ML20217Q555

From kanterella
Jump to navigation Jump to search
Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3
ML20217Q555
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1998
From: Wiens L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9805080186
Download: ML20217Q555 (2)


Text

-

.(

May 1, 1998 t

j l-1 MEMORANDUM TO:' Frederick J. fiebdon, Director l

. Project Directorate ll-3 t

' Division of Reactor Projects 1/Il FROM:

Leonard A. Wiens, Senior Project' Manager (Original signed by)

Project Directorate ll-3

. Division of Reactor Projects 1/11 r

SUBJECT:

OPENING OF TA'SK AUTHORIZATION CONTROL NUMBER (TAC NO.)

FOR EFFORT ASSOCIATED WITH SEA TURTLE ISSUES AT CRYSTAL RIVER UNIT 3 Due to the increasing level of effort necessary to address the issues relating to sea turtle mortalities in the Crystal Riverintake structure, it has bect 9e necessary to open a plant specific TAC No. This memorandum serves to document the opening date and purpose of the TAC.

Docket No. 50-302 j

l DISTRIBUTION

, Docket File;,

l PUBLIC Crystal River r/f

)

BClayton i

LWiens OFFICE PDil-3/PM,

PDil-3/LA, /

PDil-3/D i)

BC h NAME LWiens:c FHEBD DATE 5/ / /98 b / /98 Y/ I /98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\ CRYSTAL \\TURT. TAC 1

PEC HLE ENTES C6PY o\\

O

\\

9905000186 990501 j

PDR ADOCK 05000302

)

o PDR j

j j

s

1 ro

,?

go ntou y-

-t UNITED STATES NUCLEAR REGULATORY COMMISSION s

o, WASHINGTON, D.C. N1 o

'*,...../

May 1, 1998 s

i MEMORANDUM TO: Frederick J Hebdon, Director.

Project Directerate Il-3 Division of Reactor Projects 1/ll l

FROM:

Leonard A. Wiens, Senior Project Manager.

_l

- Project Directorate Il f Division of Reactor Projects 1/11 1

SUBJECT:

OPENING OF TASK AUTHORIZATION CONTROL NUMBER (TAC NO.)

FOR EFFORT ASSOCIATED WITH SEA TURTLE ISSUES AT CRYSTAL RIVER UNIT 3 Due to the increasing level of effort necessary to address the issues relating to sea turtle mortalities in the Crystal River intake structure, it has become necessary to open a plant specific

. TAC No. This memorandum serves to document the opening date and purpose of the TAC.

Docket No 50-302

)

\\

As I

i l

i