Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000346/20183012018-04-25025 April 2018 NRC Initial License Examination Report 05000346/2018301 (Rdb) IR 05000346/20163012016-08-0909 August 2016 NRC Initial License Examination Report 05000346/2016301, June 13, 2016, Through June 29, 2016 IR 05000346/20153012015-08-14014 August 2015 Er 05000346/2015301; 06/15/2015 - 06/30/2015; Firstenergy Nuclear Operating Company; Davis-Besse Nuclear Power Station; Initial License Examination Report L-13-274, Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations2013-08-28028 August 2013 Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations IR 05000346/20093012009-09-0101 September 2009 Er 05000346-09-301(DRS), on 07/13/09 - 07/24/09, Davis-Besse Nuclear Power Station, Initial License Examination Report IR 05000346/20083012008-04-0808 April 2008 Er 05000346-08-301 (Drs); 02/20/08 - 03/11/08; Davis-Besse Nuclear Power Station; Initial License Examination Report IR 05000346/20043012004-06-10010 June 2004 Er 05000346/2004301(DRS); on 05/03/2004-05/10/2004; for Davis-Besse Nuclear Plant; Initial License Examination Report ML0416002802004-05-10010 May 2004 Initial SRO Examination 05/2004 IR 05000346/20023012002-03-28028 March 2002 Er 05000346/2002-301, on 03/04/2002 - 03/08/2002, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station. Initial License Examination Report ML9934803431999-11-15015 November 1999 Operator Licensing Examination Administered Septmber 13-20,1999 at DAVIS-BESSE, Docket NO.50-346 2018-04-25
[Table view] |
Text
une 10, 2004
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION NRC EXAMINATION REPORT 05000346/2004301(DRS)
Dear Mr. Bezilla:
On May 10, 2004, the NRC completed initial operator licensing examinations at your Davis-Besse Nuclear Power Station. The enclosed report presents the results of the examination.
The NRC examiners administered initial license examination operating tests during the week of May 3, 2004, for three reactor operator and five senior reactor operator applicants. Members of the Davis-Besse Nuclear Power Station Training Department administered an initial license written examination on May 10, 2004, to the applicants. The results of the operating tests and written examinations were finalized on June 4, 2004. All eight applicants passed all sections of their corresponding examinations resulting in the issuance of three senior reactor operator licenses.
During the NRCs review of initial license applications, two senior reactor operator applicants and three reactor operator applicants were granted waivers so that the applicants could take the examination. These five applicants will need to complete six weeks on shift at greater than 20 percent power before they will receive a license. The applicants will be granted a license only after you certify in writing to the NRC that the applicants have completed the eligibility requirement that was previously waived.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3
Enclosures:
1. Operator Licensing Examination Report 05000346/2004301(DRS)
2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO/SRO)
REGION III==
Docket No: 50-346 License No: NPF-3 Report No: 05000346/2004301(DRS)
Licensee: FirstEnergy Nuclear Operating Company Facility: Davis-Besse Nuclear Power Station Location: 5501 North State Route 2 Oak Harbor, OH 43449-9760 Dates: May 3 through May 10, 2004 Examiners: N. Valos, Chief Examiner D. McNeil, Examiner R. Walton, Examiner Approved by: R. Lanksbury, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000346/2004301(DRS); 05/03/2004-05/10/2004; Davis-Besse Nuclear Plant; Initial
License Examination Report.
The announced operator licensing initial examination was conducted by regional examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Draft Revision 9.
Examination Summary Five applicants were administered senior reactor operator license examinations and three applicants were administered reactor operator license examinations. All eight applicants passed all portions of their respective examinations resulting in the issuance of three senior reactor operator licenses.
