E-mail from K. Sullivan to C. Smith; URI 50-366/03-06-06
ML050380474
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/09/2003
From: Sullivan K
- No Known Affiliation
To: Casey Smith
NRC/RGN-II/DRS/EB
References
FOIA/PA-2004-0277 IR-03-006
Download: ML050380474 (4)


Text

Pacie I Paae II I

[ Caswell 5mith - Mime.622 I Caswell 3mitli - Mime.522 Received: from igate.nrc.gov by nrcgwia.nrc.gov; Tue, 09 Dec 2003 16:14:11 -0500 Received: from smtpgw3.bnl.gov (smtpgw3.bnl.gov [130.199.3.20])

by smtp-gateway ESMTPce id hB9L9GU3029445 for <CFS1 @nrc.gov"; Tue. 9 Dec 2003 16:09:16 -0500 (EST)

Received: from exchangeO2.bnl.gov ([1 30.199.74.18])

by smtpgw3.bnl.gov with esmtp (Exim 3.36 #1) id 1ATpBJ-00O0w4-00 for cCFS1@nrc.gov>; Tue, 09 Dec 2003 16:14:09 -0500 Received: by exchangeO2.bnl.gov with Internet Mail Service (5.5.2657.72)

Id <XNAG18XF>; Tue. 9 Dec2003 16:10:35 -0500 Message-ID: <1655641 A03CED411 BDCB0002B309452408573145@exchangeO2.bnl.gov>

From: "Sullivan, Kenneth" <ksebnl.gov>

To: 'Caswell Smith" CCFSI@}nrc.gov'

Subject:

RE: Hatch TFPI 'URI 50-366/03-06-06" Date: Tue, 9 Dec 2003 16:10:34 -0500 MIME-Version: 1.0 X-Mailer Internet Mail Service (5.5.2657.72)

Content-Type: text/plain; charset="iso-8859-1" X-BNL-MailScanner Found to be clean Caswell IN GENERAL: IF the postulated circuit failure would have a direct impact on the operation of the credited SSD system the circuits are considered REQUIRED CIRCUITS and must be provided with protection per III.G.2.

For a fire in FA 2104 (East Cableway) the Hatch SSAR credits the use of SSD Path 1. Path I utilizes RCIC and S/RVs to provide eactor protection via depressurization, inventory makeup, and decay heat removal. One SIRV should be opened to begin depressurization before the reactor water level reaches level 8 (approximately 2 1/2 hours). RCIC should be operated to aintain RPV inventory between RPV water level 3 and 8 until the RCS is within the LPCI operability pressure range of pproximately 135 psig (approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> into the event), at which time an additional S/RV will be opened to initiate the alternate shutdown cooling mode of operation (ASDC).

As stated in Table 3.1 The required Safe Shutdown Mode for the SRVs Is CLOSED Except for SRVs B21-FO13G and B21-FO13H which are required to be operable in order to manually depressurize the RPV. Two S/RVs are required to remain manually operable. - If all SRVs open then this criterion is obvioulsy not met.

In addition, motive power for the RCIC pump is provided by the RCIC turbine which is driven by steam from the reactor. Therefore, in addition to other concerns, the spurious opening of all SRVs (due to fire damage to circuits ABE019CO8 and ABE019CO9) would impact the credited SSD (Path 1) by causing a loss of motive steam to RCIC.

If RCIC was the only makeup system credited in the SSAR the SRV circuits shoudl be considered as REQUIRED CIRCUITS and protected per III.G.2.

However, the SSAR does recognize the potential for this event (spurious

Caswell Smith - Mime.822 Page2 opening of all SRVs) and describes methods to prevent occurrence (open liinks) or mitigate its impact on the SSD capability (use of Core Spray Loop A). IF: the opening of links was shown to be an effective method of preventing occurrence and/or CS Loop A was demonstrated (by documented analysis) to be available and capable of mitigating this event I would not have any concerns. However, I am not sure that this is the case. At the time of the inspection we questioned both the licensing basis and technical adequacy/feasibility of manual actions to prevent this occurrence and we were not provided with any objective evidence which demonstrated that CS was capable of mitigating this event hope this helps -

Ken

-Original Message-From: Caswell Smith fmailto:CFSI@nrc.gov]

Sent: Thursday, December 04, 2003 7:58 AM To: Sullivan, Kenneth Subject Hatch TFPI 'URI 50-366/03-06-06' Hi, Ken I am working on the licensee's response to our inspection findings and I have a question. The licensee claims that the 4-20 milli-amp instrument circuits are not required for the SRVs to perform their design function and are therefore associated circuits.

The logic developed by these circuits, however, are used in the 125 VDC Class 1E control circuit of of the SRVs which are required post-fire safe shutdown equipment.

The licensee claims that this circuit is made up of two parts, one part Is the required circuit which implements the required Appendix R manual opertor action . The other part Is not rquired for Appendix R functions, and implements the backup over-pressure protection for the nuclear boiler.

I totally disagree with this definition of an electrical circuit which is not consistent with the definition given in IEEE 100-1977, IEEE Standard Dictionary of Electrical and Electronic Terms. . --

Based on your vast experience of Appendix R regulations, can the circuit of a required post fire safe shutdown equipment used for establishing hot shutdown conditions be classified this way?

Appendix R, Section Ill.G.2, requires that the circuits of required post fire safe shutdown equipment be protected from fire damage. Are the instrument circuits required circuits and should they have been protected in accordance with this regulatory requirement?

I would appreciate your comments, Thanks

ICaswell Smith - Mime.822 ageii Page 3I I would appreciate your interpretation of this

Mail Envelope Properties (3FD63B26.14B: 15: 41291)

Subject:

RE: Hatch TFPI "URI 50-366/03-06-06" Creation Date: Tue, Dec 9, 2003 4:10 PM From: "Sullivan, Kenneth" <ks~bnl.gov>

Created By: ks~bnl.gov Recipients nrc.gov ATL PO.ATLDO CFSI (Caswell Smith)

Post Office Route ATLPO.ATLDO nrc.gov Files Size Date & Time MESSAGE 4154 Tuesday, December 9, 2003 4:10 PM Mime.822 5208 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard