Category:ANY EXTERNAL MEMORANDUM ROUTED TO NRC & NOTES
MONTHYEARML19319D1501978-04-28028 April 1978 Field Change Authorization to Implement Reactor Trip on Loss of Feedwater Pump or Upon Turbine Trip 1978-04-28
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211L3311999-09-0303 September 1999 Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211L3311999-09-0303 September 1999 Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 ML20207F8451999-03-0202 March 1999 Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 ML20207L7771999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled ML20203J0851999-02-18018 February 1999 Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves ML20151X0311998-08-27027 August 1998 Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20236Y5761998-08-0606 August 1998 Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20236S1451998-07-17017 July 1998 Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL ML20236U5641998-07-10010 July 1998 Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project ML20249A7921998-06-12012 June 1998 Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations ML20248M0831998-06-11011 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20248L7421998-06-0505 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20217Q5271998-05-0404 May 1998 Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act ML20217Q5551998-05-0101 May 1998 Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 ML20216J5241998-04-15015 April 1998 Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis ML20203A3651998-02-12012 February 1998 Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal ML20199F9211998-01-27027 January 1998 Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope ML20199A4851998-01-0707 January 1998 Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, ML20199A4811998-01-0505 January 1998 Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) ML20203C4761997-12-0505 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal ML20202E6581997-11-26026 November 1997 Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations ML20198Q4231997-11-0404 November 1997 Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting ML20198Q4921997-11-0404 November 1997 Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions ML20199B9791997-11-0404 November 1997 Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting ML20199C4821997-11-0404 November 1997 Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA ML20198Q2751997-11-0404 November 1997 Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues ML20217K8131997-10-17017 October 1997 Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification ML20212F2361997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 ML20198R8001997-10-16016 October 1997 Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled ML20198K0451997-10-15015 October 1997 Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl ML20211P4381997-10-0909 October 1997 Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes ML20216J4361997-09-10010 September 1997 Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes ML20217Q9611997-08-28028 August 1997 Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart ML20217D3341997-07-30030 July 1997 Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error ML20141C5761997-06-23023 June 1997 Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 ML20148J7341997-06-13013 June 1997 Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues ML20141H4691997-05-21021 May 1997 Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues ML20148C0851997-05-0707 May 1997 Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown ML20148C0931997-04-17017 April 1997 Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit ML20137V2781997-04-15015 April 1997 Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions ML20137D5741997-03-25025 March 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl ML20137A1391997-03-13013 March 1997 Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20135E1991997-03-0404 March 1997 Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents ML20134H5211997-02-0707 February 1997 Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions ML20147C3351997-01-27027 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 ML20133K9871997-01-16016 January 1997 Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable ML20210L3471997-01-14014 January 1997 Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed ML20203B3911996-12-24024 December 1996 Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) ML20203B5281996-12-0404 December 1996 Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo 1999-09-03
[Table view] |
Text
~
. , 1 PDS.210u s. 5 (7-77)
, ' FIELD' CHANGE AUTHCRIZATION BABCGCK & VIILCCX CUStontR DATE C0mi NO. o x i . o . 75 a v . a E . . a uf OaGi 9ro g FLORIDA POWER CORP. //d /;[7.c{p.>r 7f . uc -cca 7 04- J// O oo SUPFLIER P.A. NO. PART NO., OR.
TASK N0. GROUP N0. SEQ.No.
TITLE 4AX 30 a,. 1 2/ U"/
Reac(tor Trio on LcC:CNas o ACTERS)f FWP T. Turbine Trio _
f DESCRIPfl0N AND JUSilFICATION OF CHANGE:
Implement reactor trip upon loss of both main feedwater pumps or upon turbine trip.
)
?
?
a 6
1A5A5 AiriCiiy NO. COMPLETED REASON FOR CHINGE: (T.E. SIGN) DATE f TASK HQ TASF TITLE DOCS _ s _
i O SITE PROBLEH 6[ '//4//f O ENGINEERING REQUIREMENT 43 CR0 , .
O CUST0HER REQUEST O iHPR0vtMENT
@ OTHER (SPECIFY) M M W J f A/
SPR.00C.. OR LETTER NO./REF q l C0hCUR TO APPROVALS i CUS TOMEii/ CUS T0ftL A Aolmi DATE DISPOSITION OF FIELD CHANGE:
PROCEED NAME L, c'k ,, s f-df )p IMPLEMENTED PLEME%TEC REF.
l igr C-4m. w ;/~ *'"*""'"
'~'
!Of.d. H.t4 g g it e-rt. hl/::. 7/7y AUIM. Cnatui h0 PCA h3.
r %
9W YA Y I-@ l$
u *00s1307z,7 , pO F ,4 i.' * '
SHEET
e
L'i EXPE0iTE FIELD CWf!GE AUTKi?IZATION-CONTItrJATION O CORMAL REF DOCUMEpi MO.
