Similar Documents at Hatch |
---|
Category:E-Mail
MONTHYEARML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) ML21354A5942021-12-20020 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-227 and TSTF-297 LAR (L-2021-LLA-0227) ML21347A8532021-12-13013 December 2021 NRR E-mail Capture - Required: Hatch TSTF-505 LAR - Audit Plan - Additional Documents to Be Uploaded to the Portal ML21347A9002021-12-13013 December 2021 NRR E-mail Capture - Updated Request: Additional Request for SNC to Place Document on the Portal ML21363A0872021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Question - Hatch - Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature (L-2021-LLA-0188) ML21321A3812021-11-16016 November 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-505 LAR (L-2021-LLA-0199) ML21306A3272021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review - Hatch Eliminate Ms Line Isolation on High Turbine Building Area Temperature LAR (L-2021-LLA-0188) ML21292A1562021-10-19019 October 2021 NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21253A1992021-09-10010 September 2021 NRR E-mail Capture - Clarification Call Summary - Hatch Pre-Submittal Meeting TSTF-505 LAR ML21174A1182021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115) ML21132A0132021-05-11011 May 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet QATR Reduction in Commitment Licensing Action - L-2021-LLQ-0002 ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21105A0132021-04-14014 April 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052) ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20318A0212020-11-12012 November 2020 NRR E-mail Capture - Fyi - Acceptance Review - SNC Fleet TSTF-541 LAR (L-2020-LLA-0232) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20258A0272020-09-11011 September 2020 Acceptance Review - Hatch TSTF-582 LAR (EPID L-2020-LLA-0194) (e-mail) 2024-01-09
[Table view] |
Text
Pacie I Paae II I
[ Caswell 5mith - Mime.622 I Caswell 3mitli - Mime.522 Received: from igate.nrc.gov by nrcgwia.nrc.gov; Tue, 09 Dec 2003 16:14:11 -0500 Received: from smtpgw3.bnl.gov (smtpgw3.bnl.gov [130.199.3.20])
by smtp-gateway ESMTPce id hB9L9GU3029445 for <CFS1 @nrc.gov"; Tue. 9 Dec 2003 16:09:16 -0500 (EST)
Received: from exchangeO2.bnl.gov ([1 30.199.74.18])
by smtpgw3.bnl.gov with esmtp (Exim 3.36 #1) id 1ATpBJ-00O0w4-00 for cCFS1@nrc.gov>; Tue, 09 Dec 2003 16:14:09 -0500 Received: by exchangeO2.bnl.gov with Internet Mail Service (5.5.2657.72)
Id <XNAG18XF>; Tue. 9 Dec2003 16:10:35 -0500 Message-ID: <1655641 A03CED411 BDCB0002B309452408573145@exchangeO2.bnl.gov>
From: "Sullivan, Kenneth" <ksebnl.gov>
To: 'Caswell Smith" CCFSI@}nrc.gov'
Subject:
RE: Hatch TFPI 'URI 50-366/03-06-06" Date: Tue, 9 Dec 2003 16:10:34 -0500 MIME-Version: 1.0 X-Mailer Internet Mail Service (5.5.2657.72)
Content-Type: text/plain; charset="iso-8859-1" X-BNL-MailScanner Found to be clean Caswell IN GENERAL: IF the postulated circuit failure would have a direct impact on the operation of the credited SSD system the circuits are considered REQUIRED CIRCUITS and must be provided with protection per III.G.2.
For a fire in FA 2104 (East Cableway) the Hatch SSAR credits the use of SSD Path 1. Path I utilizes RCIC and S/RVs to provide eactor protection via depressurization, inventory makeup, and decay heat removal. One SIRV should be opened to begin depressurization before the reactor water level reaches level 8 (approximately 2 1/2 hours). RCIC should be operated to aintain RPV inventory between RPV water level 3 and 8 until the RCS is within the LPCI operability pressure range of pproximately 135 psig (approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> into the event), at which time an additional S/RV will be opened to initiate the alternate shutdown cooling mode of operation (ASDC).
As stated in Table 3.1 The required Safe Shutdown Mode for the SRVs Is CLOSED Except for SRVs B21-FO13G and B21-FO13H which are required to be operable in order to manually depressurize the RPV. Two S/RVs are required to remain manually operable. - If all SRVs open then this criterion is obvioulsy not met.
In addition, motive power for the RCIC pump is provided by the RCIC turbine which is driven by steam from the reactor. Therefore, in addition to other concerns, the spurious opening of all SRVs (due to fire damage to circuits ABE019CO8 and ABE019CO9) would impact the credited SSD (Path 1) by causing a loss of motive steam to RCIC.
If RCIC was the only makeup system credited in the SSAR the SRV circuits shoudl be considered as REQUIRED CIRCUITS and protected per III.G.2.
However, the SSAR does recognize the potential for this event (spurious
Caswell Smith - Mime.822 Page2 opening of all SRVs) and describes methods to prevent occurrence (open liinks) or mitigate its impact on the SSD capability (use of Core Spray Loop A). IF: the opening of links was shown to be an effective method of preventing occurrence and/or CS Loop A was demonstrated (by documented analysis) to be available and capable of mitigating this event I would not have any concerns. However, I am not sure that this is the case. At the time of the inspection we questioned both the licensing basis and technical adequacy/feasibility of manual actions to prevent this occurrence and we were not provided with any objective evidence which demonstrated that CS was capable of mitigating this event hope this helps -
Ken
-Original Message-From: Caswell Smith fmailto:CFSI@nrc.gov]
Sent: Thursday, December 04, 2003 7:58 AM To: Sullivan, Kenneth Subject Hatch TFPI 'URI 50-366/03-06-06' Hi, Ken I am working on the licensee's response to our inspection findings and I have a question. The licensee claims that the 4-20 milli-amp instrument circuits are not required for the SRVs to perform their design function and are therefore associated circuits.
The logic developed by these circuits, however, are used in the 125 VDC Class 1E control circuit of of the SRVs which are required post-fire safe shutdown equipment.
The licensee claims that this circuit is made up of two parts, one part Is the required circuit which implements the required Appendix R manual opertor action . The other part Is not rquired for Appendix R functions, and implements the backup over-pressure protection for the nuclear boiler.
I totally disagree with this definition of an electrical circuit which is not consistent with the definition given in IEEE 100-1977, IEEE Standard Dictionary of Electrical and Electronic Terms. . --
Based on your vast experience of Appendix R regulations, can the circuit of a required post fire safe shutdown equipment used for establishing hot shutdown conditions be classified this way?
Appendix R, Section Ill.G.2, requires that the circuits of required post fire safe shutdown equipment be protected from fire damage. Are the instrument circuits required circuits and should they have been protected in accordance with this regulatory requirement?
I would appreciate your comments, Thanks
ICaswell Smith - Mime.822 ageii Page 3I I would appreciate your interpretation of this
Mail Envelope Properties (3FD63B26.14B: 15: 41291)
Subject:
RE: Hatch TFPI "URI 50-366/03-06-06" Creation Date: Tue, Dec 9, 2003 4:10 PM From: "Sullivan, Kenneth" <ks~bnl.gov>