ML20211L331

From kanterella
Jump to navigation Jump to search
Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3
ML20211L331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/03/1999
From: Wiens L
NRC (Affiliation Not Assigned)
To: Peterson S
NRC (Affiliation Not Assigned)
References
NUDOCS 9909080208
Download: ML20211L331 (4)


Text

MEMORANDUM TO: Sh:ri R. Pat:rson, Chl:f, S:ction 2 Scptember 3, 1999

, Project Director:1311

.

  • Division of Lic:nsing Proj:ct Man:g m:nt, NRR

,h l FROM: Leonard A. Wiens, Senior Project Manager, Section 2 / Original sigini by:

Project Directorate ll Division of Licensing Project Management, NRR

SUBJECT:

FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION CONCERNING CRYSTAL RIVER UNIT 3 LARGE BORE PIPING RE-ANALYSIS PROGRAM DATE & TIME: Monday, September 27,1999 1:00 p.m. - 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Md. 20852 Room O-1-F5 PURPOSE: Florida Power Copration (FPC) will present a modified program to re-verify the design ccca compliance of large bore safety related piping at '

Crystal River Unit 3. The revised program will focus on piping segments that are affected by the identified design basis concerns.

  • PARTICIPANTS: NRC/NRR FPC E. Imbro D. Roderick K. Manoly S. Powel!

S. Peterson H. Oates A. Lee D. Jopling l Y. Li J. Martin L. Wiens Docket No. 50-302 cc: See next page 8 f

l CONTACT: L. Wiens, NRR (301) 415-1495 l0

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal g l

Reaister 48340,9/20/94. Members of the public who wish to attend should contact Len Wiens /

at (301) 415-1495. Q(D DOCUMENT NAME: G:\ CRYSTAL \MTGLBP.WPD l To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE PM:PDil-3o lE LA:PDil-3 l- SC:PDil-R-cp l NAME LWiens df8M BClayton Me / SPetersoh' '

DATE 09$/99 094/99 090/99 09/ /99 09/ /99 Official Record Copy AR 9909080208 990903 PDR ADOCK 05000302 P PDR

god #"0%g

[q, 854 UNITED STATLS jo

'j t'

NUCLEAR REGULATORY COMMISSION WASHINGTC N, D.C. 2055M001

% . . . . . p' Sept a ber 3, 1999 MEMORANDUM TO: Sheri R. Peterson, Chief, Section 2 Project Directorate il -

Division of Licensing Project Management, NRR FROM: Leonard A. Wiens, Senior Project Manager, Project Directorate 11 0 9 Section Division of Licensing Project Management, NRR

SUBJECT:

FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION CONCERNING CRYSTAL RIVER UNIT 3 LARGE BORE PIPING RE-ANALYSIS PROGRAM DATE & TIME: Monday, September 27,1999 1:00 p.m. - 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Md. 20852 Room O-1-F5 PURPOSE: Florida Power Corporation (FPC) will present a modified program to re-verify the design code compliance of large bore safety related piping at Crystal River Unit 3. The revised program will focus on piping segments that are affected by the identified design basis concerns.

' PARTICIPANT 3: NRC/NRR FPC E. Imbro D. Roderick K. Manoly S. Powell S. Peterson H. Oates A. Lee D. Jopling Y.Li J. Martin L. Wiens Docket No. 50-302 cc: See next page CONTACT: L. Wiens, NRR (301)415-1495

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94. Members of the public who wish to attend should contact Len Wiens at (301) 415-1495.

. ,- m:  !

Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 GENERATING PLANT cc:

Mr. John Paul'Cowan, Vice President Chairman Nuclear Operations (NA18) Board of County Commissioners ATTN: Manager Nuclear Licensing - Citrus County Florida Power Corporation 110 North Apopka Avenue Crystal River Energy Complex invemess Florida 34450-4245 15760 W. Power Line Street

~ Crystal River, Florida 34428-6708- Ms. Sherry L. Bemhoft, Director Nuclear Regulatory Affairs (NA2H)

Mr. R. Alexander Glenn Florida Power Corporation Corporate Counsel (MAC-BT15A) Crystal River Energy Complex Florida Power Corporation' 15760 W. Power Line Street

- P.O. Box 14042 Crystal River, Florida 34428-6708 St. Petersburg, Florida 33733-4042 Senior Resident inspector a Mr. Charles G. Pardee, Director Crystal River Unit 3 J Nuclear Piant Operations (PA4A) U.S. Nuclear Regulatory Commission Florida Power Corporation 6745 N. Tallahassee Road Crystal River Energy Complex Crystal River, Florida 34428 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Gregory H. Halnon Director, Quality Programs (SA2C)

Mr. Michael A. Schoppman _ Florida Power Corporation Framatome Technologies Inc. Crystal River Energy Complex 1700 Rockville Pike, Suite 525 15760 W. Power Line Street Rockville, Maryland 20852 Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control .

' 2020 Capital Circle, SE, Bin #C21 >

Tallahassee, Florida 32399-1741 Attomey General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness

- Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 I

I E ..

< .. Meetina Notice Dated:

OfSTRIBUTION'

- K-Afdil J. Zwolinski\S. black H. Berkow E. Imbro S. Peterson L. Wiens B. Clayton T. Martin (e-rnail to SLM3)

OPA (e-mail to OPA).

L. Wert, Region 11 M. Satorius (MAS)

K. Clark (KMC2), Region ll K. Manoly A. Lee Y. Li PMNS (Meeting Announcement Coordinator)

HARD COPY Cocket Fh P PUBLIC Crystal r/f OGC ACRS Receptionist (OWFN and TWFN) cc: Licensee & Service List l

(

{

L