L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)

From kanterella
Revision as of 22:01, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)
ML051310180
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/02/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-101
Download: ML051310180 (15)


Text

Florida Power& Light Company. 6501 S.Ocean Drive, Jensen Beach, FL 34957 May 2, 2005 FPL L-2005-1 01 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15)

Owner's Activity Report (OAR-1)

Enclosed is the St. Lucie Unit 2 Third Interval, First Period, First Outage (SL2-15),

ASME Section Xl Form OAR-1, Owners Activity Report. The Outage SL2-15 ended on February 15, 2005. The Form OAR-1, Owner's Activity Report, implements Code Case N-532-1. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage.

The enclosed Form OAR-1 is for refueling outage SL2-15. Should there be any questions, please contact us.

Very truly yours, WJ/GRM Enclosure 1Iv an FPL Group company

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 1 Form OAR-1 Owner's Activity Report Report NumberiSI-PSL-2-2005 Owner. Florida Power and Light Company P.O. Box 529100 Miami, Florda 33152 Plant: St. Lucie Nuclear Power Plant Unit 2 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8. 1983 Refueling Outage No.: SI2-15 Current Inspection Interval:Third Current Inspection Period:First Edition and Addenda of Section Xl applicable to the Inspection plan: 1998 with Addenda through 2000, and for section IWE, 1992 Edition with addenda through 1992 (IWL not applicable to St. Lucie Unit 2).

Date and Revision of Inspection plan: August 8, 2003, Rev. 0 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the Inspection plan: Same CERTIFICATE OF CONFORMANCE I certify that the statements made In this Owners Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No.: N/A Expiration Date: N/A Signed > @ "',,' - Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Florida and employed by HSBCT of Hartford Connecticut have Inspected the items described in this Owners Activity Report, during the period August 8, 2003 to Feb. Fzy 1 S. "05 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.

  • MAfcod *7. +/-oor. cs 341.05 By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations, tests, repairs, replacements, evaluations, and corrective measures described In this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.

__ __ __Commissions j# 477 4A,C. V, 1)

Inspector's Signature National Board.

State, Province, and Endorsements Date 3-17-05

°;N)0 aa C r~

0 C TABLE 1 (Post 2005 Outage)

THIRD INSPECTION INTERVAL-FIRST PERIOD ABSTRACT OF EXAMINATIONS AND TESTS 0

M 1 =

0mnc&

CO Total Total Total Examinations Cn (O Examination Examinations Examinations Examinations Cramit to Remarks Category/Item Required for Credited for Credited (%) Date for the CD the Intorval this period for the period Intervalthe B-A 26 0

0) -

0%Xe 0% CC)

B1.11 2 Deferral Permissible CD -

- N .- _

B1.12 9 Deferral Permissible B1.21 3 Deferral Permissible B1.22 10 Deferral Pemmissible B1.30 1 Code Case N-623 Applied. Deferral Permissible 81.40 1 Code Case N-623 Applied, Deferral Permissible B-B 12 0 0% 0%

B2.11 2 _

B2.12 2 B2.31 5 B2.32 2 82.40 1 _

B-D 36 0 0% 0%/

B3.90 6 B3.100 6 B3.110 6 B3.120 6 B3.130 6 B3.140 6 _ _ _

B-F RR#2 has been submitted to Implement a rIsk informed inspection program. The B-F examination category Iems are Included In the Category R-A population B-G-1 13 lI-G-I130I0I0%disassembled)

O l / l 0% lTotal Includes item 86.190 (only required If

-t i- scn o Cr TABLE 1 (Post 2005 Outage) .L Z CD.

THIRD INSPECTION INTERVAL-FIRST PERIOD °0 O C:

ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total 0'0 Examination Examinations Examinations Examinations Examinations Category/Item Required for Credited for Credited (%-) Date for the the Interval this period for the period Inteorval FPL mainlalns 3 sets of RPV studs, nuts, and washers D.) ' -

8610 that are rotated CD 'I

.p 3 performed of all between the 2the 3 sets within units. Examinations Interval, Deferral are - A)-I .

