Special Report, Channel #11 Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance
ML040760756
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/05/2004
From: Hopkins L
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1817
Download: ML040760756 (2)


Text

P.O. Box 63 Lycoming, New York 13093 Constellation Energy Group Nine Mile Point Nuclear Station March 5, 2004 NMP1L 1817 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Nine Mile Point Unit 1

-DocketNo. 50-220 License No. DPR-63 Special Report, Channel #11 Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance Gentlemen:

In accordance with Action 4.a of Nine Mile Point Unit 1 Technical Specification Table 3.6.11-2, "Accident Monitoring Instrumentation Action Statements," Nine Mile Point Nuclear Station, LLC (NMPNS) is submitting the following Special Report concerning the inoperability of the Channel #11 Containment Hydrogen Monitoring System.

Description of Event On February 23, 2004, at approximately 1624 hours0.0188 days <br />0.451 hours <br />0.00269 weeks <br />6.17932e-4 months <br />, operators declared the Channel #11 Containment Hydrogen Monitoring System inoperable for scheduled preventive maintenance.

The redundant Channel #12 Containment Hydrogen Monitoring System was verified to be operable prior to removing Channel #11 from service.

Cause of Event The Channel -#11 Containment Hydrogen Monitoring System was declared inoperable in order to perform scheduled preventive maintenance.

Page 2 NMP1L 1817 CorrectiveActions The scheduled preventive maintenance was completed and the Channel #11 Containment Hydrogen Monitoring System was returned to an operable status on February 27, 2004, at approximately 1655 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.297275e-4 months <br />.

Very truly yours, Lawrence A. Hopkins Plant General Manager LAH1JRHirjm cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector