9. Remarks:

Certificate of Compliance XI of the ASME Code.

We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section S*gned

& On11 COORDINATORl Pr o~~erbOwne' eine (T-ile) (Date)

Certificate of Inspection and the State or Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors Illinois, employed by The Hartford Steam and Boiler Insurance a/d Inspec Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT descnbed in this report on /*1 L/". ,200_' nd state to the best of my knowledge and belief, this repair or replacement has been constructed In accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his employer neither the Inspector nor his makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, with this inspection.

manner for any pe~sonal Irjury or progerty damage or a loss of any kind arising from or connected employer shall be liable inany Date: inspector Commissions: IL932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner Exelon Generation Company (EGC. LLC) (Name) Date: 12-17-2002 200 Exelon Way. Kennett Souare. PA. 19348 (Address) Sheet: .1. Of 1
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road. Morris IL.. 60450 (Address) pl AN 3-9Bfi0t Wfl Q7fl1 _"AAn77Jfl1
3. Work Performed By: Same as Above (Name) Repair Organization P.O. No., Job No. etc.

Same as Above (Address)

4. Identification of System: 2300 (l-IPCI)
5. (a) Construction Code USAS B31.1 /ASME Section VIII, 19 67/65 Edition, No/No Addenda, Code Cases NONE (b) Edition of Section XI used for Repair/Replacement 19 89 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Manufacturer Serial No. Brd ID Built Replaced or Stamped Component No Replacement Yes/No Consolidated- Unknown NWA P/N: 1905FC/SPEC WA Replaced No Relief valve at EPN 3-2301-23 Dresser Consolidated- TM67810 N/A Cat ID-44534, UTC- N/A Replacement No Relief valve at EPN 3-2301-23 Dresser 2049121, P/N:

1905F-1 -(1-1-3-2)

XLA2-NC3155.

t r I I I-I I

___________ I ________ I ______ I __ I ________

7. Description of work: Removed existing relief valve and replaced with a rebuilt/tested spare relief valve.
8. Test Conducted: Hydrostatic [ ] Pneumatic [ ] Nominal Operating Pressure [ X I Not Applicable []

Test Pressure 28 psig Test Temperature Ambient OF

9. Remarks: Satisfactory VT-2 examination was recorded underWO 97134077-02.

Certificate of Compliance Code.

We certify that the statements made inthis report are correct and this REPAIR/REPLACEMENT Conforms to Section XI of the ASME Signed: XISI COORDINATOR 12 -J0 2002 j

Sgd "*

/ -rer or Owner's Designee) (Title) (Date)

Certificate of Inspection or Province of I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State Illinois, employed by The Hartford Steam and Boiler lnsgranj and Inspection Co. of Hartford, Connecticut having Inspected the this repair or REPAIRIREPLACEMENT described In this report on . 20_I. and state to the best of my knowledge and belief, inspector nor his employer replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate neither the Inspector nor his makes any warranty, expressed or implied, concerning the repair or replacement described in this report. Furthermore, neither thewith this inspection.

employer shall be liable inany manner for any pes 1atinju or property damage or a loss of any kind arising from or connected Date: L- . Inspector_ Commissions: IL932. NB7742NISB (State or Province, National Board)

FORM NIS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required by the Provisions of ASME Code Section XI

1. Owner: Exelon Generation Companv (EGC. LLC) (Name) Date: 12-17-2002 200 Exelon Way. Kennett Sauare. PA. 19348 (Address) Sheet: ...1 Of 1._
2. Plant: Dresden Nuclear Power Station (Name) Unit: 3 6500 North Dresden Road, Morris IL.. 60450 (Address)

WO 970134076-01 PLAN 3-98-013

3. Work Performed By: Same as Above (Name)

Same as Above (Address) Repair Organization P.O. No., Job No. etc.

4. Identification of System: 1400 (Core Sprav)
5. (a) Construction Code USAS B31.1 /ASME Section VIII, 19 67/65 Edition, No/No Addenda, Code Cases NONE (b) Edition of Section Xl used for Repair/Replacement 1989 Edition, NO Addenda, Code Cases NONE
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Mfrs. Nat Other Year Repair, Code Component Manufacturer Serial No. Brd ID Built Replaced or Stamped No Replacement Yes/No Relief valve at EPN Consolidated- Unknown N/A P/N: 1910HC N/A Replaced No 3-1402-28B Dresser XMY24 Relief valve at EPN Consolidated- TN03494 N/A Cat ID-45338, UTC- N/A Replacement No 3-1402-28B Dresser 2646345, P/N:

1910HC-1-XMY24.

4 t tt 1 7 1 4 4 4-1 I I 4 4-4. 4 4 I + f-+ I t I YJ7. Description of work: Removed existincq relief valve and reolaced with a rebuilt/tested sware relief valve.

8. Test Conducted: Hydrostatic[ ] Pneumatic[ ] Nominal Operating Pressure [X] Not Applicable []

Test Pressure 255 psig Test Temperature Ambient OF

9. Remarks: Satisfactory VT-2 examination was recorded underWO 97134076-10.

Certificate of Compliance We certify that the statements made in this report are correct and this REPAIR/REPLACEMENT Conforms to Section Xl of the ASME Code.

Signed: e ISI COORDINATOR /2 -3O ,2002 C:wl(OR-erurOwners Designee) (T-ite) (Date)

Certificate of Inspection I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois, employed by The Hartford Steam and Boiler Insurance and lnspectign Co. of Hartford, Connecticut having inspected the REPAIR/REPLACEMENT described Inthis report on L "" " , g and state to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with ,ecion Xl of the ASME Code. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair or replacement descnbed inthis report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Date: SW Inspector /* t-f Commissions: 11-932. NB7742NISB (State or Province, National Board)