REFEREMCE DOCUMENT fliLI Reactor Trip on Less of FWP & Turbine Trip SHEET / OF /0 DESCRIPTION OF CHAMGE:
1.0 Purpose Produce a reactor trip in response to a trip of the main turbine or a trip of both main feedwater pumps.
2.0 Philosoohy The philosophy is that the main feedwater pumps A and B trip signals may be ANDED to yield a signal indicating loss of both main feedwater pumps. This signal may be ORed with the main turbine trip signal fanned out, and utilized to trip both CRD trip breakers. This will re-sult in a trip of the reactor control rods.
3.0 Theory of Ooeration 3.1 Existino ICS Hardware Relays 86TT, 86 AFWPT, and 86 BFWPT including the field contacts associated with them already reside in the ICS. Note that the field contacts close to convey the respective trip states.
3.2 Conveying Main Feedwater Pumo Trips The trip of both Tnain feedwater pumps energizes relays 86 AFWPT and 86 BFWPT. Upon loss of both main feedwater pumps relay K3 de-energizes due to the opening of parallel contacts from 86 AFWPT and 86 BFWPT.
When relay K3 de-energizes 2 output contacts cause a reactor trip by means of the CRD trip breakers.
3.3 Conveyino Main Turbine Trio A trip of the main turbine causes closure of the contact in series with relay 86TT. ~ Relay 86TT energizes. This opens a contact in series with relay K3 de-energizing relay K3. K3 propagates a reactor trip as de-scribed in paragraph 3.2 above.
REVISED REQUIREMENTS SUPPLIER REvikl0NS l i TASK TASK TITLE (CONTINUATION SHEET) No.
PREPARED BY DATE REVIEWED gy DAfE 21 ICS
.-] 8 'MI Ydb7 FCA NO.
REVIEWED BY DATE 04 APPROV BY DATE AR gun smT u oF n'
~
P: .:ie.,...t.i2.
TIELO r."', :.. 'U M ZATiCN-LL.1i: JATION {.....% [7 .' ' - l l
l P. E F x:. :.
- 1 ui t - a .t .,. .: :4:a ..
P.cac .or .*ri;.'en Loss of R P & Turbir.e Trip
- - SHEET L OF /0 DESCRIPfl01,0F CMtmCE:
s.
3.4 Turtir.e Trio Evoass In order to allow for power escallation to provide for starting the main turnir.e, a t:ypass arrangement is proviceo. The bypass can te placed in effect cnly by manual action and ther. only if the turbine is trippcd. Once the turbine has been started (un-tripped) the bypass l automatically removes itself.
Asse.e the turbine is tripped. 85TT is r.nergized closing a contact in series with t'l. El may non be energi:c.1 by pressing the bypass switch.
K1 will seal by means of con =ct Kl;. Contact t'.it causes a con:rol room alam indicating a bypass stue. Contact Kls is closed causing ret 5y K3 to energize. Witn K3 tnergized centrol rod out motion is permitted.
. 3.5 Main Feedwater Pumo Bvoass
- l a .
In order to allow for control rod drive testing during reactor shutdown a bypass arrangement is provided. The bypass can be placed in effect l only by manual action and then only if both main faedwater pumps are )
tripped. Once a main feedwater pump has started (un-tripped) the bypass 1 atrtomatically removes itself. ;
Assume both main feedwater pumps are tripped. S5 AFWPT and 25 SFWpT are energized closing contacts in series with relay K2. K2 may now be ener-gized by pressing the bypass switch. K2 will seal in by means of contact K2A. Contact K2C causes a control room alarm indicating a bypass state.
Contact K2B is closed causing relay K3 to energize. With K3 energized control rod testing can be perfon:ed. -
~
3' Y D 9T D D A J C
,66 .
- - 1 R EV I 5 E D R EQ';l
. E Ep!> TS SUPPLIER REVISIONS TA$r TASE TITLE (CONTINUAT10i $NEET) {fNo.
PREPARED BY DATE REVIEWED BY DATE JCg 9EVIE*ED BY DATE ou.