Pemmissible FPL maintains 3 sets of RPV studs, nuts, and washers B6.30 3that are rotated between the 2 units. Examinations are performed of all 3 sets within the Interval. Deferral Permissible B6.40 1 Deferral Permissible FPL maintaIns 3 sets of RPV studs, nuts, and washers B6.50 3 that are rotated between the 2 unIts. Examinations are performed of all 3 sets within the interval, Deferral Permissible B6.180 1 Deferral Permissible B6.190 1 Examinations required only If disassembled, Deferral B6.190_ 1 Permissible B6.200 1 Deferral Permissible B-G-2 39 9 23% 23%

B7.20 1 . _

837.30 8_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

B7.50 137_

BJ _ RR#2 has been submitted to Implement a rsk informed inspection program. The BJ examination category Items are included In the Category R population B-K 5 0 0% 0%

810.10 2 _

810.20 1 B10.30 2

M0 r-N~

° CD TABLE 1 (Post 2005 Outage)

THIRD INSPECTION INTERVAL-FIRST PERIOD o o r=3

-A .

ABSTRACT OF EXAMINATIONS AND TESTS fl 0 C oo 0 r&

Total Total Total Exmntiotal Examination Examinations Examinations Examinations Exinatons CategoryAtem Required for Credited for Credited (%) CrDate for the -

the Interval this period for the perDod Interval CD

.0 B-L-1 2 0 0% 0% SD -

(0 -'

012.10 2 Deferral Permissible CD., - .

B-L-2 1 0 0%XO 0% .06 B12.20 1 Examination is required onty Ifdisassembled.

B-M-2 4 0 0%Y 0%

12.50 4vave B12.50disassembled Ineachfor group requires examinaton when malntenance, Deferral Permissible B-N-1 24 0 0% 0%

B13.10 24 - _ Each Rem (8) must be examined each period B-N-2 22 0 0% 0%

813.50 21 Deferal Permissible B13.60 1 Deferral Permissible B-N-3 013.70 6 0 0% 0% Deferral Permissible B-P System leakage tests are performed each outage (IWB-5220) In accordance with plant procedures.

B-0 Steam Generator tubing is examined In accordance with Plant Technical Specifications.

C-A 9 2 22% 22%

01.10 5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

01.20 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

C1.30 3 C-B 8 4_____each 50% 50% C-B total does not Include C2.33 Items that are required

_____ -period C2.21 2 C2.22 2 C2.31 4 C2.33 6- 0 0% 0% VT examinations required each period

r9 '5 r-TABLE 1 (Post 2005 Outage) ° )0 r THIRD INSPECTION INTERVAL-FIRST PERIOD ABSTRACT OF EXAMINATIONS AND TESTS '& Za 00 C 0 .c Eaiain Total Total Total Exmntota s Ul (0 Examinatin Examinations Examinations Examinations exitiosto Remarks Category/item Required for Credited for Credited (%) Date Re o the Interval this period for the period nterval o° co en C-C 9 3 33% 33%

C3.10 1 CD C320 6 C3.30 2 CD-'

C-F-1 106 1 1% 1%

C5.11 31 _ l C5.21 39 C5.30 36 C5.41 4 C-F-2 28 12 43% 43% Less than 28 welds would be required it 7.5% criteria Is followed, FPL raised the total count to 28 per note 2.

C5.51 42 C5.81 5 C-H System pressure tests are performed In accordance with plant procedures. Ouantificatlon of the number of tests is not practical.

D-A 20 6 30% 30%

D1.10 12 131.206 D1.30 2 D-B System pressure tests are performed In accordance with plant procedures. Quantification of the number of tests is not practical.

(WE) E-A 4 1 25% 5QV/o Currently In the 2r4 period for IWE, 1000/o General Exam

_ _ _ required each period RR# IWE-01, Currently In the 2r4 period for IWE, Includes exam of 113 of moisture barrier, Examination of (IWE) E-D 1 .3 27% 55%8 of the total Items required Hmade accessible (deferral

._ permissible).

(I8E) 3 38% I 6%permissible.RR# IWE-02, Currently In the 2 period for IWE, deferral I8338

r- co N .030r C)

En CD

.&Z CD.

TABLE 1 (Post 2005 Outage)

THIRD INSPECTION INTERVAL-FIRST PERIOD 0 0 Ic' ABSTRACT OF EXAMINATIONS AND TESTS 0 o Total Total Total Total iEnCDCD Examination Examinations Examinations Examinations Examinations -I Category/tem Required for Credited for Credited (%) Credited (%Yto Remarks CD the Interval this period for the period Datorval F-A a),

(0 - -

F1.10 33 11 33% 33%/ (a F1.20 73 10 14% 14%

Ft.30 26 9 35% 35%

F1.40 30 2 7% 7%

'A R-A 2 24 28 _ S _

RR#2 was approved risk Informed February Inspection 23,2005, to Implement a program.