During the NRCs review of initial license applications, two senior reactor operator applicants and three reactor operator applicants were granted waivers so that the applicants could take the examination. These five applicants will need to complete six weeks on shift at greater than 20 percent power before they will receive a license. The applicants will be granted a license only after the licensee certifies in writing to the NRC that the applicants have completed the eligibility requirement that was previously waived. (Section 4OA5.1)
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Inspection Scope
The NRC examiners conducted announced operator licensing initial examinations during the period of May 3 through May 10, 2004. The facility licensees training staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Draft Revision 9, to prepare the outline and develop the written examination and operating test. The examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of May 3 through May 7, 2004. The facility licensee administered the written examination on May 10, 2004. Five senior reactor operator applicants and three reactor operator applicants received written examinations and operating tests.
b. Findings
Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
All changes made to the submitted examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The licensee had no post examination comments on the written examination.
Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
All changes made to the submitted examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
Examination Results All eight applicants passed all portions of their respective examinations resulting in the issuance of three senior reactor operator licenses.
During the NRCs review of initial license applications, two senior reactor operator applicants and three reactor operator applicants were granted waivers so that the applicants could take the examination. These five applicants will need to complete six weeks on shift at greater than 20 percent power before they will receive a license. The applicants will be granted a license only after the licensee certifies in writing to the NRC that the applicants have completed the eligibility requirement that was previously waived.
.2 Examination Security
a. Inspection Scope
The examiners reviewed and observed the licensees implementation and controls of examination security during the examination preparation and administration.
b. Findings
The licensees implementation of examination security requirements during examination preparation and administration were acceptable and met the guidelines provided in NUREG-1021, Operator Licensing Examination Standards for Power Reactors. No violations of 10 CFR 55.49 occurred during the examination preparation and administration.
4OA6 Meetings
.1 Exit Meeting
The chief examiner presented the examination teams preliminary observations and findings to members of the licensee management on May 7, 2004. No proprietary items were identified during the administration of the examination nor during the exit meeting with the licensee. The licensee acknowledged the observations and findings presented.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Enclosure 1
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- G. Dunn, Regulatory Affairs Manager
- A. Bless, Regulatory Affairs
- P. Faris, Nuclear Quality Assessment Evaluator
- J. House, Training Instructor
- D. Imlay, Operations Superintendent
- S. Lindsay, Training Exam Developer
- S. Martin, Training Initial License Lead Instructor
- M. Roder, Operations Training Supervisor
- G. Wilson, Reactor Engineering Supervisor
NRC
- N. Valos, Chief Examiner
- S. Thomas, Senior Resident Inspector, Davis-Besse
ITEMS OPENED, CLOSED AND DISCUSSED
Opened
None
Closed
None
Discussed
None
LIST OF ACRONYMS
ADAMS Agency-Wide Document Access and Management System
CFR Code of Federal Regulations
CR Condition Report
DRS Division of Reactor Safety
NRC Nuclear Regulatory Commission
PARS Publicly Available Records System
RO Reactor Operator
SRO Senior Reactor Operator
STR Simulator Trouble Report
SIMULATION FACILITY REPORT
Facility Licensee: Davis-Besse Nuclear Plant
Facility Licensee Docket No. 50-346
Operating Tests Administered: May 3 - May 7, 2004
The following documents observations made by the NRC examination team during the initial
operator license examination. These observations do not constitute audit or inspection findings
and are not, without further verification and review, indicative of non-compliance with
CFR 55.45(b). These observations do not affect NRC certification or approval of the
simulation facility other than to provide information which may be used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
While performing Job Performance Measures (JPMs) during examination week,
the indicating lights for several components on the Emergency Core Cooling
System equipment panel were flickering noticeably. Two input/output cards were
replaced to repair the problem. [CR Number 04-03105 written]
While running the first set of Scenario 3 during examination week, the simulator
halted. An existing condition was identified that could cause an inadvertent halt
of the simulator. The simulator was re-booted and the scenario was continued.
[CR Number 04-03174 and STR Number 2249 written]
While performing the Main Feedwater Pump Turbine Governor Overspeed Test
in Scenario 2, the annunciator MFPT2 TRIP did NOT alarm as expected.
[STR Number 2246 written]
WRITTEN EXAMINATIONS AND ANSWER KEYS (RO/SRO)
RO Examination and Answer Key ADAMS Accession No. ML041600273
SRO Examination and Answer Key ADAMS Accession No. ML041600280
3