APPkOVED BY I DATE SHEET OF I
IDS-310%,A5 t.(12 76)
^'s E 2PE0 " E FIE.D CM1.52 AUT'em ZAT!GN-CONTINJATIO!1 [] o ruAt p R(F u c c g E s. T m3, REF ERLnCE D00U4Emi YtiLt REACTOR TP.IP 0:1 LOSS OF FWP & TURBIflE TRIP SHEET 3 0F /0 DESCRIPfl0N OF CHANGE:
3.6 I4ormalTurbineShutdownBypass In order to allcw for nomal turbine shutdown, a bypass arrangement is provi ded. The bypass can be placed in effect only by manual action.
Depressing the bypass switch energizes Relay K4 which closes contacts K4A, K4B and K4C. Contact K4A maintains the circuit to K4 when the bypass switch is released. Centact K4B maintains the circuit to relay K3 thus enabling shutdown of the turbine without reactor trip. Contact K4C provides an annunciatnr alem to the control room indicating that the nomal turbine shutdown bypass is implemented.
When the operator trips the turbine, Relay 86TT energizes closing a contact in series with relay K1 allowing K1 to implement the turbine trip bypass, annunciate that the turbine trip is bypassed and close contact Kid energizing Relay K5. Relay K5 then opens contact K5A denergizing Relay K4 thus automatically removing the nomal turbine shutdown bypass.
3.7 Bypass Remeval Bypasses are automatically removed as described in Paragraphs 3.4, 3.5, and 3.6.
Bypasses can be manually removed at any time by depressing the reset switch.
l 1
i REVISED REQUIREMENTS SUPPLIER REVISIONS i TASE TASK TITLE (CONTINuaT10N SHEET) NO.
PREPARED BY DATE REVIEWED BY DATE g
' "O' REVIEWED BY DATE 04 APPROVED BY DATE SHEET [ OF /!
, P05-21046A-4(12-76)
] gE 'E
' FIELD CHAtGE AUTHORIZATIO 1-cot 1 tit 0JATIC 4 REFERENCE DOCUMEMI iliLE kEi DOCUHihi no.
Reactor Trip on Loss of FWP & Turbine Trip ,/
SHEET 7 0F /0 DESCRIPTION OF CHANGE:
Installation Instruction Turn off power to the ICS cabinets.
Install the two relay inodules in ICS cabinet 2 row 7 positions 3 and 4.
Install the bypass and reset switches. The suggested installation location is I on the blank cover located in cabinet 2 row 7 position 5.
Utilizing a wire wrap tool and 22 AWG solid strand wire, connect the relays, switches and power per the attached two sketches. Power connection to be the
+ 24Vdc bus within the cabinet s
REVISED REQUIREMENTS SUPPLIER REV1580M5 L TASE TASK TITLE (CONTINUATION SHEET) NO.
PREPARED 8Y DATE REVIEWED 8Y DATE g) ygg REVIEWED BT DATE 04 APPROVED BY DATE SHEET 0F f
P03 210491.v(l!.F6)
FIEL'DCHgNGEAUTH;RIZATION.CONTItcJATION g( ,
it L[ffLENCE DOCUMLMI TITLE REF 00CUMLmi no.
fQ: p fg **T'Als Q d L O 54 Q F [w f* Of. 7"JAA/dd TAof f DESCRIPT10N OF Cit ANGE:
ec -
9 %
Mrly
_T .
l f~ l0 CLOS & ON CLOS 2 OM CLo$G OM ranso w upw .M P W raie ggy pjyp _f_f__. _
AFWPT j~ g ~j
} l l / --
y
=
/4 /W /4 gg J.
ervPT z _
f~
e4 86 BG ,0/
7, 1
Anwer spwpr -
TT , ,, 7c 3 2^7-2 ,2-2-7 2-7-8 7g,p 3
BRUPT L.0GIC
~~
//
. t l
86 -
N \
l?
~
~
.' 4 rr \
SE .l.
/0 8 S_' _ s 8fWW R"
[ '7~ l}
^
66 l. /J 8!:.
TT f ExsSTING XCS HbWW AFWPT T ILI
= .
l Pedi:E3 R E Q t;l a t a E n : t SUP/ LIER 4Etlil0NS 'A"' IA** * 'L (C0hTINUAfl0N $HEET) No.
PREPARED BY DATE R(VIEWED BY DATE gg lCS REVi[WED BY DATE 04 .