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 7 St Lucle Unit 2 THIRD INSPECTION INTERVAL-FIRST PERIOD 2005 REFUELING OUTAGE INSERVICE INSPECTION REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination I Item Item Flaw Flaw or Relevant Condition Found Category l Number Description Characterization During Scheduled Section Xi I _ (IWA-3300) Examination or Test (Yes or No)

There were no flaws or relevant conditions that required evaluation for continued service.

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 8 TABiE 3 Abstract of Repairs. Replacements, or Corrective Measures Required for Continued Service PSL 2 -3rd Interval. tst Period Code Repair, Flaw or relevent Date Repaidr Class Replacement, Ime5rption condition found Complete Replacement or Correve Work during scheduled Plan Number Measure Description f rkISI exam or test?

2 El Repair CHG PP Replace Pump Cover Studs CHECK IF YES O 12272003 SL2- 02075 21 Replacement 28 due to Galling Interval #3 El Corrective Measure Period #1 3 C3 Repair ICWPP2A Rebuildsparepump CHECKIFYESO 12110/2003 SL2- 03175 Ri Replacement Interval #3 ol CorrectiveInevl3 Measure Period #1 3 0 Repair V21205 Replace ICW PP 2C CHECKIFYESC 1218R003 S12- 03176 21 Replacement Discharge Check Valve O Corrective Interal #3 Measure Period #1 C i3Repair CW-10 CW-10;WLD REP'R FLNG CHECK IF YES E 12/10/2003 SL2- 03177 O Replacement ON ELBOW CR03-3796 El corrective a CorectinInterval #3 Measure Period #1 3 E Repair 2C ICW Replace 2C ICW pump wilh CHECK IF YES El 1t22004 S2- 03178 RI Replacement PP rebuilt spare; refer to SL2-l Corrective 03175 Interval #3 Measure Period #1 B O Repair SS-02-IC REPLGASKETS. BOLTING& CHECKIFYESCl 10/1112004 SL2- 03181 0 Replacement CLEAN CR03-2491 O CorrcliveInterval #3 El Corrective Measure Period #1 2 E Repair CHG PP Replace entire fluid block CHECK IF YES El 12212004 SL2- 03182 RI Replacement 28 assembly Interval 03 El Corrective Measure Period #1 2 0 Repair CHG PP Replace entire fluid block CHECK IF YES E 1/22/2004 SL2- 03183 IO Replacement 2C assembly Interval #3 Corrective Measure Period #1 2 0 Repair CHG PP Replace entire fluid block CHECK IF YES El 12181003 SL2- 03184 01 Replacement 2A assembly Interval #3 El Corrective Measure Period #1 2 El Repair V2324 Replace Safety Relief Valve CHECK IF YES E 3/182004 SL2- 03185 21 Replacement Bellows Interval #3 E Corrective Measure Period #1 3 El Repair SR21196 Removesafetyrelielvalve CHECKIFYES l 2/10/2004 SL2- 04187 01 Replacement and replace with blind flange 0 Corrective Interval #3 MPasure Period #1 Page I of 7

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 9 TABLE 3 Abstract of Repairs. Replacements, or Corrective Measures Required for Continued Service PSL2 - 3rd Interval, 1st Period Code Repair. Flaw or relevent Date Repaidr Class Replacement Descriptlon condition found Complete Replacement orCor ive Item Work during scheduied Plan Number Measure Description ofWr SI exam or test?

