ML20216J524

From kanterella
Jump to navigation Jump to search
Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis
ML20216J524
Person / Time
Site: Crystal River 
Issue date: 04/15/1998
From: Wiens L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9804210405
Download: ML20216J524 (5)


Text

__

April 15,1998 MEMORANDUM TO: Frederick J. Hebdon, Director Project Directorate 11-3 Division of Reactor Projects - t/11-

- FROM:

Leonard A. Wiens, Senior Project Managel(Origiral signed by K. Jabbour)

Project Directorate ll-3 Division of Reactor Projects - 1/ll

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CONCERNING CRYSTAL RIVER UNIT 3 CONTROL COMPLEX HABITABILITY ISSUES DATE & TIME:

Wednesday April 29,1998 9:00 a.m. - 1:00 p.m.

LOCATION:

Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Md Room O-5-B6 PURPOSE:

To discuss issues related to a revised control complex habitability analysis, including assumptions used in the analysis. Plans for technical specification changes and future plans under consideration will also be discussed. An agenda for this meeting is attached.

  • PARTICIPANTS:

HRQ ffG C. Miller J. Baumstark F. Hebdon S. Bemhoft R. Emch S. - Powell -

J. Lyons et. al.

S. Lavie C. Liang L. Wiens et. al.'

Docket No. 50-302

Enclosure:

Meeting agenda '

4 CONTACT: L. Wiens, NRR (301) 415-1495

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Register

'_48340,9/20/94. Members of the public who wish to attend should contact Len Wiens at (301) 415-1495.

g

}

DOCUMENT NAME: G:\\ CRYSTAL \\MNOTICE.FUE To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No cooy 0FFICE PM:PDll 3

_/lE LA:PDII 3 l

D PDII 3 -

,g l l

18AIE LWiens:cw Mi sCleyton 4,4 f 3 Filehdon V 't DATE 04/ / f /96 f*/

04//f /96 04/ /f /96 - ~7 8 '

04/ /96 04/ /98 Official Record Copy

.n

,69 9004210405 980415 i

F O P C" PDR ADOCK 05000302 l

A n O L Q d(~* 2 j @m p y

" ~ ' -

g l

P Pm g

p.

p3 ftf 2p k

g g

UNITED STATES g

,j NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20616 0001

..... p#

April 15,1998 MEMORANDUM TO: Frederick J. Hebdon, Director Project Directorate 11-3 Division of Reactor Projects - 1/II FROM:

Leonard A. Wiens, Senior Project Manager Project Directorate 11-3

/'

Division of Reactor Projects - 1/II

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CONCERNING CRYSTAL RIVER UNIT 3 CONTROL COMPLEX HABITABILITY ISSUES DATE & TIME:

Wednesday April 29,1998 9:00 a.m. - 1:00 p.m.

LOCATION:

Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Md Room 0-5-B6 PURPOSE:

To discuss issues related to a revised control complex habitability analysis, including assumptions used in the analysis. Plans for technical specification changes and future plans under consideration will also be discussed. An agenda for this meeting is attached.

  • PARTICIPANTS:

NflR EP_C C. Miller J. Baumstark F. Hebdon S. Bemhoft R. Emch S. Powell J. Lyons et. al.

S. Lavie C. Liang L. Wiens et. al.

Docket No. 50-302

Enclosure:

Meeting agenda CONTACT: L. Wiens, NRR (301) 415-1495

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Register 48340,9/20/94. Members of the public who wish to attend should contact Len Wiens at (301) 415-1495.

Q Mr. Roy A. Anderson CRYSTAL RIVER UNIT NO. 3

- Florida Power Corporation cc:

Mr. R. Alexander Glenn Mr. Robert E. Grazio, Director Corporate Counsel Nuclear Regulatory A# airs (SA2A)

Florida Power Corporation Florida Power Corporation MAC-A5A '

Crystal River Energy Complex P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Charles G. Pardee, Director Senior Resident inspector i

Nuclear Plant Operations (NA2C)

Crystal River Unit 3

')

Florida Power Corporation U.S. Nuclear Regulatory Commission Crystal River Energy Complex 6745 N. Tallahassee Road 15760 W. Power Line Street Crystal River, Florida 34428 Crystal River, Florida 34428-6708 Mr. John P. Cowan, Vice President Mr. Robert B. Borsum Nuclear Operations (NA2E)

Framatome Technologies Inc.

Florida Power Corporation 1700 Rockville Pike, Suite 525 Crystal River Energy Complex Rockville, Maryland 20852 15760 W. Power Line Street i

Crystal River, Florida 34428-6708 Mr. Bill Passetti O# ice of Radiation Control Mr. Gregory H. Halnon Department of Heahh and Acting Director, Quality Programs (SA2C)

Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd.

Crystal River Energy Complex Tallahassee, Florida 32399-0700 15760 W. Power Line Street Crystal River, Florida 34428-6708 Attorney General Department of Legal A# airs Regional Administrator, Region ll The Capitol U.S. Nuclear Regulatory Commission Tallahassee, Florida 32304 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415 Mr. Joe Myers, Director Division of Emergency Preparedness Mr. Kerry Landis Department of Community Affairs U.S. Nuclear Regulatory Commission 2740 Centerview Drive 61 Forsyth Street, SW., Suite 23T85 Tallahassee, Florida 32399-2100 Atlanta, GA 30303-3415 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue lverness, Florida 34450-4245

\\

I iosA.

Meeting Agenda Crystal River Unit 3 Control Room Habitability Steam Generator Tube Rupture i

e Scenario Iodine Spiking Condenser Partition Factor Single Failure Loss Of Offsite Power

. Contrast with Standard Review Plan Requirements.

Use of Non-Safety Related components Results i

Letdown Line Rupture e

Scenario Iodine Spiking Results Maximum Hypothetical Accident e

w/ Loss Of Offsite Power Scenario Changes Results w/o Loss Of Offsite Power Scenario Changes Results H2 Purge Treatment of Dose Contribution Habitability Report e

i Table of Contents Toxic Gas Threat Eliminated Plan to Submit Calculations for Information Only

. Tech Spec Changes Currently Submitted Periodic Leak Testing Revised Charcoal Testing Revised Ventilation Flow Rates Committed to Submit Auxiliary Building Ventilation System Filter Testing Under Consideration for Future Reduction in Reactor Coolant Activity Reactor Building Purge Filten i

Allowance for Habitability Envelope Breaches ENCLOSURE

t' April 15,1998 Meetina Notice Dated:

Distribution:

E-Mail S. Collins /F. Miraglia (SJC1/FJM)

B. Boger (A)(BAB2)

J. Zwolinski(A)

F. Hebdon L. Wiens B. Clayton T. Martin (e-mail to SLM3)

OPA (e-mail to OPA)

L. Pisco, Region ll M. Tschiltz (MDT)

K. Clark (KMC2), Region 11 C. Miller R. Emch J. Lyons S. Lavie C. Liang PMNS (Meeting Announcement Coordinator)

Hard Cooy Docket File l

PUBLIC Crystal r/f OGC ACRS l

Receptionist (OWFN and TWFN) cc: Licensee & Service List l

l i