APPROVED BY DATE L .
SHIET OF /
PDS-21048A-4(12 76)
FIELD CHANGE AUTHORIZATION-CONTINUATION
{ ((TE REFEKENCE DOCUMENT TITLE REF DOCUMENT NO.
[c"4 < 70A 74 # dP4/ dosa pr: /b/ iPX 7~<//3/^/c" TM'8 5hEET b DF /0 DESCRIPil0M OF CHANGE:
7, ptgy 7
+24 V DC Auuuuconvolt 2 Reser *TUR%INf=
6 ,_ q e 2.5" p o to y o /o Snut DowN 3 -
t 8C. '
e BG B Yt>A S S s" f.
~
~us , T '
hTwi7"9 _'.~erwer utnerenseure.v*
t>26 "o */ 4>9 ,, y, y SVPA%S 22. O gf 4 8 0 22. '
28 -
7 -
Ib :: CD :- % == s 'o 2f a og g/3 o 9 w o W kra 4 5 og x 4 84 4 7 ; , =
g, .23 o
26 M48 d N88 W -O TT [.
US il2 o 29 -
y to o , /3 o y o3 N 4 : 8.h ,:. -- "Eb 2 -f I-Y-Y s N gg o Q g.j o % 3h 3 y
13
; ,I3o
? . 4 '
y .r g3 4 eE N j' G 8/
? *II<t SNT -r-
> d 4 I4 0
%\ sf I TRs PS
- ro l\ l-4. y cRO PS (
l?/k , , ,
f ~ s f --
3 ? t h / h/ K y ? #~NJ -
N/ N/ \y'/ Nk V N 70 7
CoM R T j,g y
- TO PLAUT*
,28 l'4I O #v to AununCIATOR
?
To PLAur '
$ N , ANNU Atc IATOR ? :: koc 8 ICS TRIP Lokc ~fa c fg(p" gyp"g*s"ggy - [ 5 MS NSn! H bIx!G 2S r
f ,,
[ G
~
iTcon n tAJDd'D LocA To o A.I of 81P/1SS /1stD Risir 5- 4src rt CS.
REVISED REQUIREMENTS SUPPLIER REVISIONS TASK TASX TITLE (CONTINUATION SHEET) l NO.
PREPARED BY DATE REVIEWED BY DATE gl 1(b REVIEWED SY FCA NO.
DATE l 04-APPROVED BY DATE O'
SHEET 0F / U
5 . , e . (Mf.YUWUIR95TTTY.' ,
F IEL D d .V:':EAUiVrIZATICt'-CbTINUMIC
$ $$["
kEF DOCUMEm! no.
REFEAEWCE DOCU"inI lifLE Reactor Trip on LE,ss of F"P or Turbine Trip SHEET 7 0F /0 Ol3CRIPTt0M OF CHANGE: CHECMOJT PROCEDUP.E t;0TE: READ A10 STUDY THIS PROCEC'JRE COMPLETELY BEFORE STARTIrlG THE 1.0 Purpose The purpose of this procedure is to checkout the ICS turbine trip logic once installation has been completed.
2.0 Initial Condition A. The !i55 is in shutdown B. The control rod drive system is in a tripped state.
C. The ICS is operaticnal and the plant status is so that power to the ICS can be interrupted.
D. SHUtiT trip power is present in the control rod drive breaker cabinets.
3.0 Recuired Eauicment A. A.C. voltmeter capable of reading 125 VAC B. Hand Tools C. Jumper Leads 4.0 Checkout procedure In all steps where wiring is removed or reinstalled or jumpers are installed first remove power from the ICS. When measurements are called for reapply power to the ICS. Remove the module containina K4 and K5 and do not install until directed.
A. Remove Power - Disconnect field contact wiring For turbine trip input /-( "/ / T/ /6 , main feed-water A trip input / / /3# // ,and main feedwater B input / / /4-/ /6 . l B. Power Up - Verify that the ICS trip logic is in hn untripped state. f Measure for the presence of line voltage across both K3 trip contacts.
(If this voltage is not present check for the presence of shunt trip power at the CRD breakers.
SUPPLIER REVISIONS i
TASK TASE TITLE REvl3E0 REQUIREMENTS No.
(CONTINUATION SHEET)
PREPARED BY DATE REVIEWED By DATE gj {c3 FCA NO.