3 0 Repair SH21245 Replaaeventvulveon2B CHECKIFYESE] 2/1012004 SL2- 04188 E Replacement CCW Heat Exchanger ICW O Corrective outieL SH21245 Interval #3 Measure Period #1 3 0 Repair SH21241 Replace SH21241 Drain CHECKIFYESE 21102004 SL2- 04189 E2Replacement Valve for CCW Hx 2EInlet Interl #3 O Corrective Measure Period t1 3 0 Repair SS4-1B Replaceboltlngatflanged CHECKIFYESO 2124J2004 SL2- 04190 0 Replacement connection O Corrective Intenval #3 Measure Period t1 B L Repair FE-3332 REPLACE FE FLANGE CHECK IFYES 0 21712005 SL2- 04191 E Replacement STUDS and NUTS. Interval #3 Oi Corrective Measure Period #1 B 0 Repair V3495 RestoreSealWeldonvalve CHECKIFYESO 11252005 SL2- 04192 o ReplacementV49Inevl3 O Corrective Interval #3 Measure Period #1 a E] Repair SE-03-18 SE4O3-laREMOVE/REWELD CHECKIFYESO 0 127/2005 SU- 04193 O Replacement SEAL WELD Intera 03 O Corractive Measure Period #1 C 0 Repair FS-591 FS-591 DRY BORIC ACID CHECK IFYES 0 9t1712004 SL2- 04195 2 Replacement (CR 03-2998) Replaced O Corrective Flange Boiling Interval #3 Measure Period #1 B 0 Repair SS403-2A SS-03-2A FLANGE LEAKS CHECKIFYESE0 9/1312004 SL2- 04200 0] Replacement BA CR03-2525 -Replaced O Corrective Flange Boiting Interval #3 Measure Period 01 2 0 Repair V2335 Replace valve and adjacent CHECK IFYES 0 112512005 Su- 04201 RI Replacement piping by welding Interval 13 O Corrective Measure Period #1 B 0 Repair V8209 REMOVEIOVERHAUL CHECK IFYES O 212005 SU2- 04202 2 Replacement VALVE. REINSTALL VALVE O Coreive USING NEW INLET BOLTING. Interval #3 Measure Period #1 B 0 Repair V8214 REMOVE I OVERHAUL CHECK IFYES 212/2005 Si2- 04203 2] Replacement VALVE. REINSTALL VALVE O Corrective USING NEW INLET BOLTING. Interval #3 Measure Period #1 Page2of7

'S St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 10 TABLE 3 Abstract of Repairsm Replacerents, or Corrective Measures Required for Continued Service PSL 2- 3rd interval. 1st Period Code Repair. Flaw or relevent Date Repair/

Class Reptacement, iem Oesction condi!on found Complete Replacement Measure Description of Work during scheduled Plan Number MeaureISI exam ortest?

B 0 Repair V8215 REMOVE IOVERHAUL CHECK IF YES0 222005 SL2- 04204 0 Replacement VALVE. REINSTALL VALVE E Coms Uve USING NEW INLET BOLTING. Interval #3 Measure Period #1 2 0 Repair Sl-2407- Replace Spring Can support CHECK IF YES 0 216/2005 81.2- 04205 0 Replacement 30W Interl #3 0 Corrective Measure Period #1 A -

A- Repair - V1200 FYP 3604 REtOXEINSTALL CHECK IF YES 0 1126005 SL2- 04206 Ei Replacement SPARELVnterval 3 O Corrective Measure Period #1 A 0 Repair V1201 FYP 3605 VI201 CHECK IF YES0 11262005 S.2- W207 ll Replacement REMOVEtiNSTALL SPARE O Corrective YLV Intrval#3 Measure Perod #1 A 0 Repair V1202 V1202 REMOVE/INSTALL CHECK IF YES 0 1126t2005 SL2- 04208 0 Replacement SPARE VALVE O Corrective Interval #3 Measure Period#1 3 0 Repair SS-21-IA ReplacefiangeboltingIn2A CHECKIFYESO 1211712004 812- 04210 0 Replacement Strainer backwash piping O Corrective Interval 3 Measure Period #1 B 0 Repair V8216 REMOVE IOVERHAUL CHECK IF YES 0 212005 S2- 04211 0 Replacement VALVE. REINSTALLVALVE O CorrectIve USING NEW INLET BOLTING. Interval #3 Measure Period #1 B 0 Repair VB210 REMOVEI OVERHAUL CHECKIFYES 0 2122005 SL2- 04212 0 Replacement VALVE. REINSTALL VALVE O Corrective USING NEW INLET BOLTING. Interval #3 Measure Period #1 C 0 Repair CCWHX Replace ChannelHead Bolting CHECKIFYESO 12115t2004 SU2- 04213 0 Replacement 2A Intervai#3 O Corrective Measure Period #1 B 0 RepaIr V8212 REMOVE IOVERHAUL CHECK IF YES 0 22t2005 S12- 04218 0 Repbacement VALVE. REINSTALL VALVE O Coffectve USING NEW INLET BOLTING. Interval #3 Measure Period #1 B 0 Repair MV-0811A Replace Valve Plug Assembly CHECK IF YES 0 111512005 SL- 04219 E Replacement and Seat Ring o Corrective Interval #3 Measure Period #1 Pae 3of 7

St. Lucie Unit 2 Docket No. 50-389 L-2005-1 01 Enclosure Page 11 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL 2 .3rd Interval 1st Period Code Repalr. Flaw or relevant Date Repair/

Clssrsprrctmere. Item Descripton1 condition found Complete Replacement oreCorectoveof Work during scheduled Plan Number Measure Descrption ISI exam or teat?

