ML060520075

From kanterella
Revision as of 08:51, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forthcoming Closed Meeting with Omaha Public Power District to Discuss the GSI-191 Audit Comments and Plans to Resolve Open Issues
ML060520075
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/21/2006
From: Wang A
Plant Licensing Branch III-2
To: Terao D
Plant Licensing Branch III-2
Wang A
References
Download: ML060520075 (4)


Text

February 21, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Alan B. Wang, Project Manager/RA/

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING CLOSED MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)

DATE & TIME: Tuesday, February 28, 2006 1:00 p.m. - 4:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-13B4 Rockville, Maryland 20852 PURPOSE: OPPD will discuss the GSI-191 audit comments and plans to resolve open issues (see attached agenda).

PARTICIPANTS: Participant from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC OPPD GE ALION D. Solorio J. Gasper B. Smith J. Bostelman R. Architzel T. Matthews, et al.

S. Lu L. Whitney M. Koval A. Wang, et al.

Docket No. 50-285

Attachment:

Agenda (ADAMS Accession No. ML060520075) cc w/att: See next page Meeting

Contact:

Alan Wang, NRR 301-415-1445 ABW@nrc.gov

ML060520075) cc w/att: See next page Meeting

Contact:

Alan Wang, NRR 301-415-1445 ABW@nrc.gov DISTRIBUTION: PUBLIC LPLIV Reading Receptionist (OWFN & TWFN) (Hard Copy)

RidsNrrAdro (BBoger) RidsNrrPMAWang RJasinski RidsNrrDorl (CHaney/CHolden) RidsNrrLALFeizollahi RidsOgcRp RidsNrrDorlLplg (DTerao) RidsNrrAdro (CDorsey) RidsAcrsAcnwMailCenter RidsOpaMail JDixon-Herrity, EDO RidsRgn4MailCenter (DGraves)

DSolorio RArchitzel SLu LWhitney MKoval ADAMS ACCESSION NUMBER: ML060520075 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC1 NAME AWang LFeizollahi DTerao DATE 2/21/06 2/21/06 2/21/06 MEETING AGENDA OMAHA PUBLIC POWER DISTRICT UPDATE OF MEASUREMENT UNCERTAINTY UPRATE FEBRUARY 28, 2006 1:00 pm Introduction 1:15 pm Meeting Purpose 1:30 pm Selected Loss-of-Coolant Accidents 2:15 pm Debris Generation and Transport 2:45 pm Test Performed and Planned 3:15 pm Scaling Test Data to Plant 3:45 pm Summary and Actions 4:00 pm Conclusion and Staff Comments

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 Lucas State Office Building, 5th Floor 321 East 12th Street Chairman Des Moines, IA 50319 Washington County Board of Supervisors P.O. Box 466 Mr. R. T. Ridenoure Blair, NE 68008 Vice President - Chief Nuclear Officer Omaha Public Power District Mr. John Hanna, Resident Inspector Fort Calhoun Station FC-2-4 Adm.

U.S. Nuclear Regulatory Commission Post Office Box 550 P.O. Box 310 Fort Calhoun, Nebraska 68023-0550 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 January 2006