REvlEwED BY DATE 04 APPROVED BY DATE SHEET b' 0F I
. . . vw-wwwu-wpar-vtnF----
FICLQ CHAtlGE AUTFDTIIZATICN-CO.!TINUATIO?4
@6Q'l REFEREASE DOCUMEDT VITLE :REF 20CUNimi no.
Reactor Trip on Loss of RIP or Turbine Trip G SHEET OF /o OtSctiPtion 0F CnANGE: .
C. Remove Power - Install jumpers across the terminals for turbine trip input. (See A above).
D. Power Up - Verify that the ICS trip logic is in a tripped state.
Measure for the absence of line voltage across both K3 trip contacts.
E. Check the turbine trip bypass - Operate the bypass switch, flote that the turbine trip bypass annunciator in the control room is indicating a turbine trip bypass.
F. Check that the turbine trip is bypassed - Measure for the presence of line voltage across both K3 trip contacts.
Check the bypass reset - Operate the reset switch. Measure for the
~
G.
absence of line voltage across the K3 trip contacts. Check that the turbine trip's bypassed annunciator has reset.
H. Remove Power - Remove the jumper installed in C above. Install the ,
jumper across terminals for feedwater pump A trip - Step A above. j I. Check that a single feedwater pump trip does not produce a trip out-put. Measure for the presence of line voltage across both K3 trip contacts.
J. Check that the feedwater pump trip's bypass will not respond with one pump tripped. Operate the bypass pushbutton. There should be no response from the plant annunciator indicating a main feedwater pump trip's bypass. Check that line voltage is still present across both K3 trip contacts.
K. Remove Power - Remove the jumper installed in step H. Install the jumper across the terminals for feedwater pump B - step A above.
L. Power Up - Repeat steps I and J.
M. Remove Power - Reinstall a jumper as in step H. Leave the jumper installed in step K in-place.
RtvisEO REgulREMENTS SUPPLIER REvtSl0MS h TASK TASK TITLE (CONTINUATION SHEET) R0.
PREPARED BY DATE REVIEWED SY DATE 21 ICS l REVIEWE0 BY DATE 04 APPROVED BY DATE -
SHEET OF l
_.... - .. .- ~ . . ._
, - - - - - . -- r w. o-- -
~
FIELO ,CMt ZE t.UT' r .CT!IZl,TD:-CC;Dut TE:4 ',,
L [,[ ' '
EEFLREMCL DOCU4Lai ilTLE klf LLCudia! no.
Reactor Trip on Loss or FW" or Turbine Trip T sntti or R DE50RIPfl0N OF CNAhCE: l 1
N. Power Up - Ch'eck that with both main feedwater pumps trioped the 1 ICS trip logic outputs a trip. f;easure for the absence of line voltage across both K3 trip contacts. 1 1
Check that with both main feedwater pumps tripped the feedwater trip can be bypassed. Operate the bypass switch, f;ote'that the plant annunciator alarms a main feedwater trip's bypassed state.
. O. Check that the main feedwater pump trip is bypassed. fteasure for
. : the presence of line voltage on both r,3 trip contacts.
P. Check that the bypass reset is operational. Annunciator no longer indicates a main feedwster pump trip bypassed. fleasure for tne absence of line voltage across both K3 trip contacts.
Q. Remove Power - Remove all jumpers.
R. Power Up - Reset both CRD breakers.
S. ' Check trip transmission - Use a test lead to momentarily short the main turbine trip input teminals - See A above. Check the CRD breakers both should be tripped. f!DTE: It may be necessary to place the NI/RPS in shutdown bypass to complete steps R and S.
REvlsED REQUIREMENis SUPPLIER REVislDNS I TAst TA5x TITLE (CONTINUAflON SHEET) NO.
PREPARED BY DATE REVIEWED St DATE gj Ic3
. REyltwtC BT DATE 1
Ou.
APPROVED BY DATE SHEET OF /Y
a * * *
, PDS-210484-4(12-76)
~ ~ '
' FIELD CHAKE AUTHORIZATIOr:-CONTItUATION t Q 1E REFERENCE DCCUHipi TiiLE p RET 00COMENT no.
Reactor Trip on Loss of FWP & Turbine Trip SMEET /0 0F /0 DESCRIPfl0N OF CHANGE
- T. This step prepares the equipment for the remaining steps.
- 1. Remove power.
- 2. Install the module containing K4 and K5.
- 3. Note that there are no jumpers across the trip input terminals-Step A.
- 4. Clip the voltmeter across one set of the K3 trip contacts.