B 0 Repair CCW Modify CCW Pipe supports to CHECK IFYES O 2R12005 SL2- 04220 21 Replacement PIPE SUPPORT meet GL96.06 requIrements:

CC-2080-14. CC-2097-29, CC- Interval #3 CorrectIve S 2097-60 Measure Period S1 2 0 Repelr SS3-3-18 Repce deteriorated flange CHECK IF YES 114/42DO4 St2- D4221 21 Replacement bo"tn. Cleaning DBA frItevam#

O Corrective flanged connection. Interval#3 Measure Period #1 3 0 Repair HCV-14-8B Replaoe Valve end boling. CHECK IFYES0 1R22005 SU.- 04223 EZ Replacement Interval#3 0 Corrective Measure Period #1 3 E Repair HCV-14-9 Replace Valve and bolting CHECK IFYES E 1126/2005 SU2- 04224 RI Replacement Interval#3 O Corrective Measure Period #1 3 0 Repair ICW PP Replace Purnp Yd rebuIlt spare CHECK IFYES O 115R005 SL2- 04225 21 Replacement 2C Interval U O Corrective Measure Period #1 1 0 Repair V3525 Replace Valve Disc. CHECK IFYES O 1/23/2005 SU2- 04226 RI Replacement Interval #3 O Corrective Measure Perod #1 2 0 Repair V8202 REMOVE I OVERHAUL CHECK IFYES 212005 SU2- 04227 21 Replacement VALVE. REINSTALL VALVE O Correct=ve USING NEW INLET BOLTING. Interval#3 Measure Period #1 1 0 Repair V3524 Reploae valve disc CHECK IF YES O 1U22/2005 SU2- 04228 2I Replacement Interval#3 El CorrectiveInevl3 Measure Period #1 B 2RepaIr SE4-3-1D SE-O3-IDREMOVE/REWELD CHECKIFYESO 1/27/2005 SU2- 04230 O Replacement SEALWELD O Corrective IntarvaII3 Measure Period #1 2 0 Repair LCV- Inspect Valve Itemals, CHECK IFYES E 1/30/2005 S12- 04233 21 Replacement 21 t0P replace stem and disc easy.

El Corrective Interval #3 Measure Period #1 3 0 Repair TCV-14-4B Replace valve (by bolting). CHECK IFYES E 1/22'2005 S2- 05235 21 ReplacementInevl#

O Corrective Interval#3 Measure Period #1 Page 4 of 7

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 12 TABLE 3 Abstract of Repairsn Replacements, or Corrective Measures Required for Continued Service PSL 2-3rd Interval, tst Period Code Repalr, Flaw or relevant Date RepaW Class Replacement.Dsrito condillon found Complete Replacement or Corrective It ork cduring scheduled Plan Number Measure Decrton Wrk ISI exam or test?

3 0l Repair CW-73 Replace flange bolting. CHECKIFYESO 2tti/2005 SL2- 05236 0 Replacement Replace Load Pin on restraint O Coretive CW43003-7011. Interval #3 Measure Period #1 3 El Repair SS-21-IS Replace Flange Bolting Cover CHECKIFYESO 1t22t20W SL2- 05237 E, Replacement Eoiting Interval #3 El Corrective Measure Period #1 3 0 Repair V08163 Replace Check vave disc CHECK IF YES 12212005 SL2- 05238 0 Replacement Interval #3 E Corrective Measure Period #1 2 0l RepaIr SI4204- Replace snubber with new or CHECK IF YES O 2t7R20 SL2- 05239 0 Replacement 12705 tesW sp re.

o Corrective Intral t3 Measure Period #1 2 0 Repair SO-03-20 Replace 28 HPSI PP Disch CHECK IF YES O 1121/2005 SU2- 05240 0 Replacement flange bolting O Corective Interal#3 Measure Period #1 2 0l Repair FCVW25-36 Replace Valve disc, CHECK IF YESO 1/18l2005 SU2- 05241 0 Replacement Containment Isolation Valve El Correciive for Hydrogen Purge Interval #3 ieasure Period #1 1 0 Repair PCV. Welded repair of body gasket CHECKIFYESOE 112S2005 SU2- 05243 E3 Replacement 11OCF face.

