ML060520075
| ML060520075 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/21/2006 |
| From: | Wang A Plant Licensing Branch III-2 |
| To: | Terao D Plant Licensing Branch III-2 |
| Wang A | |
| References | |
| Download: ML060520075 (4) | |
Text
February 21, 2006 MEMORANDUM TO:
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Alan B. Wang, Project Manager/RA/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CLOSED MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)
DATE & TIME:
Tuesday, February 28, 2006 1:00 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-13B4 Rockville, Maryland 20852 PURPOSE:
OPPD will discuss the GSI-191 audit comments and plans to resolve open issues (see attached agenda).
PARTICIPANTS:
Participant from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC OPPD GE ALION D. Solorio J. Gasper B. Smith J. Bostelman R. Architzel T. Matthews, et al.
S. Lu L. Whitney M. Koval A. Wang, et al.
Docket No. 50-285
Attachment:
Agenda (ADAMS Accession No. ML060520075) cc w/att: See next page Meeting
Contact:
Alan Wang, NRR 301-415-1445 ABW@nrc.gov
ML060520075) cc w/att: See next page Meeting
Contact:
Alan Wang, NRR 301-415-1445 ABW@nrc.gov DISTRIBUTION: PUBLIC LPLIV Reading Receptionist (OWFN & TWFN) (Hard Copy)
RidsNrrAdro (BBoger)
RidsNrrPMAWang RJasinski RidsNrrDorl (CHaney/CHolden)
RidsNrrLALFeizollahi RidsOgcRp RidsNrrDorlLplg (DTerao)
RidsNrrAdro (CDorsey)
RidsAcrsAcnwMailCenter RidsOpaMail JDixon-Herrity, EDO RidsRgn4MailCenter (DGraves)
DSolorio RArchitzel SLu LWhitney MKoval ADAMS ACCESSION NUMBER: ML060520075 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC1 NAME AWang LFeizollahi DTerao DATE 2/21/06 2/21/06 2/21/06 MEETING AGENDA OMAHA PUBLIC POWER DISTRICT UPDATE OF MEASUREMENT UNCERTAINTY UPRATE FEBRUARY 28, 2006 1:00 pm Introduction 1:15 pm Meeting Purpose 1:30 pm Selected Loss-of-Coolant Accidents 2:15 pm Debris Generation and Transport 2:45 pm Test Performed and Planned 3:15 pm Scaling Test Data to Plant 3:45 pm Summary and Actions 4:00 pm Conclusion and Staff Comments
January 2006 Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn ATTN: James R. Curtiss, Esq.
1400 L Street, N.W.
Washington, DC 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, Nebraska 68023-0550