Caution shunt trip power is present at these terminals.
U. Power up - check that the ICS trip logic is untripped. Presence of line voltage indication on the voltmeter.
V. Press the bypass switch.
W. Check that the bypass is in effect. Hold a jumper across the turbine trip input terminals - Step A - and note that a trip is not generated - line voltage indication on the voltmeter.
Do Not Remove The Jumoer.
X. Check that the bypass will remove automatically. Open the jumper and then reconnect it. Check tabt line voltage is not indicated on the voltmeter.
Y. Remove power - Reinstall the wiring for turbine and main feedwater pump trip's that were removed in Step A.
Z. This completes the check out procedure.
REVISED REQUIREWENTS SUPPLIER REvlSIONS TA$r TA$a TITLE (CONTINUATION SHEET) P0.
PREPARED BY DATE REVIEWED By DATE REVIEWED BY DATE l
04-APPROVED BY DATE -
I SHEET // OF /#
PD3021048A-4(12-76)
FIELD CHANGE AUTHORIZATION-CONTINUATION h E*h(('E o
REFERinCE DOCUMENT TliLE REf DOCUMENT NO.
A {~ A C, 70 R T/R/h 04/ l 03 3 W N? 0*1 Tl//( d , 7/( / /0 SHEET / OF J DESCRIPil0N OF Cf.ANGE:
Inst'allation Instructions
- 1. Remove all power from the AC breaker cabinet before starting.
- 2. Locate TB1 on the source interruption device of AC breaker cabinet A and 5.
- 3. Add a new cable between the source interruption device A of AC breaker cabinet A and the ICS.
- 4. Add a new cable between the source interruption device B of AC breaker cabinet B and the ICS.
- 5. The termination of the cable on each source interruption device shall be as shown on sheets 2 and 3.
6.
The termination of the cable on the ICS shall be as shown on the sheets for Task 21 (ICS).
*/ . The cables should be two conductor, 14 ga AWG.
l l
REvlSED RE0Vi*fHENTS
- SUPPLIER REvi$l0NS i TASK T !. S K TITLE l (CONTINUAil0N SHEET) NO.
l PREPARED BY DATE REVIEWED BY DATE g
.) W & Ylkl}y kW Yb . 'll&O,*
FEA MC.
REVIEWED BY DATE 04 A P,P R,9V E D 8 j DATE 0
*h c/ % ik{hf SHEET / . OF
PDS-21048A-4(l!.7G)
@ E '8'E D I T E FIELD CHANGE AUTHORIZATION-CONTItfJATION O acau't ,
REFEREhCE DOCUMENT TITLE qREF 00CUNENT NO. l A E A c r o tt. T /t P Ou t 012 Of kWP or 7' v4 0 7*4 t B SMEET 8 0F3 DESCRIPTION OF CHANGE:
Td/P G R E A l( E x 3 ADD NEW vABLE l7 61 n 7 E X ! STING COST E X ISTING CABLE 31 .! GABLE .
- ---of g o- - - - '
SOU RCE I I NTE RRUPT 10N l 1 l OEVICE
. I I
l 1
REvlSED REQUIREMENTS SUPPL!ER REvlS10MS tl TASu TASp TITLE '
(CONT 1NUAT10N SHEET) MD.
PREPARED BY DATE REVIEWED BY DATE 43 Cggg3 FCA MO.
PEVIEWED BY DATE 04-I APPROVED BY DATE SHEET / OF /
5 l PDS-210484-4(12-76) l
]y"8'il FIELD CHANGE AUTHORIZATION-CONTINUATION RtFERENCE DOCUMEhi TITLE kEF DOCUMENT no.
A G /q c y p fL TA IP O AJ f. 93 Z O /? A W OP 78/40. 7 48.* SHEET $ OF 3 DESCRIPfl0N OF CHANGE:
YRJP 2 R & /9't< E n A i
l ADD NEW CABLE I .
--04 y ---
EXISTING cusT EXISTING !
CABLE 31 CABLE )
-OC go_---
SOU RCE l 1 NTE ARUPT t0N DEVICE I
PEVISED REQUIREMENTS SUPPLIER REVISIONS I TA$u TASK TITLE (CONTIMcAT10N SHEET) No.
PREPARED BY DATE REVIEWED BY DATE 43 Cgggg AEVIEWED BY DATE 0u.
APPROVED BY DATE SHEET /[ OF /Y
- l w}}