El Corrective Interval#3 Measure Period t1 3 E Repair CW-29 Repair corrosion by . CHECK IF YES O 11222005 SL2- 05244 O Replacement mechanically attached patch l pate httachedtoinside pipe Intervalt3 Measure applied. Period S1 3 0 Repair V08163 Tack-weld valve seat Inplace CHECK IF YES E 1122005 SU2- 05248 O Replacement Interval #3 O Corrective Measure Period #1 2 E Repair V3414 Removeirewekd seal weld CHECK IF YES O 1222005 SU-205249 El Replacemenl O Corrective Inbrvat 3 Measure Period N1 0 RepaIr RVCH Repair CEDM Nozies 27.32. CHECK IF YES El 214o2005 S-2 05250 El Replacement and 56 by welding. Interval O Corrective Measure Period #1 Paqc 5 of7

St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 13 TABLE 3 Abstract of Repairs. Replacements. or Corrective Measures Required for Continued Service PSL2.3rdInterval, 1st Period Code Repair, Flaw or relevent Date Repaid Class Replacement, Descripton condition found Complete Replacement or Corrective Item 0dWork during scheduled Plan Number Measure Description oWrkISI exam or test?

2 0 Repair FE-3327 Replace Flange Bolting. CHECK IFYES 0 112312005 SU.2-05252 0 Replacement Interl #3 O Corrective Measure Period 61 1 Repair SE-02-1 Replace Vale Internals. CHECK IFYES 3 1)31/2005 SU2- 05254 0 Replacement Removekeweld seal weld O Corrective Interal #3 Measure Period #1 3 0 Repair V02000 Replace valve disc and stern CHECK IFYES El 1)26/2005 612- 05255 0 Replacement sse . Interval #3 O Corrective Measure Period #1 3 0 Repair V21208 Reinstal 2B ICW PP Diach CHECK IFYES 0 1)27)2005 SU2- 05257 0 Replacement Check Valve using new nuts. Interval #3 o Corrective Measure Period #1 2 0 Repair MS-3023- Replace Pipe Clamp CHECK IFYES O 217/2005 812- 05258 0 Replacement 11B 0l Corrective Interval #3 Measure Period #1 2 0 Repair St-11 MODIFYRESTRAINTS SI- CHECKIFYES O 216)2005 SL2- 05260 0 Replacemrent 2414-110andSI-2412-170 O Corrective Interval #3 Measure Period #1 2 0 Repair MV48-198 Inspect Valve Intemals. CHECK IFYES 0 2/)005 SL2. 05261 0 Replacement Replace Sterl/Plug, O Corrective Body/Bonnet bolting Interval3 Measure Period #1 2 0 Repair MV-08-19A Inspect Valve Intemnals. CHECK IF YES 0 2i3)oos SL2 05262 0I Replacement Replace SternIPrg, o Corrective Body/Bonnet bolting Interval #3 Measure Perod #1 3 0 Repair V21205 Replace Check Valve and CHECK IFYES0 210)2005 82- 05263 0 Replacement bolting. Interval #3 E Corrective Measure Perod t1 I 0 Repair SG 28 Reploce 5 Primary Marnway CHECK IFYES O 2/1005 S12. 05265 0 Replacement Studs damaged during O Corrective maintenance Interval #3 Measure Period #1 2 0 Repair V3513 Replace Inlet Flange Bolting CHECK IFYES 0 2Z/92005 SL2- 05266 0 Replacement Interval #3 O Corective Measure Period #1 Pap 6 of 7

1 -' 1 St. Lucie Unit 2 Docket No. 50-389 L-2005-101 Enclosure Page 14 TABLE 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service PSL2-3rd Interval, 1st Period Code Repair. Flaw or relevent Date Repair/

Class Replacement, condition found Complete Replacement or Corrective Item duregsccduedpltiNube Measure Descrip0on ofwo1dn se orledt?

du PlanNumber 1 0 Repair SO-03-1 1 Replace SO-03-11 by welding CHECK IF YES 0 211112005 SL2. 05267 0 Replacement 0i Corrective Interval #3 Measure Period #1 Page 707